Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | ₹7.6 L | L1 | Accepted-AOC L1 Bidder |
| Sl No | Description | Qty | Unit | PRINCE CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00Leakage Repairing of main supply pipeline leakage due to public interest and without disturbing water supplyi/c excavation of tranch along and over pipeline upto required depth i/c cutting of bit/cc/WBM/hard moorum road de watering by manual or handpump clearing of pipe dia meter cutting of damage pipepieline and taking out damage pipe piece from pit or trench and fixing of other fresh pipepieces same aize with help of c.i.d. joint back filling by excavated material after testing including transportation barricading rtc. complete job work including coat of all T&P CID joint PVC coupler of required size as per site condition including all labour charges job work | ||||
| 1.10 | 100 mm dia PVC/ACP pipeline | 40 | Job | 2,250 ₹90,000 |
| 1.20 | 150 mm dia PVC/ACP pipeline | 30 | Job | 2,680 ₹80,400 |
| 1.30 | 200 mm dia PVC/ACP pipeline | 35 | Job | 7,825 ₹2.7 L |
| 1.40 | 250 mm dia PVC/ACP pipeline | 20 | Job | 8,550 ₹1.7 L |
| 1.50 | 300 mm dia PVC/ACP pipeline | 15 | Job | 9,560 ₹1.4 L |
Tender Value
₹7.6 L
EMD Value
₹15,200
Closing Date
15 Sept 2025, 5:30 pmClosed
EE PHE Maintenance Division
Rajasv Colony Dashara Maidan Ujjain
Annual Repairing of different pipe line at Laxmi Nagar OHT.
2025_UAD_432317_2
PHE/E-TENDER 74/2025
Open Tender
Civil Works - Water Works
365 days
Ujjain
Please refer Tender Document
4 documents required · 4 mandatory
₹2,000
₹15,200
29 Jan 2026
30 Aug 2025
17 Sept 2025
30 Aug 2025
15 Sept 2025
30 Aug 2025
Amount
Leakage Repairing of main supply pipeline leakage due to public interest and without disturbing water supplyi/c excavation of tranch along and over pipeline upto required depth i/c cutting of bit/cc/WBM/hard moorum road de watering by manual or handpump clearing of pipe dia meter cutting of damage pipepieline and taking out damage pipe piece from pit or trench and fixing of other fresh pipepieces same aize with help of c.i.d. joint back filling by excavated material after testing including transportation barricading rtc. complete job work including coat of all T&P CID joint PVC coupler of required size as per site condition including all labour charges job work
100 mm dia PVC/ACP pipeline
150 mm dia PVC/ACP pipeline
200 mm dia PVC/ACP pipeline
250 mm dia PVC/ACP pipeline
300 mm dia PVC/ACP pipeline
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid