| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.3 LAdmitted-Fee/PreQual/Technical/Finance SAMBALPUR | KHORDHA | ODISHA | 751001 | +0.00% | ₹42.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹42.3 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹42.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹42.3 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹42.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹42.3 LAdmitted-Fee/PreQual/Technical/Finance AT WARD NO 13 PO RAIRAKHOL DIST SAMBALPUR 768106 | SAMBALPUR | ODISHA | 768106 | +0.00% | ₹42.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹42.3 LAdmitted-Fee/PreQual/Technical/Finance DHAURAPALI RAJKISHORENAGAR KISHORENAGAR ANGUL ODISHA | ANUGUL | ODISHA | 759126 | +0.00% | ₹42.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹42.3 L
EMD Value
₹42,482
Closing Date
29 May 2026, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Sambalpur Irrigation Division, Sambalpur
Flood Protection to the left bank of Swagijharan Nallah near Shiva Temple at Sahebi Village of Naktideol Block for 2026-27.
2026_CEBBU_129508_1
SESID-03(03)/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
Naktideul
As per DTCN
2 documents required · 2 mandatory
₹6,000
₹42,482
Yes
17 Jun 2026
20 May 2026
30 May 2026
20 May 2026
29 May 2026
20 May 2026
20 May 2026 - 26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing land in canal slope work including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thick. complete as directed by the Engineer-in-charge. | - | Cum | 11.5 | - |
| - | Earth work in excavation of foundation in all kinds of soil including hard moorum,stoney earth mixed with boulder (except sheet rock and boulder required blasting)with all lead ,lifts and delifts including dressing and levelling the bed & slope & depositing the excavated materials at places away from the work site with all leads,lifts and delifts including cost of all labour & dewatering if required and T&P required for the work etc. complete as directed by the Engineer-in-charge. | 1 | Cum | 282.9 | ₹282.62 |
| - | Filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty etc. complete as per direction of the Engineer-in-Charge. | - | Cum | 652.6 | - |
| - | Rigid & smooth centering and shuttering for PCC work including false work and dismantling them after casting including all cost of material and labour Plinth and foundation etc. complete as directed by the Engineer-in-charge. and T & P etc.Complete as directed by the Engineer-in-charge. | 1 | Cum | 250.2 | ₹249.95 |
| - | Cement concrete (1:3:6) with 40mm down graded hard granite metal of approved quality mixing by concrete mixture and placing manually,compacting with vibrator including cost of all materials,labour charges with all lead by mechanical means and placement within initial leads of 50m and initial lift of 1.50m for mixing concrete including conveyance, royalty & taxes etc. of all materials, T&P, watering & curing, B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | 1 | Cum | 5,915.4 | ₹5,909.48 |
| - | Providing formwork for Concrete with F1 finish for upstream faces of dam,spillway ,glacis of barrages,unexposed surfaces of foundation .block joints etc.with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour,materials and T & P etc.Complete as directed by the Engineer-in-charge. | - | Sqm | 776.7 | - |
| - | Supplying, fitting and placing un-coated M.S bar reinforcement complete as per drawing and technical specification etc. complete as directed by the Engineer-in-charge. | - | Qtl | 9,546.2 | - |
| - | Reinforced Cement concrete M-20 grade with CBHG coarse aggregate 20mm down graded metal of approved quality mixing by concrete mixture and placing manually,compacting with vibrator including cost of all materials,labour charges with all lead by mechanical means and placement within initial leads of 50m and initial lift of 1.50m for mixing concrete including conveyance, royalty & taxes etc. of all materials, T&P, watering & curing, B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | 1 | Cum | 6,109.5 | ₹6,103.39 |
| - | Providing weep holes in plain concrete abutment,wing wall with 100mm dia AC pipes extending through full width of the structures with slope of 1(V) : 20(H) toward drawing face with B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | - | Rmt | 108.7 | - |
| - | Filling in foundation and plinth with excavated earth including watering and ramming etc. complete as directed by the Engineer-in-charge. | 1 | Cum | 157.2 | ₹157.04 |
stage.html
html • 0.09 MB
finance_591946.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_591946.xls
BOQ • 0.26 MB
BID_03.pdf
Tender Documents • 5.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .