| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.2 LAccepted-AOC | 1 | Accepted-AOC aoc | |
| 2 | 2₹17.5 L+₹28,250.61 (1.64%)Rejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | 2 | Rejected-Finance 2nd | |
| 3 | 3₹19.9 L+₹2.7 L (15.6%)Rejected-Finance 56 LAKSHMANPUR COLONY ALLAHABAD ROAD SULTANPUR | SULTANPUR | SULTANPUR | UTTAR PRADESH | 3 | Rejected-Finance 3rd | |
| 4 | Rejected-Technical 56 LAXMANPURI COLONY ALLAHABAD ROAD SULTANPUR | SULTANPUR | SULTANPUR | UTTAR PRADESH | - | Rejected-Technical Not qualified in technical evelution |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
18 Aug 2022, 5:00 pmClosed
EE
rdsc rbi
reconstruction vrb of sabji dy. km 2.301
2022_UPIDC_720588_1
1277/rdsc/15/2022-2023
Open Tender
Civil Works - Canal
Item Rate
30 days
raebareli
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
₹2.0 L
Yes
2 Dec 2022
10 Aug 2022
19 Aug 2022
10 Aug 2022
18 Aug 2022
10 Aug 2022
Amount
Earth Work in making Ramp / approach road / diversion including carriage of earth by means of transport and all labour , T&P required to complete the job with proper manual ramming and compaction to prepare earthen surface for immediate transportation use of road.
Dry Brick on edge solling for making Ramp including preparing sub-grade,filling joints with local earth spreading, a binding coat of 1 cm of local earth on entire surface made and all labour , T&P to complete the job per sq. metre.
Earthwork in excavation in foundation including chharri-bajari, wet earth, slush kanker which is not separable i.e. all type of soils including dewatering with all leads, lifts, labour, T&P and proper disposal etc complete.
Providing and laying A20-M10 mix (1:3:6) plain cement concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) in foundation complete in all respect excluding centering shuttering but including all cost of material, labour and T&P etc to complete the jobas per sanctioned drawing & specification in the direction of Engineer- In - Charge Per cum.
Brick masonry in 1:4 C.M with OPC cement and banda c-sand (F.M 1.5 - 2.0) mortar using M-150 class Bricks complete in all respect including all lead, lifts, all cost of material, labour, curing ,T&P required for proper completion of work as per sanctioned drawing & specification in the direction of Engineer-In -Charge. (Unit Cum.)
Providing and laying plain cement concrete A20-M15 mix (1:2:4) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the jobas per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Providing and Laying A20-M20 mix (1:1.5:3) Reinforced Cement Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material, labour & T&P required for proper completion of work but excluding centering and shuttering to complete the job as per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Providing and Laying A20-M25 mix (1:1:2) Reinforced Cement Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material, labour & T&P required for proper completion of work but excluding centering and shuttering to complete the job as per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Centering & Shuttering of RCC work including rent of shuttering material labour & T&P required for proper completion of work in Sqm.
Providing bending, binding, and placing of reinforcement Fe-500 / Fe-550 TMT deformed bars conforming to IS code to complete all respect including cost of material , labour, binding wire, T&P etc. per M.T
Providing and laying Tar paper between abutment and slab per sqm.
Providing and Laying 25 mm thick bituminus fillar board Per Sqm.
Providing & fixing 110 mm dia PVC pipe 6 kg in wt. in drainage outlet in slab per R.M
Struck cement pointing with cement sand mortar 1:2 complete in all respect including all lead lifts cost of materials labour and T&P etc. per sqm.
Preparation of sand/silt bed for pannel construction after compaction and to achieve 65%relative density at OMC including all materials ,labour etc compelet in respect as per drawing and specification in cum.
10 mm thick brick cement plaster on brick massonary in 1:4 cement sand mortar with floated neat cement including all cost of materials, labour and T&P etc. as per drawing & specification in SQM.
Providing 70 mm thick brick lining in 1:4 cement sand mortar complete in all respect including all cost of materials, labour and T&P etc. as per drawing & specification in SQM.
Providing and filling local sand as per direction of Engineer-In -Chargeat site per cum.
Earth work in restoring canal section or drain section and dismentalling of diversion after construction of pacca work including all initial lead and lift , all labour and T&P with proper dressing to profile per Cum.
Brick on edge pitching in 1:4 cement sand mortar including cost of all materials , labour and T & P etc.(unit SQM)
Costing and laying of porous blocks of siz230x230x180 mm in 1:4 cement and 20 mm coarse aggregate including all cost of materials labour T & P etc. to complete the work as per drawing and specification in Nos.
Hiring charges of 5 KV Gen set Including operator and P.O.L. for 8 hours running in night time. (Unit per day)
Providing and placing of sand/silt / earth filled new gunny bags, tying and sewing with sutli including lead upto 60M. stacking at proper places as per direction of engineer-in - charge per nos.
Supplying and placing Bamboo khunta and braces of 60 to 80 mm dia. including all cost of material ,labour and T&P . As per direction of Engineer-In-Charge to complete the work per R.M.
M/S CHAUDHARY ENTERPRISES
KUMAR TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .