Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 LAdmitted-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹6.2 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected as per TC |
| Rank | Bidder | Total Amount |
|---|---|---|
| L2 | NANDI ENTERPRISE Bid ID 1222491 | ₹6,18,894.24 |
| L1 | SK HASIBUL Bid ID 1220952 | ₹5,80,964.04 |
| Sl No | Description | Qty | Unit | NANDI ENTERPRISE L2 | SK HASIBUL L1 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00 | Loading on trolleys, lowering through pit shaft, transportation, placing & installation of Endless Haulage electrical equipment (Motor, Starter, Liquid Controller, Switch, Power Cable) | 48 | Hds | 2,133.56 ₹1,02,410.88 | 1,937.49 ₹92,999.52 |
| 3.00 | Shifting of 3 nos. multistage pumps (180m head, 500GPM) with motor & bed plate (~180m distance) at two times | 144 | Hds | 1,986.52 ₹2,86,058.88 | 1,937.49 ₹2,78,998.56 |
| 4.00 | Shifting of dismantled suction pipes, re-fitting of foot valve, delivery pipes with sluice valve, NRV for 3 pumps at two times | 54 | Hds | 2,133.56 ₹1,15,212.24 | 1,934.87 ₹1,04,482.98 |
| 5.00 | Shifting of all starters, controlling switches & laying power cable at safer place near pumping set at two times | 54 | Hds | 2,133.56 ₹1,15,212.24 | 1,934.87 ₹1,04,482.98 |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹6.9 L
EMD Value
₹8,600
Closing Date
2 Mar 2026, 5:00 pmClosed
Area Engineer(EnM)
Kenda Area
Re-installation of all electrical equipment for Endless Haulage (located 14Level-0 Dip) and shifting of the existing multistage pumps complete sets at 6 no. pit (UG) under Lower Kenda Colliery
2026_ECL_353846_1
GM/KND/AE(ENM)/55(TN)/25-26/70
Open Tender
Miscellaneous Works
10 days
Lower Kenda Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,600
12 Mar 2026
20 Feb 2026
3 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
20 Feb 2026 - 27 Feb 2026
Item Description/ Heading
Loading on trolleys, lowering through pit shaft, transportation, placing & installation of Endless Haulage electrical equipment (Motor, Starter, Liquid Controller, Switch, Power Cable)
Shifting of 3 nos. multistage pumps (180m head, 500GPM) with motor & bed plate (~180m distance) at two times
Shifting of dismantled suction pipes, re-fitting of foot valve, delivery pipes with sluice valve, NRV for 3 pumps at two times
Shifting of all starters, controlling switches & laying power cable at safer place near pumping set at two times
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_366659.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid