| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹740.5 CrAccepted-AOC | ₹740.5 Cr Quoted ₹777.9 Cr | 1 | Accepted-AOC Order was given to L-1 bidder on prices arrived after RA and negotiations |
| 2 | 2₹824.8 CrRejected-AOC 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹824.8 Cr | 2 | Rejected-AOC Being a L-2 bidder no order was given |
Tender Value
Refer Docs
EMD Value
₹5.7 Cr
Closing Date
26 Aug 2021, 4:00 pmClosed
Chief Engineer (TD and IT)
O/o Chief Engineer (TD and IT) Fifth Floor Dreamax Plaza Sahkaar Marg RVUN Jaipur
EPC Package for Supply and Installation of Flue Gas Desulphurisation System at KSTPS Kota
2021_RRVUN_224465_1
TN-07/2021-22
Open Tender
Miscellaneous Works
730 days
KSTPS Kota
As per NIT and Tender Document
5 documents required · 5 mandatory
₹26,550
RAJASTHAN RAJYA VIDYUT UTPADAN
₹5.7 Cr
Yes
Jaipur
17 Jun 2022
7 Jun 2021
27 Aug 2021
7 Jun 2021
26 Aug 2021
13 Jul 2021
8 Jun 2021 - 19 Jun 2021
23 Jun 2021
KOTA SUPER THERMAL POWER STATION (KSTPS) Unit#5 (1X210 MW), 6 & 7 (2X195 MW) KOTA
SCHEDULE NO. 1:- Plant and Equipment including Type Test Charges, Mandatory Spares and Transportation (PART-A of FIRST CONTRACT)
Main Equipment: Lumpsum Supply Prices of complete Plant & Equipment (Mechanical, Electrical and Control & Instrumentation items etc.) including Factory Fabricated Steel Structure for Flue Gas Desulphurisation System Package including Special Tools & Tackles and Type Test charges
FGD System
Limestone and Gypsum Handling System
Items related to Chimney
Any Other (Please Specify)
Lumpsum Supply Prices For MANDATORY SPARES (As specified in Annexure-1.5 of Vol-II, Section-1 of General Technical Specifications)
Lumpsum Charges towards Local Transportation and Inland Transit Insurance including Port Handling Charges, Port Clearances and other Port Charges/costs incidental to delivery of Plant & Equipment including Mandatory Spares to Power Plant site
FGD System
Limestone and Gypsum Handling System
Item related to Chimney
Mandatory Spares
Any Other (Please Specify)
SCHEDULE NO. 2:- Installation Services including SCE Insurance (other than transit insurance (PART-B of FIRST CONTRACT)
Lumpsum Prices towards Erection, Testing, Integration & Hooking Up of the FGD System, Commissioning and conducting PG test including, Handling & Storage at site in respect of all material supplied under PART-A of FIRST CONTRACT. Quoted prices include prices towards Storage cum Erection insurance (including PG Test & to cover period up to handing over of the plant) and Insurance towards Civil works and other services as specified in the bidding Documents excluding Inland Transit Insurance already covered under Schedule 1 above.
SCHEDULE NO. 3:- Civil, Structural & Architectural works (PART-C of FIRST CONTRACT)
Lumpsum Prices towards Civil & Architectural works portion (Including Construction material, Cement and Labour etc.) including Design & Engineering works related to construction works for all the required buildings, foundations and super-structures for the FGD System.
Lumpsum Prices towards Structural Steel works portion including cost of material, fabrication and erection including Design & Engineering works related to Structural Steel works for the FGD System.
Total of Schedule (Schedule 1 + Schedule 2 + Schedule 3) for KSTPS Kota Project