Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAccepted-AOC N A | NA | NA | 121004 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹27.9 L+₹1.1 L (3.92%)Rejected-Finance FLAT NO A 15 ARCHANA GREEN SOCIETY NIBM ROAD KONDHWA PUNE 411048 | PUNE | MAHARASHTRA | 411048 | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹31.7 L+₹4.9 L (18.0%)Rejected-Finance JAIN SADAN MAHAL ROAD SHIVPURI DISTT SHIVPURI MP | SHIVPURI | SHIVPURI | MADHYA PRADESH | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹36.2 L+₹9.3 L (34.6%)Rejected-Finance | L4 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | J P ASSOCIATES L1 | M/S Eknath agencies L2 | ANIL CONSTRUCTION CO. L3 | SAGAR ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work / stone masonry / block masonry built in built in cement mortar or cement lime mortar complete all as specified and as directed. | 80.5 | Cum | 280 ₹22,540 | 100 ₹8,050 Lowest | 165 ₹13,282.5 | 300 ₹24,150 |
| 2.00 | Removing demolished building materials etc obtain from item No 1 to a distance of 1km or above, beyond the lead included in the rates, including loading, unloading and stacking at the destination remove the all debris outside of MOD land complete all as specified and as directed. NOTE : 1 LOAD = 1 Cum | 85 | Per Load | 450 ₹38,250 | 350 ₹29,750 Lowest | 425 ₹36,125 | 800 ₹68,000 |
| 3.00 | Taking Down Old RCC Louvered Jalli/ Jaffery without harming the exisiting wall of Stone/ Block or Bricks masonry complete all as specified and as directed. | 50 | Sqm | 25 ₹1,250 | 5 ₹250 Lowest | 22 ₹1,100 | 25 ₹1,250 |
| 4.00 | M & L precast cement concrete Type B0 1:2:4 (12.5mm graded aggregate) louvres and jallies, 40 mm thick (measured solid), in cluding all mould- ings complete all as specified and as directed | 50 | Sqm | 1,050 ₹52,500 | 950 ₹47,500 | 875 ₹43,750 Lowest | 2,000 ₹1,00,000 |
| 5.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard dence soil complete all as specified and directed. | 100 | Cum | 360 ₹36,000 | 300 ₹30,000 Lowest | 380 ₹38,000 | 550 ₹55,000 |
| 6.00 | Removing excavated soil beyond 500m and upto total distance 1.5 km and depositing where directed at a level of n exc 1.5 m outside MOD land complete all as specified and as directed. | 60 | Cum | 250 ₹15,000 Lowest | 300 ₹18,000 | 475 ₹28,500 | 500 ₹30,000 |
| 7.00 | M&L PCC (1:4:8) type D-2 as mass concrete as in foundation, mass concrete work complete all as specified & as directed. | 40 | Cum | 2,600 ₹1,04,000 | 4,000 ₹1,60,000 | 1,975 ₹79,000 Lowest | 3,600 ₹1,44,000 |
| 8.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed. | 40 | Cum | 80 ₹3,200 Lowest | 300 ₹12,000 | 90 ₹3,600 | 300 ₹12,000 |
| 9.00 | M&L for reinforced cement concrete grade M 25 design mix in Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed. | 35 | Cum | 5,500 ₹1,92,500 Lowest | 6,000 ₹2,10,000 | 8,750 ₹3,06,250 | 7,200 ₹2,52,000 |
| 10.00 | M&L for reinforced cement concrete grade M 25 design mix in Columns, pillars, piers,
posts and struts complete all as specified and as directed. | 15 | Cum | 5,500 ₹82,500 Lowest | 6,000 ₹90,000 | 9,250 ₹1,38,750 | 7,200 ₹1,08,000 |
Tender Value
₹41.8 L
EMD Value
₹83,500
Closing Date
16 Mar 2026, 6:00 pmClosed
GE NORTH PUNE
Garrison Engineer North General Cariappa Marg Camp Pune - 411001
GE (N) P/TOKEN- 94 OF 2025-2026 ADDN/ALTN OF BOUNDARY WALL AT HOUSE NO-9 PARADE GROUND ROAD CAMP PUNE AND SPECIAL REPAIR TO WASHROOM AND FLOOR OF BLDG NO. 27 KAHUN ROAD UNDER AGE B/R (CENTRAL) OF GE (N) PUNE
2026_MES_754090_1
GE (N) P/TOKEN- 94 OF 2025-2026
Open Tender
Civil Works
Item Rate
240 days
GE NORTH PUNE
Refer tender documents.
8 documents required · 8 mandatory
₹500
GE NORTH PUNE
₹83,500
Yes
22 Jul 2026
24 Feb 2026
18 Mar 2026
24 Feb 2026
16 Mar 2026
10 Mar 2026
25 Feb 2026 - 2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work / stone masonry / block masonry built in built in cement mortar or cement lime mortar complete all as specified and as directed. | 80.5 | Cum | - | - |
| 2 | Removing demolished building materials etc obtain from item No 1 to a distance of 1km or above, beyond the lead included in the rates, including loading, unloading and stacking at the destination remove the all debris outside of MOD land complete all as specified and as directed. NOTE : 1 LOAD = 1 Cum | 85 | Per Load | - | - |
| 3 | Taking Down Old RCC Louvered Jalli/ Jaffery without harming the exisiting wall of Stone/ Block or Bricks masonry complete all as specified and as directed. | 50 | Sqm | - | - |
| 4 | M & L precast cement concrete Type B0 1:2:4 (12.5mm graded aggregate) louvres and jallies, 40 mm thick (measured solid), in cluding all mould- ings complete all as specified and as directed | 50 | Sqm | - | - |
| 5 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard dence soil complete all as specified and directed. | 100 | Cum | - | - |
| 6 | Removing excavated soil beyond 500m and upto total distance 1.5 km and depositing where directed at a level of n exc 1.5 m outside MOD land complete all as specified and as directed. | 60 | Cum | - | - |
| 7 | M&L PCC (1:4:8) type D-2 as mass concrete as in foundation, mass concrete work complete all as specified & as directed. | 40 | Cum | - | - |
| 8 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed. | 40 | Cum | - | - |
| 9 | M&L for reinforced cement concrete grade M 25 design mix in Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed. | 35 | Cum | - | - |
| 10 | M&L for reinforced cement concrete grade M 25 design mix in Columns, pillars, piers,
posts and struts complete all as specified and as directed. | 15 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
tenderdocuments94.pdf
Tender Documents • 1.55 MB
BOQ_844628.xls
BOQ • 10.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .