| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹7.6 CrAccepted-AOC H NO 46 BANK COLONY BHUNA ROAD TOHANA TEHSIL DISTT FATEHBAD HARAYANA | HISAR | HARYANA | 125047 | ₹7.6 Cr | 1st | Accepted-AOC ok |
| 2 | 2nd₹8.1 Cr+₹49.4 L (6.49%)Rejected-Finance | ₹8.1 Cr+₹49.4 L (6.49%) | 2nd | Rejected-Finance 2nd Lowest |
| 3 | Rejected-Technical BALBEHRA VILLAGE BALBEHRA TEHSIL GUHLA KAITHAL 132027 | 132027 | - | - | Rejected-Technical Not as per DNIT |
Tender Value
₹6.2 Cr
EMD Value
₹12.5 L
Closing Date
25 Feb 2021, 5:00 pmClosed
Executive Engineer
Provl Divn Narwana
SPECIAL REPAIR BY PROVIDING WIDENING AND STRENGTHENING ON ALEWA TO RAJOUND ROAD FROM RD 0.00 TO 9.80 (MDR-113) IN JIND DISTT. (6636)
2021_HRY_158336_1
Alewa to Rajound
Open Tender
Civil Works - Roads
Item-rate/Agreement basic
270 days
Narwana
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹12.5 L
Yes
12 Apr 2021
2 Feb 2021
26 Feb 2021
2 Feb 2021
25 Feb 2021
2 Feb 2021
2 Feb 2021 - 2 Feb 2021
Amount
Milling of distress bituminous layer upto 75/70mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No. 49.
Dismantling Cement concrete plain 1:2:4 mix (HSR 8.6(d) and disposal of waste material with all lead and lift as desired by Engineer in Charge.
Dismantling Concrete (a) lime concrete, cement concrete of 1:6:12 or leaner mix (HSR 8.6 a) nd disposal of waste material with all lead and lift as desired by Engineer in Charge.
Dismantling of road including, soiling and wearing coat, screening, GSB, brick soiling etc. complete upto top of existing sub grade level and stacking of old serviceable material, complete in all respect. (NS) Note: Dismantling upto top of sub grade (av depth 150 mm).
Earth work in excavation in ordinary soil exclusive of compensation of earth. Kassi work undressed involving an average horizontal throw upto 2 meters, and an average vertical lift upto 0.5 meter including breaking of clods. (HSR 6.2 a) Note:)- Excavated earth may be reused on berms only after the approval of Engineer-in-Charge.
Preparation of sub grade including trenching, rough dressing of soil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1) Note: - In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work.
Providing and laying 100 mm thick granular sub base consisting of filter layer confirming to Table 400.1 Grading - VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying 100 mm thick granular sub base consisting of drainage layer confirming to Table 400.1 Grading –III of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing & laying 75 mm thick (Compacted) stone metal (G-I) 63 to 45mm gauge wearing coat to Water Bound Macadam in layer of 75mm each using screening type 'B' compacting with 3 wheeled steel roller/vibratory roller to achieve the desired density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications of road & bridges (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respect. (N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing & laying 75 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying 100 mm thick spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.406. (N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and applying primer coat with bitumen emulsion (S.S grade-I) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.502. (N.S.)
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing & laying 50 mm DBM using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary checks and evaluation, adding fresh material including rejuvenation as required, grade, level and thickness, all as specified in clause 519. (5th revision) 2013 using bitumen VG-30 (minimum Bitumen's 4.50% i/c bitumen of retrieved material as per job mix formula ) using 100-120 TPH batch type hot mix plant with appropriate arrangement for use of R.A.P, with pneumatic tyred roller (PTR) of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa and tandem rollers to achieve the desired compaction as specified in clause 519 of MORT&H specification 5th revision-2013. Note: - 1). The milled material to be used in DBM shall be minimum 80% of the theoretical quantity. 2). If bitumen required more than 4.50% as per job mix formula no extra payment will be paid extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. 3). Where there is DBM on existing black top , cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing & Laying 30 mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and with pneumatic tyred roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPA and tandem rollers to achieve the desired compaction as per clause No. 507 MoRT&H specification (5th Revision) 2013 for road and bridge works (5th Revision)2013 using minimum 5.4% to bitumen grade VG-30 as binder content by weight of total mix, complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note:- Before carrying out bituminous work, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and laying 80mm thick ISI marked interlocking paver blocks confirming to IS: 15658:2006/IRC SP 63-2004 of all shapes and colours in design mix cement M-40 over a bed of 30 mm thick fine sand complete in all respects. [HSR 10.159]
Construction of embankment, shoulders and sub grade in widening of formation width 7.32 mtr to 9.75 mtr with soil of minimum CBR 8 % (4 days soaked) of obtained from borrow area with any lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The finished road surface will be as per X-section approved by engineer with respect to GTS. In case the quantity of earth work calculated with NSL and finished level found to be less than 6266.95 cum. Then actual quantity (less than 6266.95 cum) will be paid. In case quantity worked out is more than 6266.95 cum, then only 6266.95 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached section-5 of DNIT. Note: If soil of CBR 8% is not available then the agency will do appropriate stabilization as per IRC –SP-89-2010 as approved by SE-in-Charge and nothing extra shall be paid on this account and it will be incidental to work. No earth work will be allowed from PWD land.
Earth work in excavation in foundations, trenches, etc., in all of soils, not kinds exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Cement concrete 1:8:16 with brick ballast 40 mm nominal size in foundation & plinth.(HSR 10.26)
Cement concrete 1:6:12 with stone agg. In foundation and plinth (HSR 10.32)
C.C. 1:8:16 with stone aggregate 40mm nominal size in foundation and plinth (HSR.10.28)
Cement Concrete 1:4:8 with stone aggregate 40mm nominal size in foundation and plinth(HSR 10.39)
Cement Concrete 1:2:4 with stone aggregate 20mm nominal size in foundation and plinth (HSR 10.41)
Cement Concrete 1:2:4 with stone aggregate 20mm nominal size in first storey upto 4 meters above plinth level. (HSR 10.59)
Cement Concrete 1:1½:3 with stone aggregate 20mm nominal size in first storey upto 4 meters above plinth level. (HSR 10.60)
Cement concrete 1:1-1/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centring and shuttering, laid in position complete in all respects (HSR 10.82+10.95a)
First class brick laid in cement sand mortar 1:4 in foundation and plinth.(HSR 11.4)
First class brick laid in cement sand mortar 1:3 in foundation and plinth. (HSR 11.5)
First Class brick work laid in Cement sand Mortar 1 : 3(one is to three) in first storey upto 4 metre above plinth level (HSR 11.10)
Extra for making tapered surface of brick masonry (HSR 11.99)
Brick on edge flooring laid in cement sand mortor 1:4 on 75mm thick CC 1:8:16 (HSR 14.23)
12 mm thick cement plaster 1:4 (HSR 15.5)
Cement Pointing 1:2 deep variety on brick & tile work(15.60)
Steel reinforcement TMT bars FE-500 EQR/FE-500 D grade more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights/depths/storeys/basements etc. Note:- Reinforcement shall be measured in length including heoks, if any separately for different in diameters as actually used in work, excluding overlaps, wastage, overlaps, Couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other method for binding and placing shall not be measured and cost of these items shall be deemade to be included in the rates for reinforcement. (HSR 18.22)
Provdg. & Fixing premoulded bituminous joint fillar for expansion joints, including the cost of sealing Compound and preimer coat (HSR 24.35 (ii)).
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked , antitermite as required at site , into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches , if required , Jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and with end dowels filled with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No 29.38,29.44,29.45 & 29.46) including cartage , loading and unloading complete in all respects. Note:- Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
Providing & laying Reinforced Cement concrete 1:2:4 5th kilometer stone of standard design as per fixed in position including finishing and painting and writing etc (HSR 10.129(i))+16.75 b (i))
Reinforced cement concrete 1:2:4 Kilometre stone of standard design, fixed in position, including finishing but including painting.(10.129 (ii) +16.75( b (ii))Ordinary KM stone
Reinforced cement concrete 1:2:4 200 mtr. stone of standard design, fixed in position, including finishing and painting. (NS)
Providing and fixing RCC village Boards 1.85x0.90x0.075mtr with CC 1:1½:3 including cost of steel and 6mm thick CM plaster 1:4, loading and un-loading carriage at site of work, fixing of site in CC 1:4:8 and painting sign board with synthetic enamel paint two coat complete in all respect as per drawing and design. (NS)
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical double shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the double shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M)
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflectorzing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads .the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note:- Before start of work the contractor shall give brand , batch no. , manufacturing date of the material to be used and get approved the same from Engineer-In-Charge before use.
Providing & erecting Cantilever board supported by M. S. Pipe Structure complete as per drawings, Technical Specifications and as directed by Engineer-In-Charge including construction of R. C. C. foundation for providing of M. S Tubular structure for Cantilever signage at given site as per drawing enclosed. The C. C. mix to be in ratio of 1:1½:3 (RCC 1:1½:3) and that of lean to be ratio of 1:3:6 the work will be carried out as per the instructions of Engineer-In-Charge. Note: Foundation including reinforcement etc. as per Drawing. Cantilever board . frame/truss Size- 3.05 m x 1.525 m
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Providing & fixing retro reflective hazard marker confirming to IRC79: 1981 of size 900 x 300 mm with back support of M. S. angle 25 x 25 x 3 mm and post of 50 x 50 x 5 mm, 1500 mm high embedded into 0.3 x 0.3 x 0.3 m M20 grade concrete as per site requirements, using non-metallic micro-prismatic retro reflective sheet confirming to IRC: 67-2012 type IV specification fixed on 3 mm thick aluminium composite. Material sheet as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides.
Providing and fixing of shoulder mounted Shevron boards of 600x450 mm rectangular using non metallic micro prismatirc retro reflective sheet conforming to IRC:6 7 -2012 type lV HIP specification fixed on 3 mm thick Aluminium Composit Peanel having 0 .5m m thick Aluminium on both sides supported on Mild Steel Pipe leg post 80mm N B, 1 .6mm thick duly painted in alternative color of black and white embeded M-20 Grade concret foundation of size 450 mmx 450m mx 600mm , complete as per drawing Technical Specification and as directed by Engineer-in-Charge
Providing & fixing road side delineator of height 1200 mm made of M. S. tube size 100 x 80 mm having thickness 1.2mm of height 900 mm and balance 300 mm of M. S. angle 25 x 25 x 3 mm. Having micro prismatic retro-reflective panel conforming to IRC : 67-2012 type 4 HIP and of size 80mm x 150mm on both sides as per clause No. 800 of MORT&H. Complete delineator processed by heat treatment process to makes it resistant to all weather effects fixed in C.C. 1:2:4 block size of 300 x 300 x 450 mm as clause No. 806 of MORT&H specification 5th revision 2013.
Reinforced Cement Concrete 1:2:4 studs of standard design, fixed in position, i/c finishing with exterior paint & primer coat & one 100mm wide retro reflective prismatic band consisting of 3mm ACP having high intensity micro prismatic sheeting confirming to IRC: 67:2012 on it duly fixed with 5 numbers 2” long screws with roller plug complete in all respect as per drawing in Section-5.
Recovery Items:- The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under:- (i) Bituminous Material @ Rs. -1448- Per cum
(ii) WBM @ Rs. -790.23/- Per cum Note:- All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if martial after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser that reserve price
E5 Infrastructure Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .