| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹41.0 LAccepted-Finance | ₹41.0 L | 1st lowest | Accepted-Finance FIDELSYS DEVELOPERS PRIVATE LIMITED lowest bidder |
| 2 | 2nd lowest₹41.0 LRejected-Finance | ₹41.0 L | 2nd lowest | Rejected-Finance FIDELSYS DEVELOPERS PRIVATE LIMITED lowest bidder |
| 3 | 2nd lowest₹41.0 LRejected-Finance MAHESWARPINDA BOUDH | ₹41.0 L | 2nd lowest | Rejected-Finance FIDELSYS DEVELOPERS PRIVATE LIMITED lowest bidder |
| 4 | 2nd lowest₹41.0 LRejected-Finance | ₹41.0 L | 2nd lowest | Rejected-Finance FIDELSYS DEVELOPERS PRIVATE LIMITED lowest bidder |
| 5 | 2nd lowest₹41.0 LRejected-Finance AT WORDNO 15 PS BOUCH TOAN DIST BOUCH PIN 762014 | BOUDH | ODISHA | 762014 | ₹41.0 L | 2nd lowest | Rejected-Finance FIDELSYS DEVELOPERS PRIVATE LIMITED lowest bidder |
Tender Value
₹52.5 L
EMD Value
₹52,530
Closing Date
19 Feb 2026, 5:00 pmClosed
EERW Division Boudh
O/o SERW Division Boudh
Kharabhuin PWD road Chhak to Khandahata PS road viaSankulei -Panasaputuli- Ghantabania from Ch 0/480 to 4/600 Km for the year 2025-26
2026_CERWI_125925_1
Online Tender18/SERW Division Boudh 2025-26
Open Tender
Civil Works - Roads
30 days
O/o SERWDivision Boudh
Please refer DTCN
4 documents required · 4 mandatory
₹10,000
₹52,530
Yes
12 Mar 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
12 Feb 2026 - 18 Feb 2026
Clearing and grubbing road land in area of light jungle including uprooting rank vagetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of tress cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including watering and cost of labour, cess & all materials etc. complete as per direction of Engineer - in - charge.
Providing, laying, spreading and compacting graded stone aggregate to water bound macadam (using grade III, 53 mm to 22.4mm) specification including premixing the Material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density including lighting, barricadding and maintenance of diversion etc. as per Tables 400.11 & 400.12 and Technical Specification clause 406 with cost of all labour, T&P and with cess, royality, additional charges, DMF 10% & EMF 5% over royalty and as per direction of Engineer-In-Charge.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Technical Specification Clause 502 of MoRD for low porosity surface. and as per direction of Engineer-In-Charge. (By Mechanical Mean)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 of MoRD. and as per direction of Engineer-In-Charge. (By Mechanical Mean)
Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of speficied grading premixed with bituminous binder of 60/70 penetration grade of bitumen , transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for Road & Bridge works and all other T&P articles including cost, conveyance, royality, additional charges, DMF 10% & EMF 5% over royalty Cess, taxes of chips and bitumen & other required materials etc. complete as per specification and direction of the Engineer in charge.
Construction of embankment with approved material obtained from borrow pits transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H specifications for Road and Bridge works (4th Revision) with cost of all labour, T&P and with cess, royality and as per direction of Engineer-in-charge. (Payment of earthwork will be made compacted level section) only
Please Enable Macros to View BoQ information
stage.html
html • 0.10 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 3.54 MB
BOQ_580973.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid