| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹60,185.90Accepted-AOC | ₹60,185.90 | H2 | Accepted-AOC Accepted |
| 2 | H1₹60,801Rejected-Finance | ₹60,801 | H1 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | K P & CO H1 | mageswari H2 |
|---|---|---|---|---|---|
| 1.00 | Dismandling the existing PCC Including cost and conveyanceof all materials etc.. Complete | 6 | M3 | 488 ₹2,928 | 486 ₹2,916 |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 5.5 | M3 | 280 ₹1,540 | 271 ₹1,490.50 |
| 3.00supply and fixing of pvc pipes and special including all cost and conveyance etc., complete as per standard specification. | |||||
| 3.01 | 8'' PVC pipe | 28 | M2 | 700 ₹19,600 | 696 ₹19,488 |
| 3.02 | 8'' elbow | 5 | Nos | 560 ₹2,800 | 556 ₹2,780 |
| 3.04 | 8''Coupler | 2 | Nos | 330 ₹660 | 300 ₹600 |
| 4.00 | Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.(SOR TWAD,P.G NO:280, SI.NO:11b) | 28 | M2 | 41 ₹1,148 | 39 ₹1,092 |
| 5.00 | refilling for pipe line works having bed width of 1.25M and below on linear mesurement basis | 5 | M2 | 37 ₹185 | 35 ₹175 |
| 6.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1.7 | m3 | 5,200 ₹8,840 | 5,162 ₹8,775.40 |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 3.5 | m3 | 6,600 ₹23,100 | 6,534 ₹22,869 |
Tender Value
₹75,000
Closing Date
19 Dec 2025, 3:00 pmClosed
Sattur Muniicipality
Sattur Muniicipality
Interlinking UGD Connection for old bus stand toilet in sattur municiplity
2025_MAWS_631881_1
747/2025/M1
Open Tender
Civil Works
Sattur Muniicipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
13 Feb 2026
13 Dec 2025
19 Dec 2025
13 Dec 2025
19 Dec 2025
13 Dec 2025
Dismandling the existing PCC Including cost and conveyanceof all materials etc.. Complete
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
supply and fixing of pvc pipes and special including all cost and conveyance etc., complete as per standard specification.
8'' PVC pipe
8'' elbow
8''Coupler
Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.(SOR TWAD,P.G NO:280, SI.NO:11b)
refilling for pipe line works having bed width of 1.25M and below on linear mesurement basis
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_755817.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_755817.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid