| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAdmitted-Finance 0 BAANGAD WALTERGANJ BASTI BASTI UTTAR PRADESH 272182 | BASTI | UTTAR PRADESH | 272182 | L1 | Admitted-Finance | |
| 2 | L2₹24.3 L+₹2,903 (0.12%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹26.2 L+₹2.0 L (8.16%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY CONSTRUCTION COMPANY L1 | M/S LAKSHYA CONSTRUCTION L2 | M/S BABA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.10WORK UNDER EDD-GRAMIN, BASTI (GST Extra) | ||||||
| 2.00 | Safe Loading carraige & Unloading of PCC Poles from store Basti to work site Manauri to Saltauwa under EDD-Gramin Basti | 140 | No | 84,000 ₹84,000 Lowest | 84,000 ₹84,000 Lowest | 1,40,000 ₹1,40,000 |
| 3.00 | Safe Loading carraige & Unloading of STP Poles from store Basti to work site Manauri to Saltauwa under EDD-Gramin Basti | 121 | No | 1,21,000 ₹1,21,000 Lowest | 1,21,000 ₹1,21,000 Lowest | 1,57,300 ₹1,57,300 |
| 4.00 | Safe Loading carraige & Unloading of Remaining ACSR Weasal Coductor HT/LT 8 KM Other Associated Material from store Basti to work site Manauri to Saltauwa under EDD-Gramin Basti | 1 | Job | 24,500 ₹24,500 Lowest | 25,000 ₹25,000 | 1,00,000 ₹1,00,000 |
| 5.00 | Safe Loading carraige & Unloading of Remaining ABC Cable 3x95 Sq mm.( 4.10 KM) & Other Associated Material from store Basti to work site Manauri to Saltauwa under EDD-Gramin Basti | 1 | Job | 30,000 ₹30,000 | 30,000 ₹30,000 | 10,000 ₹10,000 Lowest |
| 6.00 | Laying, Stringing, Tensioning & Binding of New wesal Conduter for HT/LT (8 KM.) Overhead Line at work site Manauri to Saltauwa under EDD-Gramin Basti | 8 | KM | 48,000 ₹48,000 Lowest | 48,000 ₹48,000 Lowest | 60,000 ₹60,000 |
| 7.00 | Laying, stringng & Tighting of ABC Cable3x95 Sq mm.( 4.1 KM) & Other Associated Material at work site Manauri to Saltauwa under EDD-Gramin Basti | 4.1 | Km | 32,800 ₹32,800 Lowest | 32,800 ₹32,800 Lowest | 36,900 ₹36,900 |
| 8.00 | Errection of Single PCC Pole with all fitting at work site Vill Rampur, jogiya Khadra & Pakardad under EDD-III Basti | 140 | No | 1,26,000 ₹1,26,000 Lowest | 1,26,000 ₹1,26,000 Lowest | 1,68,000 ₹1,68,000 |
| 9.00 | Errection of Single STP Pole with all fitting at work site Vill Rampur, jogiya Khadra & Pakardad under EDD-III Basti | 121 | No | 1,21,000 ₹1,21,000 Lowest | 1,21,000 ₹1,21,000 Lowest | 1,69,400 ₹1,69,400 |
| 10.00 | Grouting of PCC Pole with Cement Bricks Ballast & coarse sand as per standerd specifications | 261 | No | 2,23,416 ₹2,23,416 Lowest | 2,23,416 ₹2,23,416 Lowest | 2,34,900 ₹2,34,900 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
22 Aug 2025, 2:00 pmClosed
SE EDC BASTI
SE EDC BASTI
HT LT Line Shifting Work under Deposit Head 2025 26 under EDD GRAMIN Basti
2025_PVVNV_1065384_1
29/EDC(B)/2025-26
Open Tender
Electrical Works
Lump-sum
BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹3,540
SE EDC
₹25,000
2 Sept 2025
13 Aug 2025
23 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
WORK UNDER EDD-GRAMIN, BASTI (GST Extra)
Safe Loading carraige & Unloading of PCC Poles from store Basti to work site Manauri to Saltauwa under EDD-Gramin Basti
Safe Loading carraige & Unloading of STP Poles from store Basti to work site Manauri to Saltauwa under EDD-Gramin Basti
Safe Loading carraige & Unloading of Remaining ACSR Weasal Coductor HT/LT 8 KM Other Associated Material from store Basti to work site Manauri to Saltauwa under EDD-Gramin Basti
Safe Loading carraige & Unloading of Remaining ABC Cable 3x95 Sq mm.( 4.10 KM) & Other Associated Material from store Basti to work site Manauri to Saltauwa under EDD-Gramin Basti
Laying, Stringing, Tensioning & Binding of New wesal Conduter for HT/LT (8 KM.) Overhead Line at work site Manauri to Saltauwa under EDD-Gramin Basti
Laying, stringng & Tighting of ABC Cable3x95 Sq mm.( 4.1 KM) & Other Associated Material at work site Manauri to Saltauwa under EDD-Gramin Basti
Errection of Single PCC Pole with all fitting at work site Vill Rampur, jogiya Khadra & Pakardad under EDD-III Basti
Errection of Single STP Pole with all fitting at work site Vill Rampur, jogiya Khadra & Pakardad under EDD-III Basti
Grouting of PCC Pole with Cement Bricks Ballast & coarse sand as per standerd specifications
Fixing, Binding & Tighitng of Stay
Dismentaling Charge Old &Used ACSR Weasal Conductor HT/LT & Other Material
Unmounting, Shifting & Mounting Charge of TF 100 KVA
Unmounting, Shifting & Mounting Charge of TF 63 KVA
Unmounting, Shifting & Mounting Charge of TF 25 KVA
Unmounting, Shifting & Mounting Charge of TF 10 KVA
HT/LT Dismentaling Charge Old &Used PCC/ST/Rail Pole
Disconnection & Reconnection of Live Consumer Charges
HT/LT Tree Branchess Cutting of work at site
HT/LT O&U/Scrab Material Cortage Charges From Site to Store Basti
Decentralized Materials
Supply of Dead in Clamp
Spply of LT Parcieng Conecter for DB Box
Supply of Danger Board
Supply of Birbed Wire
supply of suspension clamp
supply of Eye Hook
Grouting of Stay
Grouting of Stay
Grouting of Pole
Supply of GI Wire
DB Box Clamp
Cross Arm Holding Clamp
MS Nut & Bolt Various Size for HT/LT line
T-off/Top/Dropper Channel Clamp for HT line
Supply of F-Braket for HT Line
M/S LAKSHYA CONSTRUCTION (BID ID -5472530)
M/S BABA ENTERPRISES (BID ID -5473046)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .