Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹70,000
EMD Value
₹2,100
Closing Date
28 Nov 2026, 3:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Construction Of Bathroom at tangpathri Marhama NLO Nazir ahmad khowja s/o Rehmatullah.
2026_RDPR_332000_4
NIT NO 147 OF 2026-27 GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹2,100
23 Nov 2026
23 Nov 2026
28 Nov 2026
23 Nov 2026
28 Nov 2026
23 Nov 2026
23 Nov 2026 - 23 Nov 2026
30 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 4.4 | Cum | 479.3 | ₹2,108.92 |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | 0.71 | Cum | 1,000 | ₹710 |
| 3 | P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:3:6 graded stone agg. 20mm nominal size | 0.56 | Cum | 5,673.4 | ₹3,177.1 |
| 4 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:1:5:3 coarse sand 20mm nominal size crushed stone agg.)using 20% plum | 0.24 | Cum | 7,275.25 | ₹1,746.06 |
| 5 | Centring and shuttering of kit ply including proping, strutting & removal of the same.foundation | 4.5 | Sqm | 286 | ₹1,287 |
| 6 | P/F 40mmx40mmx40mmx5mm angle iron frames and shutters of 35mmx35mmx4mm angle iron with CGI sheets | 1 | no | 3,000 | ₹3,000 |
| 7 | Reinforcement of RCC works including straightening, cutting, bending placing in position and binding all complete. ild steel and medium tensile steel bars | 23 | kg | 120 | ₹2,760 |
| 8 | 12mm Cement Plaster of mix 1:4(1 cement:4 fine sand)… | 8.7 | Sqm | 266.2 | ₹2,315.94 |
| 9 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank | 500 | Litre | 8.5 | ₹4,250 |
| 10 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 2.66 | Cum | 7,500 | ₹19,950 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_1127008.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .