Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹18 L (12.0%)Admitted-Finance | ₹1.7 Cr+₹18 L (12.0%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARJEET SINGH L2 | HYDRAULIC ENGINEERING COMPANY L1 |
|---|---|---|---|---|---|
| 1.00Men Power required for operation ,watch & ward of Maintenance:- Ist stage -Raw water | |||||
| 1.01 | Pump operators (2 No. x 365) | 2,190 | Per Day | - | - |
| 1.02 | Chowkidar (365 x 3) | 1,095 | Per Day | - | - |
| 1.03 | Electrician-II for One No. | 360 | Per Day | - | - |
| 2.002nd stage- Clear Water/ WSS Khadeen | |||||
| 2.01 | Pump operators (2 No. x 365) | 2,190 | Per Day | - | - |
| 2.02 | Chowkidar (365 x 3) | 1,095 | Per Day | - | - |
| 3.00Sector-5 Pump House | |||||
| 3.01 | Pump operators (2 No. x 365) | 2,190 | Per Day | - | - |
| 3.02 | Electrician -II | 90 | Per Day | - | - |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
20 Jan 2022, 4:00 pmClosed
Executive Engineer
Himuda Division Parwanoo
Running, Repair, Maintenance of Operation of Water Supply Scheme 1st and 2nd Stage at Parwanoo Kamli, SectorV , Uchha Parwanoo, Sector VI District Solan HP for 3 years from date of commencement Outsourcing thereof
2021_HIMUD_55152_1
PD/CB/Tender Notice/4116-35/2
Open Tender
Miscellaneous Works
Item Rate
1095 days
Parwanoo
Please refer tender documents
8 documents required · 8 mandatory
₹5,900
Executive Engineer
₹2.1 L
14 Feb 2022
1 Jan 2022
21 Jan 2022
1 Jan 2022
20 Jan 2022
1 Jan 2022
Amount
Men Power required for operation ,watch & ward of Maintenance:- Ist stage -Raw water
Pump operators (2 No. x 365)
Chowkidar (365 x 3)
Electrician-II for One No.
2nd stage- Clear Water/ WSS Khadeen
Pump operators (2 No. x 365)
Chowkidar (365 x 3)
Sector-5 Pump House
Pump operators (2 No. x 365)
Electrician -II
Sector-6 Uchha Parwanoo
Pump operators (2 No. x 365)
Electrician -II
Repair and maintennce of Pumpping machinery ie Rewinding of Motors repairs of pumps ,Starters Pawners ,MCCB & other fixtures & applincesIst stage Raw Water .
40HP pump & Motors = 4 Sets x 2 = 8 sets ( for 3 years)
2nd stage raw Water 180HP Pump & Motors= 4 Sets x 2 = 8 sets ( for 3 years)
Ucha Parwanoo ( sec.- 6 ) (i) 40H.P. Pump & Motors = 2 Sets Sector-5 , Parwanoo (i) 40HP / 30 H.P. Pump & Motors = 2 Sets 4 sets x 2= 8 sets ( for 3 years)
For Repair of Rising Main from intake of Khad to Ucha Parwanoo i. e. Sector- 5 Pump House to Sector - 4 Over Head water Storage tank .for Three Years.
Providing manpower for repair of distribution system in parwanoo Township in all Sectors.
Material Add for Bleaching powder for Three years
Material Add for Alum for Three Years.
Mechanical cleaning and disinfection of over and underground storage water tank of various HIMUDA Water Supply Scheme Parwanoo Distt. Solan i.e. Entire carriage of material upto all lead and lift and as per the direction of Engineer-in-charge once in every year. 1. Mechanical dewatering of storage tank.2. Removal of sludge. 3. High Pressure cleaning.4. Vaccum cleaning.5. UV Radiation of tank.
HARJEET SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.42 MB
Tendernotice_2.pdf
PDF • 0.19 MB
Tendernotice_3.pdf
PDF • 1.25 MB
Tendernotice_4.pdf
PDF • 0.13 MB
BOQ_82691.xls
BOQ • 0.23 MB
termsandconditionwtrsupply.pdf
Additional Documents • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .