Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 CrAccepted-AOC JHARSUGUDA UNDER STATE PLAN | JHARSUGUDA | ODISHA | 768201 | ₹9.1 Cr | L1 | Accepted-AOC Selected as L1 bidder |
| 2 | L1₹9.1 CrRejected-AOC | ₹9.1 Cr | L1 | Rejected-AOC L1 bidder |
| 3 | L1₹9.1 CrRejected-AOC | ₹9.1 Cr | L1 | Rejected-AOC L1 bidder |
| 4 | L1₹9.1 CrRejected-AOC | ₹9.1 Cr | L1 | Rejected-AOC L1 bidder |
| 5 | L1₹9.1 CrRejected-AOC AT NUAMANTRI PO ATHAMALLIK DIST ANGUL 759125 | ATHAMALLIK | ANGUL | ODISHA | 759125 | ₹9.1 Cr | L1 | Rejected-AOC L1 bidder |
Tender Value
₹10.7 Cr
EMD Value
₹10.7 L
Closing Date
15 Sept 2025, 5:30 pmClosed
Chief Engineer, Roads-I, Odisha
O/o the E.I.C (Civil-Cum-Roads), Odisha, Nirman Soudha, New Building, Unit-V, Bhubaneswar.
Improvement of Chamunda to Burda via Kusamura and Badpal road from 0/000 km to 10/663 km ( except from 4/120 km to 4/420 km and from 7/000 km to 8/000 km) in the district of Sambalpur under State Plan
2025_EICCL_117481_7
CE-ROADS-I-11/2025-26
Open Tender
Civil Works - Roads
Percentage
300 days
Sambalpur-I Division
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹10.7 L
Yes
10 Jul 2026
30 Aug 2025
16 Sept 2025
30 Aug 2025
15 Sept 2025
30 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Unit - Sqm
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Sqm | 8.45 | - |
| 2 | Unit - Cum
Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 1 | Cum | 650.1 | ₹649.45 |
| 3Unit - Rmt. Removing of hume pipe including earthwork and dismantling of masonry works including T&P and scaffolding whenever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P etc complete in all respect and as per direction of the Engineer-in-charge. | |||||
| 3.01 | Upto 600mm dia | - | Rmt. | 291.52 | - |
| 4 | Unit - Cum
Earth work in excavation in all kinds of soil for road works & foundation of structures with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. | 1 | Cum | 74.79 | ₹74.72 |
| 5 | Unit - Sqm
Scarifying and removing the existing bituminous road surface to the required depth as per approved drawing and technical specifications and disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Sqm | 6.03 | - |
| 6 | Unit - Sqm
Reworking the scarified bituminous surface suitably after supplimenting the base materials with sand and compacting finished surface as per approved drawing and technical specification as per clause 501.8.8.1 & 501.8.3.2 of MORTH Specification for Road and Brifge works (5th revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Sqm | 28.09 | - |
| 7 | Unit - Cum
Loosening to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Cum | 36.04 | - |
| 8 | Unit-Cum
Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Cum | 35.83 | - |
| 9 | Unit-Cum
Construction of embankment with approved materials obtained from borrow pits by mechanical means graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1 | Cum | 203.79 | ₹203.59 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_550763.xls
BOQ • 1.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .