Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹7,070
Closing Date
3 Jul 2026, 6:55 pmDue tomorrow
Pradhan Kagay Gram Panchayat
Kagay Gram Panchayat
CONSTRUCTION OF WATER TANK AT RUPAN JHORA TO MALAYCHUNG GAON, DUKA, KAGAY GRAM PANCHAYAT
2026_GTA_1029514_1
NIeT No.04/XVCFC/KGP/2026,(3rd Call)Dated,24.06.2026
Open Tender
CIVIL WORKS
Duka, under Kagay G P
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹7,070
Yes
24 Jun 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | - | m3 | 119.27 | - |
| 2 | Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. | 0.6 | m3 | 3,964.8 | ₹2,378.48 |
| 3 | Cost of stone boulder 150mm mm of N. Bengal variety | 0.4 | m3 | 1,526.4 | ₹610.56 |
| 4 | Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS Codes. | 1 | m3 | 7,268.66 | ₹7,267.93 |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel. | 0.48 | MT | 72,265.2 | ₹34,686.57 |
| 6 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). | 1 | m2 | 400.8 | ₹400.4 |
| 7 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. | 1 | m2 | 257.64 | ₹257.38 |
| 8 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. | 1 | m2 | 39.52 | ₹39.48 |
| 9 | Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including cost of jointing materials paints etc. fitting and fixing all necessary specials, cutting pipes, making threads,
cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge.
(Payment will be made on centre line measurement of the total pipeline including specials. ) | - | M | 32.4 | - |
| 10 | Supply of High Density Poly-ethylene Pipe conforming to IS-4984-1985 (Dia)[PE-63]. | - | M | 132 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
BOQ_2528433.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid