| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-Finance 92 M DHARAMPUR DHARAMPUR SHAHPUR VILLAGE TOWN SHAHPUR CITY GORAKHPUR GORAKHPUR UTTAR PRADESH 273006 INDIA | GORAKHPUR | UTTAR PRADESH | 273006 | L1 | Accepted-Finance Quoted rate is lowest | |
| 2 | L2₹14.0 L+₹67,787 (5.09%)Rejected-Finance | L2 | Rejected-Finance Quoted rate is on higher side |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
29 May 2025, 1:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY TRANSMISSION CIRCLE, 220 KV SUB STATION GIDAHI BASTI
Supply of material and Erection of Equipments and Structure for construction of 01 No. 132/33KV Bay at 132KV Sub-Station Harraiya under Electricity Transmission Division-I, Basti
2025_UPTCL_1030921_1
E-Tender No.09/ETC(B)/2025-26
Open Tender
Electrical Works
Lump-sum
30 days
220 KV SUB STATION GIDAHI BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹1,652
UPSEB ELECTRICITY TRANSMISSION DIVISION BASTI
₹14,000
28 Jun 2025
21 Apr 2025
30 May 2025
21 Apr 2025
29 May 2025
21 Apr 2025
Amount
SUPPLY
Pale fencing
Earthing 40 mm MS rod for main earthing
Earthing 40 mm MS Electrodes ( 3 meter longs)
M.S. Flat for earthing 75x10
M.S. Flat for earthing 50x6
Air Conditioning System
Two ton window AC with all accessories and stabilizer(Not less than 5KVA Capacity) with installation
Single tension fitting suitable for
ACSR Moose
ACSR Panther
Single Suspension fittings Suitable for
ACSR Moose
ACSR Panther
PG Clamp suitable for
Moose/ Moose
Moose/Panther
Panther/Panther
Bus Post Clamp Suitable for
Panther
Twin Panther
Moose
Lightening Fixture LED Luminaries Type SL-DI as per tech Specifications
Erection of main & auxiliary structure consisting of column. Beam peak, mast etc and auxiliary structure of installation of CTs, LA etc. The job consists of shifting of all materials from store to site of erection and erection of structures as per drawing with the help of GI nut & bolts, flat & spring washer with matching the hole, cutting & matching of member if required, including cost of all men and T&P excluding GI structure Nut & bolts to complete the work. GI structures, nut & bolts and washer will be provided by department free of cost.
Erection of 145 KV Equipment's
145 KV Bus/line and tandom Isolator
145 KV Current Transformer
145 KV Post Insulator
120 KV Lightening arrestor
145 KV CT Junction box
132 KV Transformer (C&R) panel
145 KV SF-6 Circuit Breaker
Erection of 33 KV Equipment's
33 KV vacuum circuit breaker
33 KV Isolator
33 KV Current Transformer
33 KV Lightening arrestor
33 KV CT Junction box
Stringing of three phase jack bus 132 KV with panther conductor. The work includes cutting & bending of conductor, fixing of single/double bolted type tension fitting/suspension. Hoisting of disc insulators and shifting of material from store*site to erection site and all other associated work to complete the job satisfactorily as per instruction of engineer incharge.
132 KV Jack bus for transformer
132 KV making of U Jumpers
Equipment's interconnection jumpering with main bus bar. Job includes bending of conductor in proper shape tightening with the help of clamps and all other associated work to complete the job.
Transformer bay for 132 & 33 KV side
Laying and termination of following size control cable in trench/Cable trays from different control room C&R panels to switchyard equipment's (132/33 KV CB, CT their junction boxes . Transformer marshalling etc) in 132/33 KV switchyard as per cable schedule including carriage of cable drum from store and all other associated work.
Termination of control cable ( per termination)
Cutting strengthening bending and laying 700 mm/500 mm below inside ground and above ground of following size M.S. flat for earthing of main and Auxiliary structure and equipment's including welding with main earth mat and with objects to be earthed, excavation trenches and back filling painting and all other associated work as required to complete the work satisfactorily. M.S. flat will be providing by the contractor free of cost.
Making delta earthing of 120 & 33 KV LA by fabrication of 03 Nos 3 mtr M.S. round bar ( 36/40 mm dia) electrode it piercing inside the ground and connecting all 03 Nos electrodes with 36/40 mm M.S. round laying around as per drawing painting the jointing with 75x10 mm M.S. round bar laying around as per drawing. Painting the joints with black japan paint of good quality after proper cleaning of joints by wire brush MS round bar will be provided by dept, free of cost.
Dismantling of 250K.VA 33/0.4K.V station T/F work includes opening of jampers/cable connection/cutting of earthing etc.
Laying of 300/400mmsq. 3.5core power cable from control room to station T/F
Erection of 250KVA 33/0.4KV station T/F work includes jumpering from bus to T/F and cable connections from station T/F to ACDB, earthing of station T/F and other associated work to complete the job.
Distringing of three phase 33 KV main bus bar section 1 of twin moose conductor by opening of required jumpers, clamps etc.
Stringing of three phase 33KV main bus bar of twin moose conductor and jumpering with equipment's and all other associates work to complete the job satisfactory.
Dismantling of sub station structures including all others associated work to complete the job satisfactory.
Dismantling of following installed equipments after cutting of earthing and taking out cable connection including its shifting from switchyard to store for shifting of 1x5 MVAR capacitor bank
33 KV Isolator
33 KV Fuse set for S/S T/F
1x5 MVAR Capacitor bank units with structure
Series reactor
Opening of jumpers of capacitor bank & associated equipment's
Dismantling of 33 KV NCT
Erection of sub station structures
Erection of following equipment's including shifting from store to erection site including all other associated work to complete the iob satisfactory.
33 KV Isolator
33 KV Fuse set for S/S T/F
Capacitor bank with structure & Unit
Series reactor
Making of all jumpers connection by panther conductor.
Earthing of structures and equipment's by MS flat size 50x6 mm. M.S. flat provided bv the contractor.
Cable laying ( if required) and termination of cable for 1x5 MVAR capacitor bank.
Laying of 40mm dia round bar 700mm below ground level including cutting, straightening, welding, painting, excavation of earth in trench from back filling after completion of work with all other associated work to complete the job satisfactory, excluding cost of 40mm dia round bar.
Harshit Enterprises (BID ID -5222570)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .