Loading…
Loading…
Tender ID
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.7 LAWARDED | AWARDED |
Tender Value
₹5.7 L
EMD Value
₹14,141
Closing Date
8 May 2025, 9:30 pmClosed
Directorate of Municipal Administration
Shiffting of OD and 11 KV over head line at APC Circle Jigani town Ward no.06 for Beautification of APC Circle
DMA/2025-26/EL/WORK_INDENT38336
DMA/2025-26/EL/WORK_INDENT38336
Open
Electrical
Electronic Documents, First(One Cover)
DMA Town Municipal Council Jigani
₹500
₹14,141
21 Apr 2025
21 Apr 2025
30 Apr 2025
Shiffting of OD and 11 KV over head line at APC Circle Jigani town Ward no.06 for Beautification of APC Circle
11 kv 3x400 sqmm XLPE UG cable, (Material cost)
Stright through jointing kits HS type suitable for 3x400 sqmm cable (Material cost)
Cable termination kit indoor HS type suitable for 3x400 sqmm cable (Material cost)
Cable covering tiles 250x125x40 mm or 125x125x40 mm (Material cost)
Artficial/manufacture sand (Material cost)
RCC hume pipes,2000mm long,150 mm Dia (Material cost)
Route & joint indicating stones (Material cost)
Spun pole 11 mtr long (Material cost)
Spun pole Str materials (Material cost)
Rabbit conductor (Material cost)
11 kv 400A GOS S/B (Material cost)
11kv 5kn polymer pin insulator (Material cost)
70/90 kn disc insulator (Material cost)
Strin clamp 3 bolt type for disc insulator (Material cost)
Earthing materials (Material cost)
3x95 + 1x70 Sqmm (Insulated Messenger Wire)
11 kv 3x400 sqmm XLPE UG cable (Labour Cost)
Stright through jointing kits HS type suitable for 3x400 sqmm cable (Labour Cost)
Cable termination kit indoor HS type suitable for 3x400 sqmm cable (Labour Cost)
Cable covering tiles 250x125x40 mm or 125x125x40 mm (Labour Cost)
Artficial/manufacture sand (Labour Cost)
RCC hume pipes,2000mm long,150 mm Dia (Labour Cost)
Spredding sand & forming with sand round the cable (Labour Cost)
Route & joint indicating stones (Labour Cost)
Spun pole 11 mtr long (Labour Cost)
Spun pole Str materials (Labour Cost)
Base concreting 1:2:4,1000x1000x150 MM (Labour Cost)
Pole cocreting 1:2:4,1000x1000x2500 MM (Labour Cost)
Coping 1:2:4 (As per Actuals) (Labour Cost)
Rabbit conductor (Labour Cost)
11 kv 400A GOS S/B (Labour Cost)
Earthing materials (Labour Cost)
Construction of platform with size stone, cement concert for erection of 100KVA Transformer (Labour Cost)
Releasing & reerrection of OD (Labour Cost)
Releasing & restringing of coyote conductor
Miscellaneous + Releasing of assets + Area specific loding and others Materials (Labour Cost)
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .