Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.1 LAdmitted-Fee/PreQual/Technical/Finance CHENNAI TAMIL NADU 600100 INDIA | CHENGALPATTU | TAMIL NADU | 600100 | -18.00% | ₹26.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹27.0 L+₹95,660.45 (3.67%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹27.0 L+₹95,660.45 (3.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹27.0 L+₹95,660.45 (3.67%)Admitted-Fee/PreQual/Technical/Finance NO 55 COMPLEX THIRU V KA INDUS INDUSTRIAL ESTATE EKATTUTHANGAL CHENNAI 600 032 | CHENNAI | TAMIL NADU | 600032 | -14.99% | ₹27.0 L+₹95,660.45 (3.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹27.0 L+₹95,660.45 (3.67%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹27.0 L+₹95,660.45 (3.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L3₹27.0 L+₹98,520.73 (3.78%)Admitted-Fee/PreQual/Technical/Finance | -14.90% | ₹27.0 L+₹98,520.73 (3.78%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹31.8 L
EMD Value
₹32,000
Closing Date
15 Sept 2026, 3:00 pmClosed
Zonal Officer IV
No.266, TH Road, Chennai - 21
Z.O.IV.C.No.B3/5506/2026 Construction of Additional Classrooms on the First Floor of CPS Building at Udhayasuriyan Nagar, Division-37, Zone-04
2026_CoC_699461_1
Z.O.IV.C.No.B3/5506/2026
Open Tender
Civil Works
Works
Zonal Office IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹32,000
16 Sept 2026
29 Aug 2026
15 Sept 2026
29 Aug 2026
15 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling - Pressed Tiles & Weathering Course | 144 | SQM | 49.2 | ₹7,084.8 |
| 2 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 5,940 | KGS | 98.7 | ₹5,86,278 |
| 3 | Supplying and erecting steel centering including n...be given after the concrete is laid) VERTICAL SLAB | 141 | SQM | 621.53 | ₹87,635.73 |
| 4 | Supplying and erecting steel centering including n...shall be given after the concrete is laid). COLUMN | 100 | SQM | 669.67 | ₹66,967 |
| 5 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).SLAB | 232 | SQM | 1,069.07 | ₹2,48,024.24 |
| 6 | Providing and laying in position, standardised con...the Department for the excess usage of materials). | 54 | CUM | 8,015.86 | ₹4,32,856.44 |
| 7 | Plastering the surface of walls with Cement Morta...directed by the departmental officers. (sump wall) | 145 | SQM | 653.04 | ₹94,690.8 |
| 8 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 358 | SQM | 317.59 | ₹1,13,697.22 |
| 9 | Terrace waterproofing a. Surface Preparation - Cle... SBR Latex or equivalent at 1 Liter/bag of cement | 144 | SQM | 1,155 | ₹1,66,320 |
| 10 | Providing and laying of first quality of Johnson (...white cement and matching pigments etc., complete. | 144 | CUM | 1,502 | ₹2,16,288 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
TenderDocuments.pdf
Tender Documents • 1.72 MB
BOQ_840844.xls
BOQ • 0.38 MB
1.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .