Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹11.4 LAccepted-AOC | Ist | Accepted-AOC L-1 Bidder | |
| 2 | IInd₹14.5 LRejected-Finance | IInd | Rejected-Finance L-2 Bidder | |
| 3 | IIIrd₹14.9 LRejected-Finance | IIIrd | Rejected-Finance L-3 Bidder | |
| 4 | Rejected-Technical 00 HAIDARPUR JAMALPUR ROAD SADAR JAUNPUR UTTAR PRADESH 222001 | JAUNPUR | UTTAR PRADESH | 222001 | - | Rejected-Technical Tender Documents, Terms and Condition Not uploaded |
Tender Value
₹15.6 L
EMD Value
₹16,000
Closing Date
1 Jul 2019, 12:00 pmClosed
SE, ETC, Varanasi
Bhikharipur, DLW, Varanasi
Construction of retaining wall
2019_UPTCL_357829_1
Short Term E-tender no. 30/2019-20/ETC/VNS
Open Tender
Electrical Works
Item Wise
90 days
132 KV Gajokhar-Manduadih line
Fee/EMD/PAN/GST Registration and work Exeperince
2 documents required · 2 mandatory
₹1,888
SE, ETC, Varanasi
₹16,000
21 Nov 2020
25 Jun 2019
1 Jul 2019
25 Jun 2019
1 Jul 2019
26 Jun 2019
Amount
Revetment of foundation of tower location No.62 (A+0) of 132 kV Gajokhar Manduadih S/C Line Under ETD-1,Varanasi.The job includes the following works:-
Cost of Excavation of foundation wall including all earth work, backfilling and leveling.
Cost of concreting for piling under CC pad of every leg of tower including cost of cement ,shuttering ,forming etc. including cost of reinforcement bar with 1:2:4 concrete.
Cost of concreting for CC Pad in bed of tower including cost of cement ,shuttering ,forming etc. including cost of reinforcement bar binding with 1:2:4 concrete.
Cost of concreting for Column (One on every corner of wall and one Middle of wall) including cost of cement ,shuttering ,forming etc. including cost of reinforcement bar binding with 1:2:4 concrete.
Cost of concreting for CC Pad in middle of wall including cost of cement ,shuttering ,forming etc. including cost of reinforcement bar binding with 1:2:4 concrete.
Concrete with 40mm alone ballast ,coarse sand and cement mortar in ratio 1:4:8 in foundation under floor including the cost of all material labour and T&P etc. required for proper completion of work satisfactorily.
Cost of concreting for CC top cover on retaining wall of tower including cost of cement etc. with 1:2:4 concrete.
Installation of steel reinforcement bars in R.C.C foundation of CC Pad/Piling/Piller/CC Middle Pad, including cost of steel cutting, placing etc.
1st class brick work for the construction of retaining wall in 1:4 ratio cement, mortar in ratio 1:2:4 including the cost of all material, labour and T&P etc. required for proper completion of work satisfactorily.
Earth filling under floor and in area between tower foundation and retaining wall including the cost of of soil to obtained by the contractor from out side including watering ,ramming and dressing of earth etc. complete including the cost of earth , royalty, taxes etc. and cost of material ,labour and T&P required for proper completion of work satisfactorily.
12mm plaster work on the wall cement and sand in ratio 1:4 including the cost of material, labour and T&P etc .required for proper completion of work satisfactorily
1st class brick on the edge floor laid including preparation of base to proper slope including supply of all material, labour and T&P etc. required for proper completion of work satisfactorily.
Making weep holes providing plastic pipe of length 30mtr(cost including the cost of plastic pipe including cutting in accordance size and fitting them in two layers at the span of 2.0mtr at depth of 0.5mtr, 1.25mtr and 2.0mtr respectively from the top of the revetment wall)
J P S EMPORIUM
M/s Shree Dev Infra Power limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .