Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.2 L+₹37,930.20 (6.53%)Admitted-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected as per TC |
| Sl No | Description | Qty | Unit | NANDI ENTERPRISE L2 | SK HASIBUL L1 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00 | Loading on trolleys, lowering through pit shaft, transportation, placing & installation of Endless Haulage electrical equipment (Motor, Starter, Liquid Controller, Switch, Power Cable) | 48 | Hds | 2,133.56 ₹1,02,410.88 | 1,937.49 ₹92,999.52 Lowest |
| 3.00 | Shifting of 3 nos. multistage pumps (180m head, 500GPM) with motor & bed plate (~180m distance) at two times | 144 | Hds | 1,986.52 ₹2,86,058.88 | 1,937.49 ₹2,78,998.56 Lowest |
| 4.00 | Shifting of dismantled suction pipes, re-fitting of foot valve, delivery pipes with sluice valve, NRV for 3 pumps at two times | 54 | Hds | 2,133.56 ₹1,15,212.24 | 1,934.87 ₹1,04,482.98 Lowest |
| 5.00 | Shifting of all starters, controlling switches & laying power cable at safer place near pumping set at two times | 54 | Hds | 2,133.56 ₹1,15,212.24 | 1,934.87 ₹1,04,482.98 Lowest |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹6.9 L
EMD Value
₹8,600
Closing Date
2 Mar 2026, 5:00 pmClosed
Area Engineer(EnM)
Kenda Area
Re-installation of all electrical equipment for Endless Haulage (located 14Level-0 Dip) and shifting of the existing multistage pumps complete sets at 6 no. pit (UG) under Lower Kenda Colliery
2026_ECL_353846_1
GM/KND/AE(ENM)/55(TN)/25-26/70
Open Tender
Miscellaneous Works
Item Rate
10 days
Lower Kenda Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,600
12 Mar 2026
20 Feb 2026
3 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
20 Feb 2026 - 27 Feb 2026
Item Description/ Heading
Loading on trolleys, lowering through pit shaft, transportation, placing & installation of Endless Haulage electrical equipment (Motor, Starter, Liquid Controller, Switch, Power Cable)
Shifting of 3 nos. multistage pumps (180m head, 500GPM) with motor & bed plate (~180m distance) at two times
Shifting of dismantled suction pipes, re-fitting of foot valve, delivery pipes with sluice valve, NRV for 3 pumps at two times
Shifting of all starters, controlling switches & laying power cable at safer place near pumping set at two times
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_366659.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .