| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 36.79 | Cum | 265 ₹9,749.35 | 263 ₹9,675.77 |
| 2.00 | Filling with M.sand with cost and conveyance including all other labour charges etc complete | 2.63 | Cum | 1,740 ₹4,576.2 | 1,736 ₹4,565.68 |
| 3.00 | CC 1:4:8 mix using 40mm ISS HBG metal with cost and conveyance including all other labour charges etc complete | 8.23 | Cum | 5,345 ₹43,989.35 | 5,344 ₹43,981.12 |
| 4.00 | Centering with shuttering for all cc works using MS sheet with cost and conveyance Incluidng all other labour charges etc complete | 36.84 | Sqm | 548 ₹20,188.32 | 547 ₹20,151.48 |
| 5.00 | For Above GL | 20.46 | Sqm | 1,096 ₹22,424.16 | 1,095 ₹22,403.7 |
| 6.00 | CC 1:3:6 mix using 40mm ISS HBG metal with cost and conveyance including all other labour charges etc complete | 11.34 | Cum | 5,615 ₹63,674.1 | 5,610 ₹63,617.4 |
| 7.00 | Supply and fabrication of steel for all cc works using RTS rod with cost and conveyance including all other labour charges etc complete | 0.54 | MT | 91,855 ₹49,601.7 | 91,850 ₹49,599 |
| 8.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 6.25 | Cum | 6,635 ₹41,468.75 | 6,630 ₹41,437.5 |
| 9.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal with cost and conveyance including all other labour charges etc complete | 5.04 | Cum | 9,067 ₹45,697.68 | 9,066 ₹45,692.64 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18% | 1 | GST Amount | 54,246.53 ₹54,246.53 | 54,202.37 ₹54,202.37 |
Tender Value
₹3.6 L
EMD Value
₹4,000
Closing Date
24 Dec 2025, 3:00 pmClosed
BDO BP
KTR
Construction of RCC slab Culvert to CSI Kovil 1st Street in Nedungundram Panchayat at Kattankolathur Panchayat Union
2025_RDTN_634280_1
576/2025/A2 dt 15.12.2025
Open Tender
Civil Works
90 days
BDO KTR
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹4,000
Yes
6 May 2026
19 Dec 2025
24 Dec 2025
19 Dec 2025
24 Dec 2025
19 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: The Block Development officer(BP), Kattankolathur Panchayat Union.
Name of Work: Construction of RCC slab Culvert to CSI Kovil 1st Street in Nedungundram Panchayat at Kattankolathur Panchayat Union Estimate Amount:Rs.3.60Lakhs
Tender Reference No :576/2025/A2 Dt:18.12.2025
Sl. No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE exclusive of GST in figures To be entered by the Bidder (Reffer section 2, ITB, Clause 13.3 of SBD) Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT TOTAL AMOUNT In Words
1 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B BI01010001010000000000000515BI0100001242 36.79 Cum Excess(+) Full Conversion INR
2 Filling with M.sand with cost and conveyance including all other labour charges etc complete BI01010001010000000000000515BI0100001243 2.63 Cum Excess(+) Full Conversion INR
3 CC 1:4:8 mix using 40mm ISS HBG metal with cost and conveyance including all other labour charges etc complete BI01010001010000000000000515BI0100001244 8.23 Cum Excess(+) Full Conversion INR
4 Centering with shuttering for all cc works using MS sheet with cost and conveyance Incluidng all other labour charges etc complete BI01010001010000000000000515BI0100001245 36.84 Sqm Excess(+) Full Conversion INR
5 For Above GL BI01010001010000000000000515BI0100001246 20.46 Sqm Excess(+) Full Conversion INR
6 CC 1:3:6 mix using 40mm ISS HBG metal with cost and conveyance including all other labour charges etc complete BI01010001010000000000000515BI0100001247 11.34 Cum Excess(+) Full Conversion INR
7 Supply and fabrication of steel for all cc works using RTS rod with cost and conveyance including all other labour charges etc complete BI01010001010000000000000515BI0100001248 0.54 MT Excess(+) Full Conversion INR
8 Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. BI01010001010000000000000515BI0100001249 6.25 Cum Excess(+) Full Conversion INR
9 RCC 1:1.5:3 mix using 20mm ISS HBG metal with cost and conveyance including all other labour charges etc complete BI01010001010000000000000515BI0100001250 5.04 Cum Excess(+) Full Conversion INR
10 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18% BI01010001010000000000000515BI0100001251 1 GST Amount Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_758957.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_758957.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid