| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance 268 KARGALI BAZAR BERMO BOKARO 829104 JHARKHAND | BOKARO | JHARKHAND | 829104 | ₹5.8 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical AT DHORI STAFF QTR P O DHORI DIST BOKARO | BOKARO | JHARKHAND | 825102 | - | - | Rejected-Technical Not relevant as per NIT. |
| 3 | Rejected-Technical 1BR COLONY POST BACHRA P S PIPARWAR DISTT CHATRA JHARKHAND | CHATRA | JHARKHAND | 825103 | - | - | Rejected-Technical Not relevant as per NIT. |
| Sl No | Description | Qty | Unit | M/s Kiran Electrical works L1 |
|---|---|---|---|---|
| .01Part-A Repairing, painting and reconditioning of 50 KVA and 15 KVA 3.3 KV/ 440 V lighting transformer." | ||||
| .02 | Repairing of transformer HT coil (03 limbs) | 45 | Kgs | 825 ₹37,125 Lowest |
| .03 | Insulating material cost. | 1 | Job | 5,569 ₹5,569 Lowest |
| .04 | Labour cost | 1 | Job | 5,569 ₹5,569 Lowest |
| .05 | Less scrap value | 1 | Job | 22,275 ₹-22,275 Lowest |
| .06 | Supply and fixing of stud with bushing | 6 | Nos | 5,500 ₹33,000 Lowest |
| .07 | Heating & testing of transformer | 1 | Job | 7,000 ₹7,000 Lowest |
| .08 | Transformer oil filtration | 120 | Ltrs | 15 ₹1,800 Lowest |
| .09 | Supervision, incidental & overhead expenses including contractor profit. | 1 | Job | 10,168 ₹10,168 Lowest |
| .10Part-B Mechanical repairing of 215KW, 3.3KV, 1490RPM, GEC make induction moter attached with 1000GPM pump installed at mine of AADOCM | ||||
Tender Value
Refer Docs
EMD Value
₹8,300
Closing Date
7 Jul 2026, 9:00 amClosed
STAFF OFFICER EnM
STAFF OFFICER EnM , Dhori Area
Repairing of two nos. of motor ( 215KW and 100KW) and two nos of transformer ( 50 KVA and 15 KVA) under AADOCM , Dhori Area.
2026_CCL_361461_1
GM(D)/SO(EnM)/NIT/2026-27/11 dtd- 26.06.2026
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
AADOCM
Please refer tender documents
2 documents required · 2 mandatory
₹8,300
28 Jul 2026
26 Jun 2026
8 Jul 2026
27 Jun 2026
7 Jul 2026
27 Jun 2026
27 Jun 2026 - 30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | Part-A Repairing, painting and reconditioning of 50 KVA and 15 KVA 3.3 KV/ 440 V lighting transformer." | - | - | - | - |
| 0.02 | Repairing of transformer HT coil (03 limbs) | 45 | Kgs | - | - |
| 0.03 | Insulating material cost. | 1 | Job | - | - |
| 0.04 | Labour cost | 1 | Job | - | - |
| 0.05 | Less scrap value | 1 | Job | - | - |
| 0.06 | Supply and fixing of stud with bushing | 6 | Nos | - | - |
| 0.07 | Heating & testing of transformer | 1 | Job | - | - |
| 0.08 | Transformer oil filtration | 120 | Ltrs | - | - |
| 0.09 | Supervision, incidental & overhead expenses including contractor profit. | 1 | Job | - | - |
| 0.1 | Part-B Mechanical repairing of 215KW, 3.3KV, 1490RPM, GEC make induction moter attached with 1000GPM pump installed at mine of AADOCM | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_374347.xls
BOQ • 0.30 MB
tcr.pdf
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .