Vikas Khand Shorathgarh ke bhadav chilhiya sampark marg se JK schoool tak interlocking karya
2026_REDUP_1155906_30
06/RED/Tender/File No/Bond Clerk/2026-27 Dt. 02.04.2026
Open Tender
Civil Works
180 days
WORKS
as per sbd
2 documents required · 2 mandatory
₹2,714
₹1.1 L
1 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
6 Jun 2026
1 Jun 2026
1 Jun 2026 - 6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Non thorny jungle) ( By Mechanical Means) P.W.D. S.I. No 259 | 1,980 | Sqm | 5.7 | ₹11,286 |
| 2 | E/W in excavation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/I upto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 (For GSB Trenches) | 6.9 | Sqm | 114 | ₹786.6 |
| 3 | Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 | 2,707 | Cum | 95.52 | ₹2,58,572.64 |
| 4 | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements | 445.5 | Cum | 96.59 | ₹43,030.85 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I) | 352.41 | Cum | 4,049.33 | ₹14,27,024.39 |
| 6 | Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412 | 295.31 | Sqm | 359.1 | ₹1,06,045.82 |
| 7 | S/F Inaugration black granite (Polished)20mm thick stone size 0.90x0.60 m including lettering, printing, border ect. Will be painted of superior quality is required shade and colour including excavation of foundation (1.50x0.50x0.90m),P.C.C. 1:4:8(1.50x0.50x0.12m), brick work 1:4 with cement fine sand in foundation (1.36x0.345x1.20m) ,12mm thick plaster 1:4 with cement fine sand and finishing walls with water profing white cement paint of approved make and quality such as super snowcem paint etc. all complete. | 1 | No | 8,550 | ₹8,550 |
| 8 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.
Ordinary Kilometer Stone (Precast) | 1 | No | 3,242.25 | ₹3,242.25 |
| 9 | Reinforced cement concrete M15 grade hectometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.
200 m Stone (Precast) | 5 | No | 801.83 | ₹4,009.15 |
| 10 | Providing & laying of Interlocking Concrete Block pavements having thickness 80 mm as per drawings and techinical Specification Clause 1504 (Laid over previously prepared subbase using 100mm thick GSB, excluding cost of GSB ) | 2,970 | Sqm | 861.65 | ₹25,59,100.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
Tendernotice_2.pdf
PDF • 9.43 MB
BOQ_2165567.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid