Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹24.9 LAccepted-AOC 0 GHULAM MOHAMMAD AND CO 0 GURUDAWARA II RAWALPORA SRINAGAR JAMMU AND KASHMIR RAWALPORA SRINAGAR JAMMU KASHMIR 190001 | SRINAGAR | JAMMU AND KASHMIR | 190001 | L-1 | Accepted-AOC Lowest and Reasonable | |
| 2 | L-2₹28.2 L+₹2.2 L (8.53%)Rejected-Finance | L-2 | Rejected-Finance Other than Lowest | |
| 3 | L-3₹28.5 L+₹2.5 L (9.59%)Rejected-Finance | L-3 | Rejected-Finance Other than Lowest | |
| 4 | L-4₹28.5 L+₹2.5 L (9.70%)Rejected-Finance | L-4 | Rejected-Finance Other than Lowest | |
| 5 | L-5₹30.3 L+₹4.3 L (16.6%)Rejected-Finance | L-5 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | M/S SA INFRATECH L3 | M/S BASHIR AHMAD TANTARY L2 | M/S M.R. Construction L4 | M/S WANI AND SONS L7 | M/S ZAHOOR ENTERPRISES L5 | M/S GHULAM MOHAMMAD AND CO. L1 | M/S Abdul Ahad Rather L8 | M/S FAROOQ AND SONS L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| .10Schedule 'A' Part-I (B/R Work) | |||||||||||
| 1.00 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) n exc. 1.5 Sqm and credited to the contractor, complete all as specified and directed
Note: The damaged portion of the tiles / rendering shall be made good with the same material to match with the adjacent surface. | 72 | Each | 5 ₹360 Lowest | 10 ₹720 | 30 ₹2,160 | 50 ₹3,600 | 10 ₹720 | 50 ₹3,600 | 40 ₹2,880 | 50 ₹3,600 |
| 2.00 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) exc. 1.5 Sqm but n exc 4.0 Sqm and credited to the contractor, complete all as specified and directed
Note: The damaged portion of the tiles / rendering shall be made good with the same material to match with the adjacent surface. | 15 | Each | 5 ₹75 Lowest | 10 ₹150 | 30 ₹450 | 60 ₹900 | 10 ₹150 | 50 ₹750 | 50 ₹750 | 50 ₹750 |
| 3.00 | S&F pressed steel frame for doors with one rebates size of frame 125x60 mm including necessary fixing lungs hinges lock strike plate etc. including PCC, 1:3:6, type C-0 (using 12.5 mm graded crushed stone aggregate) as in back filling of pressed steel frame, complete all as specified and directed. | 50 | Running Metre | 350 ₹17,500 | 500 ₹25,000 | 500 ₹25,000 | 550 ₹27,500 | 430 ₹21,500 | 300 ₹15,000 Lowest | 400 ₹20,000 | 500 ₹25,000 |
| 4.00 | M&L for plain cement concrete, 1:2:4, type B-1 (using 20 mm graded crushed stone aggregate) in bed blocks for hold fast and as in roof kerb benching & similar work etc. complete all as specified and directed. | 1 | Cubic Metre | 2,000 ₹2,000 | 1,200 ₹1,200 Lowest | 4,000 ₹4,000 | 4,500 ₹4,500 | 4,000 ₹4,000 | 1,500 ₹1,500 | 2,500 ₹2,500 | 3,500 ₹3,500 |
| 5.00 | Preparation of new steel surface and iron surfaces of any description over 10cm width or girth and applying two coats of synthetic enamel paint over red oxide primer, complete all as specified and directed. | 30 | Square Metre | 20 ₹600 | 10 ₹300 Lowest | 27 ₹810 | 40 ₹1,200 | 29 ₹870 | 20 ₹600 | 48 ₹1,440 | 32 ₹960 |
| 6.00 | Preparation of old steel surface and iron surfaces of any description over 10cm width or girth and applying one coat of synthetic enamel paint , complete all as specified and directed. | 35 | Square Metre | 20 ₹700 | 10 ₹350 Lowest | 20 ₹700 | 35 ₹1,225 | 27 ₹945 | 20 ₹700 | 44 ₹1,540 | 30 ₹1,050 |
| 7.00 | S&F 35mm thick 2nd class hardwood, factory made, glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc. (without sash bars), edges of framing plain, chamfered or rounded. fitted with cut and mitred beads for securing glass, etc. sizes of members of shutters as specified in SSR Part I, Section 8, clause 8.24 (a), complete all as specified and directed. | 6 | Square Metre | 1,600 ₹9,600 | 1,600 ₹9,600 | 1,800 ₹10,800 | 1,800 ₹10,800 | 1,900 ₹11,400 | 1,200 ₹7,200 Lowest | 1,680 ₹10,080 | 1,200 ₹7,200 Lowest |
| 8.00 | S&F 35mm thick 2nd class hardwood plain framed, panelled shutter (two panel), factory made, with lock rail and panel of 9 mm B.W.P. commercial ply or 12 mm veneered particle board with commercial veneering on both faces. The size of rail and stile as per IS : 1003 (Part I), kiln seasoned and chemically pressure treated, complete all as specified and directed. | 12 | Square Metre | 1,800 ₹21,600 | 1,600 ₹19,200 | 2,000 ₹24,000 | 1,900 ₹22,800 | 1,800 ₹21,600 | 1,300 ₹15,600 | 1,900 ₹22,800 | 1,200 ₹14,400 Lowest |
| 9.00 | Preparation of new wood and wood based surfaces of any description exc 10cm with or girth and applying two coats of synthetic enamel paint over a coat of pink primer, complete all as specified and directed. | 25 | Square Metre | 20 ₹500 Lowest | 23 ₹575 | 30 ₹750 | 40 ₹1,000 | 29 ₹725 | 25 ₹625 | 66 ₹1,650 | 32 ₹800 |
Tender Value
₹43.6 L
EMD Value
₹87,200
Closing Date
26 Jul 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) Srinagar
Garrison Engineer (AF) Air Force Station Srinagar 190 007
ADDITION / ALTERATION TO CERTAIN OMQs UNDER GE (AF) SRINAGAR
2025_MES_718032_1
GE (AF)/SGR-35/2025-26
Open Tender
Civil Works
Item Rate
180 days
AOR of GE (AF) Srinagar
Please refer NIT and Tender Documents
9 documents required · 9 mandatory
₹500
GE (AF) Srinagar
₹87,200
Yes
7 Aug 2025
2 Jul 2025
28 Jul 2025
2 Jul 2025
26 Jul 2025
19 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .