Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹21.9 Cr
EMD Value
₹43.7 L
Closing Date
22 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
General Manager Zone-3 UPPCL Lucknow
Office of the General Manager Zone-3 UPPCL Lucknow
Construction of CM Model Composite School at Vill. Rajwatiya Tah. Salempur Distt. Kushinagar (UP)
2026_UPPRC_1212102_1
26/GM-3/UPPCL/2026-27/Dated 21.11.2026
Open Tender
Civil Works - Buildings
Percentage
540 days
Kushinagar
As per bid documents
2 documents required · 2 mandatory
₹17,700
₹43.7 L
25 Nov 2026
25 Nov 2026
22 Dec 2026
25 Nov 2026
22 Dec 2026
25 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 2,400.58 | CUM | 181.75 | ₹4,36,305.42 |
| - | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 5,910.76 | CUM | 322.43 | ₹19,05,806.35 |
| - | Providing and laying in position cement concrete of specified grade 1:4:8 | 387.75 | CUM | 4,756.48 | ₹18,44,325.12 |
| - | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | 348.12 | CUM | 1,482.91 | ₹5,16,230.63 |
| - | Construction of drain along with apron. 150X150MM | 342.63 | RM | 828.79 | ₹2,83,968.32 |
| - | Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete. | - | - | - | - |
| - | (plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm | - | - | - | - |
| - | (4) Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution) | 2,744.62 | SQM | 216.49 | ₹5,94,182.78 |
| - | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work in Lintel | - | - | - | - |
| - | Ground Floor | 12.5 | CUM | 6,885.02 | ₹86,062.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
BID_DOC.pdf
Tender Documents • 14.27 MB
BOQ_2304808.xls
BOQ • 3.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .