| 1 | 1₹1.4 CrAccepted-AOC BEHIND WATER WORKS ST NO 4 JAIN NAGRI ROAD ABOHAR | ₹1.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.5 Cr+₹8.3 L (5.91%)Rejected-AOC | ₹1.5 Cr+₹8.3 L (5.91%) | 2 | Rejected-AOC L2 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
14 Jan 2025, 10:00 amClosed
Xen Fazilka Canal And Ground Water Division CC FZR
Xen Fazilka Canal And Ground Water Division CC FZR
Estimate for Concrete Lining of New Machhiwara Link Channel from RD 0-8000 including Construction of V.R Bridge at RD 2380 , RD 7400, Field Path at RD 3870 , 5885 and Repair Head Regulator
2024_WR_129834_6
009/FazilkaCanal/2024-25 dated 13/11/2024
Open Tender
Civil Works - Canal
Item Rate
Xen Fazilka Canal And Ground Water Division CC FZR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
₹2.8 L
Yes
31 Jan 2025
4 Jan 2025
14 Jan 2025
4 Jan 2025
14 Jan 2025
4 Jan 2025
Amount
Excavation in soil using Excavator and hydraulic Tractor trolley including cutting and loading in trolley and Transporting to the embankment locations with all lift and leads ,excluding royalty
E/work in excavation in foundation/ trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 mtr depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation (For Sleepers and coping)
Excavation in soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead upto 30m.
Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications.
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth)
Dressing of side slopes and preparation of sub grade for lining complete in all respect as per PWD specifications and engineer-in-charge.
Centering & shuttering for faces of concrete foundation and foundation beam and plinth beam ( vertical or battering)
Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic to the site in transit computerized transported mixers with an average lead of 1 Km (FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (Without mechanical Paver)
Providing and laying cement concrete (M-15) for coping & Sleepers mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.
Extra bitumen painting at 0.69 kg per sqm. Priming coat as per IS 3384-1985 for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.
Laying LDPE film of 150 microm over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.
Filling expansion joints with special impervious hot pour 12.5 mm wide.
Dressing of earthwork for new work or remodeling work Unit
Ordinary Jungle Clearance of both banks running Minor having Discharge up to 1.5 Cum/s
Laying cement concrete 1:3:6 (M-10) with stone ballast or shingle I/c supply and carriage of material at site of work complete in all respect
Laying R.C.C. 1:2 :4 (M-15) excluding steel reinforcement but including centering and shuttering and vibrating the concrete
Providing ,Bending ,binding and placing in position steel reinforcement
Earth work involved in constructing new Open lume, A.P.M. or O.S.M. type Outlets With ‘H‘ upto 0.5 m.
Extra labour for dressing of bricks on Open Flume and APM type outlet With ‘H‘ upto 0.5 m.
Adjusting A.P.M. to the correct ‘Y‘ and fixing in position:-
Cement Conc 1:4:8 mechanically mixed with stone ballast or shingle using concrete mixer volumetric type
1st Class burnt Brick work laid in csm 1:4 in foundation & Plinth
Dry brick on edge paving sand grouted over 50mm thick earth and mudplaster
Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete.
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixture as per IS 1791 and vibrator by needle vibrator but excluding steel reinforcement and centring-shuttering in foundation and plinth
Centering and shuttering for flat surfaces such as suspended floors, roofs, landigs, chajjas, shelves etc.
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986- 1976 for Patrolling and Non Patrolling Bank (0.40 ft- 12.2 cm (min wt 76 kg))
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making as per ISI specifications no. 7986-976 with Bt = 0.20 ft= 6.1 cm (min wt 65 kg)
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making as per ISI specifications no. 7986-976 with Bt = 25 ft= 7.6 cm (min wt 68 kg)
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making as per ISI specifications no. 7986-976 with Bt = 0.32 ft= 9.9 cm (min wt 72 kg)
Dismantling of Old Bridge (RCC Main Slab)
Dismantling brick work, tile masonry or tile lining (in cement mortar).
Earth work in Excavation in of foundation of structure as per drawing and technical specification , including setting out, construction of shoring and bracing , removal of stumps and other deleterious matter (DEPTH UP TO 3 MTR)
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. PCC Grade M15
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Furnishing and placing reinforcement / prestressed cement concrete RCC M-25 in sub-structure height upto 5 mtr using Using Batching Plant, Transit Mixer and Concrete Pump including centering and shuttering complete as per drawing Technical specifications .
R.C.C M25 in open Foundation complete as per drawing and specifications.
Furnishing and placing reinforcement / prestressed cement concrete RCC Grade M-25 for solid slab for super-structure including shuttering & centering by Using Batching Plant, Transit Mixer and Concrete Pump including centering and shuttering as per Drawing and Technical specification
Reinforcement Cement concrete Approach Slab using M-30 GRADE concrete including Reinforcement and form works complete as per drawing and technical specification
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and Technical Specifications.
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade.
Applying priming coat with cement primer in all shade on newly plastered or concrete exterior surface
Filling expansion joints with special bituminous material of size 450 mm depth and 20 mm wide
Drainage Spouts complete as per drawing no. SD/205 and Technical specification with 0.6 meter long GI 100 mm dia discharge GI light grade pipe (for Bridges)
Cautionary sign board 900x900x900mm triangular as per IRC 67- 2012 with high intensity Microprismatic grade retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 as per clause 6.9 of IRC 67-2012 for retro reflective sheeting
Earthwork excavation in ordinary soil, exclusive of compensation of earth:- Extra for pudding work.
Providing & Laying center line with thermoplastic paint
Filling contraction joints with special impervious hot pour as per design and approved specifications
Any Other Item
GURINDER PAL SINGH CONTRACTORS (BID ID -610394)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .