Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
18 May 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MANGESH DEOKATE
Retail Ops. Northern Region, Bharat Petroleum Corporation Limited
Please read scope of work all work details provided Please follow terms and condition as specified
11709
1000403576
Limited Tender
Works
Retail Ops. Northern Region
₹6,000
20 May 2023
8 May 2023
18 May 2023
8 May 2023
18 May 2023
8 May 2023
8 May 2023 - 10 May 2023
Special Terms and Conditions
Conditions to be followed at Jobner Installation:
1. All the required materials shall be provided by the vendor along with all the
test certificates of the materials submitted.
2. Transportation of machinery and manpower is in Vendor's scope.
3. The job will be undertaken in partly basis as advised by Location In charge.
4. Vendor should consider the cost of transportation before submitting the quote.
5. Payment will be made on the completion of the job.
6. The Employees entering depot premises will be entirely vendor's responsibility.
SCOPE OF WORK AND TECHNICAL SPECIFICATION
The brief scope of work shall be carrying out necessary civil work for construction of Road on
both sides of culvert
DETAILS OF THE WORK
(1) Excavation as and where required
(2) Surface cleaning and laying WBM and spreading and compacting.
(3) Laying DWAY BITU PREMIX CARPET 50TK.
(4) Laying DWAY BITU SEAL COAT 12TK
(5) Laying paver blocks and making slope on both sides by using brick masonaory
OTHER TERMS AND CONDITIONS:
(1) The necessary tools tackles, labour etc required for carrying out this job shall be borne by the
vender at his cost & risk .No additional payment will be made for the same.
(2) The vender is responsible for any damage caused while carrying out earth pit jobs.
(3) Vendor shall provide Personal Protective Equipment(s) and insulated tools to his personnel for
carrying out installation of new earth pits.
1. CHECKING AND SUPERVISION OF THE WORK:
a. Erection and commissioning works executed by the contractor shall be
checked and supervised at the site by the concerned Engineer I/C and higher
authorities of the BPCL as and when required.
b. The vendor shall complete the job within a month after LOI.
c. Any other allied job required if asked by the Engineering I/C to be done by
the vendor & In case of any query you may contact Engineering I/C.
ANNEXURE -3 JOBNER INSTALLATION/ENGG TENDER 2022-23/2 1|5
Other conditions:-
1. The rates to be quoted should be including packing, forwarding, freight charges and
2. Rate has to be quoted excluding taxes. Taxes will be paid as applicable on above the quoted
rates as per govt norms.
3. The delivery is to be done within 30 days of the issue of LOI to the successful bidder.
4. Tenderer shall read and understood all term and condition of contract and execute tender
job as per condition of contract only.
5. The bidders are advised to visit the site before quoting the bid. They shall ascertain all the
available data for completion of entire job such as:-
Safety requirements:-
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor,
so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both to himself and his fellow employees.
c) Under no circumstances shall an employee hurry or take unnecessary chance when working
under hazardous conditions.
d) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire
prone areas and adequate firefighting equipment shall be provided at crucial locations.
e) Employees under the influence of any intoxicating beverage, even to the slightest degree shall
not be permitted to remain at work.
f) There shall be a suitable arrangement at every work site for rendering prompt and sufficient
first aid to the injured.
g) The staircases and passageways, shall be adequately lighted.
h) The employees when working around moving machinery, must not be permitted to wear loose
garments. Safety shoes are recommended when working in shops or places where materials or
tools are likely to fall.
Only experienced workers shall be permitted to go behind guard rails or to clean around energized
or moving equipment.
i) The employees must use the standard protection equipment intended for each job. Each piece of
equipment shall be inspected before and after it is used.
ANNEXURE -3 JOBNER INSTALLATION/ENGG TENDER 2022-23/2 2|5
j) Requirements of ventilation in underwater working to licensed and experienced divers, use of
gum boots for working in slushy or in inundated conditions are essential requirements to be
The Contractor shall follow and comply with all electrical and Industrial Safety Rules, relevant
provisions of applicable laws pertaining to the safety of workmen, employees plant and equipment
as may be prescribed from time to time without any demur, protest or contest or reservation. In
case of any in conformity between statutory requirement and Safety rules referred above, the later
shall be binding on the Contractor unless the statutory provisions are more stringent.
If the Contractor does not take all safely precautions and/or fails to comply with the Safety Rules
as prescribed by Consortium or under the applicable law for the safety of the equipment and plant
and for the safety to personnel and the Contractor does not prevent hazardous conditions which
cause injury to his own employees or employees of other contractors, or BPCL‟s employees or
any other person who are at Site or adjacent thereto, the Contractor shall be responsible for
payment of compensation as decided by the Workmen’s Compensation authority.
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act.
The compensation payable to the workmen/employees under the relevant provisions of the
Workmen’s Compensation Act and rules framed there under or any other applicable laws as
applicable from time to time. In case the BPCL is made to pay such Compensation, then the
Contractor is liable to reimburse the
BPCL such amount
If the Contractor observes all the Safety Rules and Codes, Statutory Laws, rules and quantity of
work completed in scheduled time during the currency of Contract awarded by the BPCL and no
accident occurs then BPCL may consider the performance of the Contractor satisfactory.
I/we have read carefully the above terms and conditions of the tender and agree to abide by
Signature of the Contractor/authorized representative
Name/Seal of the Contractor
ANNEXURE -3 JOBNER INSTALLATION/ENGG TENDER 2022-23/2 3|5
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
11709.pdf
pdf • 0.09 MB
BUDGETDOC_11709.pdf
pdf • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .