| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-AOC | ₹9.7 Cr Quoted ₹10.4 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹10.7 Cr+₹29.0 L (2.79%)Rejected-Finance | ₹10.7 Cr+₹29.0 L (2.79%) | L2 | Rejected-Finance Among the three bidders, this bidder has quoted the Highest Value. |
| 3 | L3₹11.4 Cr+₹98.7 L (9.52%)Rejected-Finance | ₹11.4 Cr+₹98.7 L (9.52%) | L3 | Rejected-Finance Among the three bidders, this bidder has quoted the Highest Value. |
| Sl No | Description | Qty | Unit | A.PRABHAKAR REDDY AND CO L1 | M/s Vijay Infra & Co L2 | VS ANS SONS CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing scrub jungle etc complete complying with standard specifications and as directed by the departmental officers. | 72,650 | Square meter | 6.5 ₹4,72,225 Lowest | 6.85 ₹4,97,652.5 | 7.3 ₹5,30,345 |
| 2.00 | Dismantling clearing away and carefully stacking materials, useful for reuse for any thickness of wall of Stone masonry in Cement Mortar wall under 3m height etc complete complying with standard specifications and as directed by the departmental officers. | 30 | Cubic meter | 318 ₹9,540 Lowest | 327 ₹9,810 | 348.39 ₹10,451.7 |
| 3.00 | Conveying the Slipped / Fall down PCC slab from the site with additional head load of 100 m and additional lift of 4m and stacking the same carefully useful for reuse etc., complete complying with standard specifications and as directed by the departmental officers. | 80 | Cubic meter | 234 ₹18,720 Lowest | 241 ₹19,280 | 256.62 ₹20,529.6 |
| 4.00 | Earth work in all soils except Medium rock / hard rock requiring blasting and conveying for formation of bund with lead of 5Km by deploying earth moving machineries and tippers excluding benching, and levelling, formation of bunds, breaking clods, sectioning, with extra water and conveying the excavated earth to the low lying area or dumping yard at 5 Km as directed by the department officers etc., complete complying with standard specifications and as directed by the departmental officers | 75,000 | Cubic meter | 115 ₹86,25,000 Lowest | 118 ₹88,50,000 | 125.93 ₹94,44,750 |
| 5.00 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete complying with standard specifications and as directed by the departmental officers. With of 3m to 10m, including 5 KMMR Conveying for dumping in the low lying areas | 15,020 | Cubic meter | 102 ₹15,32,040 Lowest | 104 ₹15,62,080 | 111.44 ₹16,73,828.8 |
| 6.00 | Extra for every additional 1 metre lift or part thereof over the initial lift etc complete complying with standard specifications and as directed by the departmental officers. (3 Lift) | 15,020 | Cubic meter | 41 ₹6,15,820 | 40 ₹6,00,800 Lowest | 42.84 ₹6,43,456.8 |
| 7.00 | Earth Work Excavation for foundation in all soils and sub soils and to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers (Narrow Excavation) | 780 | Cubic meter | 247 ₹1,92,660 Lowest | 254 ₹1,98,120 | 270.6 ₹2,11,068 |
| 8.00Supplying and erecting centring for vertical plain / RCC concrete walls of supply channel, retaining wall etc of following height with necessary supports, all cross bracing with mild steel size of 90 cm x 60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x 25 mm x 3 mm for bearing laid silver Oak / Country wood joist of size 7.50 cm x 5.0 cm spaced @ about 90 cm C / C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C / C, etc., complete complying with standard specifications and as directed by the departmental officers (Vertical Centering) | ||||||
| 8.01 | 0 to 0.9 m height | 3,530 | Square meter | 580 ₹20,47,400 Lowest | 597 ₹21,07,410 | 635.95 ₹22,44,903.5 |
| 8.02 | 0 to 1.8 m height | 770 | Square meter | 669 ₹5,15,130 Lowest | 687 ₹5,28,990 | 732.55 ₹5,64,063.5 |
Tender Value
₹9.9 Cr
EMD Value
₹5.1 L
Closing Date
4 Sept 2025, 12:00 pmClosed
Superintending Engineer, WRD
O/o Superintending Engineer, WRD., Palar Basin Circle, Chennai
Strengthening the Slipped damaged portion at various places of Kandaleru Poondi Canal between LS.0.00 KM to 3.87 KM in Uthukottai Taluk of Tiruvallur District
2025_WRD_597116_1
e-Tender Short Term Notice No.04 PBC / 2025-26 / Dt.22.08.2025
Open Tender
Civil Works
Lump-sum
274 days
Thiruvallur
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹5.1 L
29 Oct 2025
25 Aug 2025
4 Sept 2025
25 Aug 2025
4 Sept 2025
28 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_713654.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .