| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -0.06% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 LAdmitted-Finance | -0.03% | ₹3.0 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance VILL MOHAR P S SABANG DIST PASCHIM MEDINIPUR | PURULIA | WEST BENGAL | 723101 | -0.01% | ₹3.0 L | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,020
Closing Date
23 Feb 2026, 6:00 pmClosed
PRADHAN BHEMUA GRAM PANCHAYAT
BHEMUA
Construction of Concrete road from Kerurbar PWD Bandh to Pashupati Sahoo House
2026_ZPHD_994165_2
WB/PMZP/SBG/BHE/25-26/NIET-32
Open Tender
CIVIL WORKS
30 days
KERURBAR
REFER TO NIT
4 documents required · 4 mandatory
₹500
PRADHAN BHEMUA GRAM PANCHAYAT
₹6,020
12 Mar 2026
27 Jan 2026
26 Feb 2026
27 Jan 2026
23 Feb 2026
27 Jan 2026
Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30. (Extra quantity of earth for filling shall be obtained from road side borrow pits.)
Supplying, spreading and consolidating Moorum and Sand to a depth of 75 mm at desired density and C.B.R. as per specification with Hand roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification.Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67. (The payment is to be made on the basis of the finished compacted volume of moorum.)
Supplying & Laying Polytheneshet(150gm/sqm)over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches
Providing and laying Design Mix concrete for plain / reinforced concrete work with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. M-20 Grade Using concrete mixer.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (Borrow pit /pre work post work measurement).
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
Photo Taking in Pre Stage, working stage and post work.
GST (18%) & Labour Cess (1%)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_2432112.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid