Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance R O RAMBAN GARHI | Admitted-Finance |
Tender Value
₹76,630
EMD Value
₹1,533
Closing Date
6 Dec 2022, 4:30 pmClosed
ER GIAN SINGH
OFFICE OF THE EXECUTIVE ENGINEER REW RAMBAN MAITRA
AS PER THE NIT ATTACHED
2022_RDPR_197834_9
NIT NO 90 OF REW RAMBAN FRESH OF 78,81 AND ABDP
Open Limited
Civil Works
Item Wise
30 days
RAMBAN
AS PER THE NIT ATTACHED
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW RAMBAN MAITRA
₹1,533
8 Dec 2022
29 Nov 2022
7 Dec 2022
29 Nov 2022
6 Dec 2022
29 Nov 2022
Amount
Earth work excavation by manual means over areas, (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m,as directed by engineer in charge. in all kinds of soils.
Providing/Laying dry boulder stone pitching on horizontal surface
Providing/Laying of cement concrete of specified grade with 1:3:6 mix excluding cost of shuttering with 20mm aggregate size with 30% boulders.including loading,unloading and carriage of materials
Providing/Laying in position reinforced cement concrete of specified grade with 1:2:4 mix in foundation and plinth excluding cost of shuttering with 20mm aggregate size including loading,unloading and carriage of materials
Providing/Laying in position reinforced cement concrete of specified grade with 1:1.5:3 mix in foundation and plinth excluding cost of shuttering with 20mm aggregate size including loading,unloading and carriage of materials
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
12mm Cement plaster on the rough side of single or half brick wall of mix:1 : 4 ( 1 cement : 4 fine sand)
Centring and shuttering including struting and proping and removal of form work for foundation and plinth etc
Centring and shuttering including struting and proping and removal of form work for walls,etc
Centring and shuttering including struting and proping and removal of form work for edges of slabs,etc
Provision for Citizen Information Board
Mohd Amin
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .