| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹4.0 L (3.49%)Admitted-Finance | ₹1.2 Cr+₹4.0 L (3.49%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical N A | NA | NA | 121004 | - | - | Rejected-Technical Provided MSE not fulfil the proof of exemption of EMD |
| Sl No | Description | Qty | Unit | M/s Shri Krishan Construction Co. L2 | RAJESH ENGINEERING CONSULTANTS L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade including required key aggregate as specified, spreading coarse aggregate with the help of self propelled / tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy :For 50mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt 80/100 @ 50 kg/10 sqm. | 19,500 | SQUARE METER | 40,95,000 ₹48,32,100 Lowest | 61,42,500 ₹72,48,150 |
| 2.00 | PROVIDING AND LAYING SEAL COAT OF PREMIXED FINE AGGREGATE (PASSING 2.36 MM AND RETAINED ON 180 MICRON SIEVE) WITH BITUMIN USING 128 KG OF BITUMEN OF GRADE 80/100 BITUMEN PER CUM OF FINE AGGREGATE AND 0.60 CU.M OF FINE AGGREGATE PER 100 SQM OF ROAD SURFACE INCLUDING ROLLING AND FINISHING WITH ROAD ROLLER ALL COMPLETE. | 19,500 | SQUARE METER | 10,72,500 ₹12,65,550 Lowest | 14,04,000 ₹16,56,720 |
| 3.00 | Providing and applying tack coat using hot straight run bitumen of grade 80/ 100 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :On W.B.M. @ 0.75 Kg / sqm. | 19,500 | SQUARE METER | 5,85,000 ₹6,90,300 | 3,31,500 ₹3,91,170 Lowest |
| 4.00 | Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required bituminous portion | 2,150 | SQUARE METER | 27,95,000 ₹32,98,100 | 48,375 ₹57,104 Lowest |
| 5.00 | SCARIFYING METALLED ( WATER- BOUND) ROAD SURFACE INCLUDING DISPOSAL OF RUBBISH LEAD UPTO 50 M AND CONSOLIDATION OF THE AGGREGATE RECEIVED FROM SCARIFYING WITH POWER ROAD ROLLER OF 8 TO 10 TONNE CAPACITY. | 19,500 | SQUARE METER | 1,36,500 ₹1,61,070 Lowest | 8,77,500 ₹10,35,450 |
| 6.00 | Providing and applying 2.5mm thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour ,T& amp ;P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. | 1,000 | SQUARE METER | 7,00,000 ₹8,26,000 | 5,50,000 ₹6,49,000 Lowest |
| 7.00 | Carriage of Mining Muck Boulders from Outside of IBM Gate and Spreading, Filling voids by Earth/Moorum & Compaction by Road Roller in Bedding Building as per the direction of Engineer-In-Charge. | 770 | CUBIC METER | 2,69,500 ₹3,18,010 | 1,23,200 ₹1,45,376 Lowest |
| 8.00 | Carriage of material by mechanical transport including loading, unloading and stacking, Sand, Stone Aggregates below 40 MM nominal Size: Lead 1 KM. | 1,380 | CUBIC METER | 2,76,000 ₹3,25,680 | 1,17,300 ₹1,38,414 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
23 Mar 2023, 2:30 pmClosed
ABHISHEK PARREK
HCL/KCC
RFQ 10222 REPAIRING OF ROADS INSIDE PLANT AREA AND MAGZINE AREA AT KCC. (PHASE-II)
2023_HCL_147468_1
RFQ10222 Repair of Plant Roads
Open Tender
Civil Works - Roads
Fixed-rate
120 days
HCL/KCC
Enclosed in Annexure
6 documents required · 6 mandatory
₹0
₹1.7 L
Yes
6 May 2023
3 Mar 2023
24 Mar 2023
3 Mar 2023
23 Mar 2023
3 Mar 2023
3 Mar 2023 - 18 Mar 2023
Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade including required key aggregate as specified, spreading coarse aggregate with the help of self propelled / tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy :For 50mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt 80/100 @ 50 kg/10 sqm.
PROVIDING AND LAYING SEAL COAT OF PREMIXED FINE AGGREGATE (PASSING 2.36 MM AND RETAINED ON 180 MICRON SIEVE) WITH BITUMIN USING 128 KG OF BITUMEN OF GRADE 80/100 BITUMEN PER CUM OF FINE AGGREGATE AND 0.60 CU.M OF FINE AGGREGATE PER 100 SQM OF ROAD SURFACE INCLUDING ROLLING AND FINISHING WITH ROAD ROLLER ALL COMPLETE.
Providing and applying tack coat using hot straight run bitumen of grade 80/ 100 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :On W.B.M. @ 0.75 Kg / sqm.
Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required bituminous portion
SCARIFYING METALLED ( WATER- BOUND) ROAD SURFACE INCLUDING DISPOSAL OF RUBBISH LEAD UPTO 50 M AND CONSOLIDATION OF THE AGGREGATE RECEIVED FROM SCARIFYING WITH POWER ROAD ROLLER OF 8 TO 10 TONNE CAPACITY.
Providing and applying 2.5mm thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour ,T& amp ;P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications.
Carriage of Mining Muck Boulders from Outside of IBM Gate and Spreading, Filling voids by Earth/Moorum & Compaction by Road Roller in Bedding Building as per the direction of Engineer-In-Charge.
Carriage of material by mechanical transport including loading, unloading and stacking, Sand, Stone Aggregates below 40 MM nominal Size: Lead 1 KM.
M/s Shri Krishan Construction Co.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .