Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 LAccepted-Finance | 1 | Accepted-Finance L-1 | |
| 2 | 2₹3.0 L+₹27,342 (10.1%)Accepted-Finance | 2 | Accepted-Finance L-2 | |
| 3 | 3₹3.9 L+₹1.2 L (42.7%)Accepted-Finance | 3 | Accepted-Finance L-3 |
Tender Value
₹5.6 L
EMD Value
₹5,600
Closing Date
12 Apr 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2023_UPTCL_794515_1
VERY SHORT TERM E-TENDER NO. ETC-II/L/01/2023-24
Open Tender
Electrical Works
Item Rate
15 days
132 KV S/S TRIPULA RAIBARIELY
AS PER TENDER DOCUMNETS
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹5,600
14 Apr 2023
6 Apr 2023
13 Apr 2023
6 Apr 2023
12 Apr 2023
6 Apr 2023
Amount
Following works are to be carried out for the work of dismantling of old 63 MVA 132/33 KV T/F (ECE make) and installation, Erection & Commissioning of new 63 MVA 132/33 KV T/F in place of defective & removal 63 MVA 132/33 KV T/F at 132 KV S/S Tripula, Raibariely alongwith associated works including all cost of men, misc, consumable, T&P crane, 6/12KLPH capacity centrifuging M/C with operator etc. to complete the job satisfactorily as per direction of supervising Engineer.
Dismantling of 120 KV LAs alongwith supporting structure after opening of jumpers and disconnection of earthing (01 Job for each set of LA & ALP structure)
Opening of connection control cable and power cable of existing defective 63 MVA transformer at both end and C&R Panel cooling fans, marshaling box etc.
Dismantling and shifting of above old & defective RTCC Panel of 63 MVA T/F-I from relay room including necessary disconnection of control cable including identification of cables for necessary future connections and shifting the same at proper place/store
Complete safe dismantling of the accessories of 132/33 KV 63 MVA T/F(ECE make) including opening of jumpers, Removal of earthing, opening of cable connection, draining out of T/F oil up to required level in209 Ltr Capacity oil drums, removal of conservator tank, oil pipe lines, bushing cooling fans, marshaling Box, radiator after draining of radiator oil etc. and fixing of blanking plates on the radiator pipe lines, conservator tank, turrets etc. with proper stacking at storage place .Blanking plates including Bolts & Nuts shall be provided by the contractor.
Dragging Shifting of main tank of dismantled 132/33 KV 63 MVA T/F (ECE make) to storage place from the plinth including turning of tank if required.
Shifting of T/F tank upto 20 Meter distance.
Additional shifting of 130 Meter @ 5 MTR./JOB
Dragging and Shifting of main tank of new 63 MVA T/F to plinth from storage place/unloading point including turning of tank if required.
Shifting of T/F tank upto 20 Meter distance.
Additional shifting of 20 Meter @ 5 MTR./JOB
Complete erection of new 63 MVA T/F including ‘A’ frame header, radiators, conservator tank, Bushing, connecting pipe lines, cooling fans& Pumps, marshaling box. OTI, WTI, capillary pipes etc.
Safe carriage of 20 KL T/F oil tank from 220 KV S/S Amethi to 132 KV S/S Tripula including loading and unloading (distance appr. 90 KM)
Centrifuging/Dehydration of the complete T/F oil of new 63 MVA T/F by ultra-high vacuum oil filtration plant after connecting the centrifuging pipes with oil tanker to oil filtration plant including taking the BDV value of oil and megger value of the T/F periodically till the required value is achieved filling & topping up of the above prepared T/F oil in main tank, radiator conservator tank etc. and attending the oil leakages if any with all cost of centrifuging machine, CFM operator etc.
Earthing of main tank, marshaling box, drive mechanism, T/F neutral etc. of new 63 MVA T/F with the help of 50x6 mm/75x10 mm size M.S Flat to be provided by department, its jointing with already laid Earth mat/ Deltas at 2 Place and necessaries modification in existing supports for earthing of neutral bushing support for its earthing of neutral bushing support for its earthing work and re painting of earthing strips as per specification/ standard practice.
Delta Earthing rejuvanation of 63 MVA T/F HV/LV neutral bushing with fabrication of 03 Nos. 3 meter long Electrode of 40 mm dia MS Round Bar, by digging of Earth and connecting all the 03 Nos. Electrodes with 75 mm X10 mm size MS Flat and connecting with existing Earthmat and taking out riser by due cutting, bending, welding etc. as per technical specification. Above work also include painting of Earthing Strips with one coat of Red Oxide Primer and two coat Bus Green synthetic enamled paint (01 Job for each Delta Earthing).
Interconnection and termination of already laid control cable between C&R Panel and erected equipement of 63 MVA T/F (both HV & LV side) the work also include making necessary holes in gland plate of boxes where ever required cable gland of appro. Size, providing of ferrules for each core of cables and its termination with crimping type copper lugs
Erection of new 63 MVA T/F RTCC Panel including shifting from storage place to control Room.
Jumpering of HV bushing of new 63 MVA T/F with 132 KV side with the help ACSR’Panther” conductor with associated terminal connectors to connect with jack Bus as per requirement.
Jumpering of LV Bushing of new 63 MVA T/F with 33 KV side with the help of newly prepared twin ACSR’Panther/Moose’ Conductor.
Erection of 03 Nos. ALP structure and fitting with 120 KV LAs and counter meter with earthing of ALP and LAs.
Sampling and Conducting testing from NABL accredited Lab by arranging appropriate equipment in following testing. 1. BDV 2. PPM 3. DGA
Proper packing of HV/LV side & Neutral bushing of dismantled 63 MVA T/F including proper wrapping with polythene Sheet in wooden caret of new bushing of 63 MVA T/F.
Making space for storage of old T/F at open yard by proper shifting and stacking of tower parts and other equipements to designated place. Job shall include all cost of hydra / crane / labour / vehicle T&P etc. as required for makingup of space.
MANAS ELECTRICALS
HARE KRISHNA ENERGY PROJECTS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .