Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L1₹1.2 CrAdmitted-Finance 33 73 LATAKUNJ AJMER ROAD BALUGANJ AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | L1 | Admitted-Finance | ||
| 3 | L1₹1.2 CrAdmitted-Finance PLOT NO 91 ELLORA ENCLAVE DAYALBAGH AGRA | AGRA | UTTAR PRADESH | 282001 | L1 | Admitted-Finance | ||
| 4 | L1₹1.2 CrAdmitted-Finance 18 SHEKHAR ENCLAVE PASCHIM PURI SIKANDRA AGRA | AGRA | AGRA | L1 | Admitted-Finance | ||
| 5 | L2₹1.2 Cr+₹6.9 L (5.88%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹1.4 Cr
EMD Value
₹8.9 L
Closing Date
30 Sept 2026, 12:00 pmClosed
SE Mainpuri Circle PWD,Mainpuri
SE Mainpuri Circle PWD,Mainpuri
New Construction work at Mohammadabad Head to Village Niwazpur Road on Mohammadabad Minor.
2026_CEAGR_1189332_5
3685/07-MNP CIRCLE/2026-27 DATE 25-08-2026
Open Tender
Civil Works - Roads
Lump-sum
300 days
FIROZABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.9 L
Yes
SE Office Mainpuri Circle PWD,Mainpuri
5 Oct 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with approved material obtained from borrow pits with all lifts up to 1.5m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1, 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5. | 3,900 | Cum. | 108 | ₹4,21,200 |
| 2 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 7,700 | Cum. | 97 | ₹7,46,900 |
| 3 | Cement Treated Sub Base Providing, laying and spreading Material on a prepared sub grade, adding cement (OPC) @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub- base. | 1,060 | Cum. | 3,375 | ₹35,77,500 |
| 4 | Cement Treated Base Providing, laying and spreading Material on a prepared sub grade, adding cement(OPC) @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. | 1,415 | Cum. | 3,700 | ₹52,35,500 |
| 5 | Providing and applying Tack coat with Bitumen (VG-10) using emulsion pressure distributor at the rate of 0.35 kg per sqm on the prepared non-bituminous surfaces cleaned with Hydraulic broom as per Technical Specification Clause 503. | 10,125 | Sqm. | 28 | ₹2,83,500 |
| 6 | Providing, laying and rolling of open-graded Premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. | 10,125 | Sqm. | 205 | ₹20,75,625 |
| 7 | Providing and laying Seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 | 10,125 | Sqm. | 75 | ₹7,59,375 |
| 8 | Dismantling of existing structures prestressed / reinforced cement concrete grade by mechanical means cement concrete grade M-20 & above. | 8 | Cum. | 1,060 | ₹8,480 |
| 9 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. | 33 | Cum. | 150 | ₹4,950 |
| 10 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. | 3 | Cum. | 5,650 | ₹16,950 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.25 MB
BOQ_2240779.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .