Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹16.9 LAccepted-AOC | 1ST | Accepted-AOC successful | |
| 2 | Rejected-Technical AT PO KATAPALI BLOCK BARGARH DIST BARGARH PIN 768038 | BARGARH | BARGARH | ODISHA | 768038 | - | Rejected-Technical UNSUCCESSFUL | |
| 3 | Rejected-Technical | - | Rejected-Technical UNSUCCESSFUL | |
| 4 | Rejected-Technical | - | Rejected-Technical UNSUCCESSFUL | |
| 5 | Rejected-Technical | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹16.9 L
EMD Value
₹16,934
Closing Date
16 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commissioner, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Construction of Road and Drain from Laxmipuja Chowk to Ajay Vig Residence in WNo.04
2026_ORULB_126678_16
37/SMC_SBP/2025-26
Open Tender
Civil Works - Others
Percentage
90 days
Sambalpur Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,934
Yes
10 Jul 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. Complete | 149.65 | Cum | 276.9 | ₹41,438.09 |
| 2 | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | 16.62 | Cum | 826.11 | ₹13,729.95 |
| 3 | Cement Concrete (1:3:6) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | 87.75 | Sqm | 5,794.7 | ₹5,08,484.93 |
| 4 | Cement Concrete (1:2:4) using 12mm size B.H.G. (C. B.) Chips including cost, conveyance , royalty & taxes of all materials etc. complete | 9.48 | Cum | 7,443.5 | ₹70,564.38 |
| 5 | Rigid & smooth centering & shuttring for RCC works including false work & dismentling them after casting including cost of materials complete | 502.61 | Cum | 248.7 | ₹1,24,999.11 |
| 6 | Providing and laying 80 mm thick factory made cement concrete interlocking paver block of M.40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 663.82 | Sqm | 608.4 | ₹4,03,868.09 |
| 7 | R.C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete | 56.31 | Cum | 5,936.3 | ₹3,34,273.05 |
| 8 | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification | 22.52 | Qtl | 8,704.2 | ₹1,96,018.58 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_583926.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_583926.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .