Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC SUGANTHAM BUILDING 24 8 5 PALLIYADI KANYAKUMARI DIST PIN 629 169 | PALLIYADI | KANYAKUMARI | TAMIL NADU | 629169 | ₹1.7 L | L1 | Accepted-AOC lowest value |
| Sl No | Description | Qty | Unit | M/s. Bafflin Groups L1 |
|---|---|---|---|---|
| 1.00 | Excavation for pole upto 8.00m length by using JCB/Manual | 5 | Each | 2,000 ₹2,360 |
| 2.00 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual | 5 | Each | 2,250 ₹2,655 |
| 3.00 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual | 1 | Each | 250 ₹295 |
| 4.00 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. | 1 | Set | 450 ₹531 |
| 5.00 | Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit | 1 | Each | 225 ₹265.50 |
| 6.00 | Fixing V cross arm 4.5 feet | 2 | Each | 450 ₹531 |
| 7.00 | Fixing of Aluminium Knob | 6 | Each | 300 ₹354 |
| 8.00 | Fixing of LT 3 phase cross arm | 6 | Each | 900 ₹1,062 |
| 9.00 | Fixing of single phase X arm | 1 | Each | 125 ₹147.50 |
| 10.00 | Erection of LT shackle | 22 | Each | 1,100 ₹1,298 |
Tender Value
Refer Docs
EMD Value
₹1,460
Closing Date
14 Feb 2026, 2:00 pmClosed
o/o the EE/D/Ngl
o/o the EE/D/Ngl
Improvement estimate for 1 NO 100 KVA DT for avoid overload in existing Therakalputhoor SS-II , 250 KVA under Thovalai section
2026_EB_649411_1
EE/D/NGL/ETW .42/dt.31.01.2026
Open Tender
Electrical Works
90 days
EE/NGL
As specified tender
3 documents required · 3 mandatory
₹0
₹1,460
Yes
25 Mar 2026
31 Jan 2026
16 Feb 2026
31 Jan 2026
14 Feb 2026
31 Jan 2026
31 Jan 2026 - 13 Feb 2026
Excavation for pole upto 8.00m length by using JCB/Manual
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
Fixing V cross arm 4.5 feet
Fixing of Aluminium Knob
Fixing of LT 3 phase cross arm
Fixing of single phase X arm
Erection of LT shackle
Fixing of HT / LT Ti fitting
Fixing of 11 KV DISC Insulator
Fixing of Tapping Channel X arm
Fixing of HT PIN insulator with Pin 11 kv
Making of slotted holes
Erection of single pole structure including erection of DT complete structure complete with centre support
Erection of single pole structure including erection of DT complete structure complete without centre support
Erection of Distribution Transformer structure complete as per TNEB standard including painting , feeder arrangement , colour washing of RCC poles etc..,
Dismantling of Distribution Transformer structure complete as per TNEB standard including painting , feeder arrangement , colour washing of RCC poles etc..,
Erection of Metering set
Loading or unloading of Metering set
Loading or unloading of upto 9 mt pole
Loading or unloading of DT upto 63 KVA
Loading or unloading of DT upto 250 KVA
Loading / Unloading of line materials
Loading or unloading of All REC, RCC pole above 8.00 m length
Transportation of all types and sizes of poles and other associated materials from road side to pole pit upto 2 KM
Transforting of Distribution Transformer/Line Material from stores to office/site
Tree clearance in HT or LT location for ordinary treeclerance and Throng bushes & trees.
Dismantling and re erection of conductor of 7/2.59 mm ACSR
Dismantling of conductor of 7/2.59 mm ACSR
Paving and stringing of conductor of 7/2.59mm ACSR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 1.53 MB
BOQ_778566.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid