| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | ₹18.6 L | L1 | Accepted-AOC BID ACCEPTED. HENCE, L1 BIDDER |
| 2 | L2₹19.4 LRejected-AOC FIRST FLOOR 360 1 GREEN CITY KONDARASAMPALAYAM CHITHRAVUTHANPALAYAM DHARAPURAM TK TIRUPPUR 638657 | TIRUPPUR | TAMIL NADU | 638657 | ₹19.4 L | L2 | Rejected-AOC BIDDER REJECTED. HENCE L2 BIDDER |
| 3 | L3₹19.8 LRejected-AOC | ₹19.8 L | L3 | Rejected-AOC BIDDER REJECTED. HENCE L3 BIDDER |
| 4 | L4₹20.9 LRejected-AOC | ₹20.9 L | L4 | Rejected-AOC BIDDER REJECTED. HENCE L4 BIDDER |
| Sl No | Description | Qty | Unit | SRI NANDHAA CONSTRUCTIONS L4 | SRI MANJUNATHA INDUSTRIES L1 | SRI SAKTHIVEL AND CO L2 | RAJA ASSOCIATES L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 37.94 | CUM | 263.5 ₹9,997.19 | 248 ₹9,409.12 | 245 ₹9,295.3 Lowest | 258.5 ₹9,807.66 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. | 23.26 | CUM | 5,460.5 ₹1,27,011.23 | 5,134.27 ₹1,19,423.12 | 5,078 ₹1,18,114.28 Lowest | 5,228.69 ₹1,21,619.38 |
| 3.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 3.77 | CUM | 6,759 ₹25,481.43 | 6,354.85 ₹23,957.78 | 6,286 ₹23,698.22 Lowest | 6,495.09 ₹24,486.48 |
| 4.00 | Filling with excavated earth including all labour charges as per standard specification. | 95.13 | CUM | 46 ₹4,375.98 | 43.11 ₹4,101.05 | 43 ₹4,090.59 Lowest | 44.93 ₹4,274.48 |
| 5.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items | 1 | SQM | - | 514.76 ₹514.76 Lowest | - | - |
| 6.00 | a) Centering for Below ground level | 38.32 | SQM | 547.5 ₹20,980.2 | 514.76 ₹19,725.6 | 509 ₹19,504.88 Lowest | 536.55 ₹20,560.6 |
| 7.00 | b) Centering for column | 56.93 | SQM | 1,204.5 ₹68,572.18 | 1,132.47 ₹64,471.52 | 1,120 ₹63,761.6 Lowest | 1,180.41 ₹67,200.74 |
| 8.00 | c) Slab Centering | 130.34 | SQM | 1,642.5 ₹2,14,083.45 | 1,544.28 ₹2,01,281.46 | 1,528 ₹1,99,159.52 | 1,073.1 ₹1,39,867.85 Lowest |
| 9.00 | Supplying and Fabrication Steel rainforcement including all cost and conveyance etc complete | 3.9 | M | 91,902.5 ₹3,58,603.55 | 86,406.88 ₹3,37,159.65 | 85,469 ₹3,33,500.04 Lowest | 90,028.54 ₹3,51,291.37 |
| 10.00 | RCC 1:1.5:3 mix using 20mm HBG ISS Metal including all cost and conveyance etc complete | 30.04 | CUM | 9,194 ₹2,85,933.4 | 8,644.57 ₹2,59,682.88 Lowest | 8,550 ₹2,65,905 | 8,877.89 ₹2,66,691.77 |
Tender Value
₹21.1 L
EMD Value
₹21,150
Closing Date
2 Jul 2026, 3:00 pmClosed
BDO BP DHARAPURAM
BDO BP, BLOCK DEVELOPMENT OFFICE DHARAPURAM
Construction of Cement Godown Near New Panchayat Union Office at Nanjiyampalayam H/o Nanjiyampalayam Panchayat.
2026_RDTN_681495_1
868/2025/A2
Open Tender
Civil Works
Works
NANJIYAMPALAYAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,150
Yes
BDO OFFICE DHARAPURAM
29 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 37.94 | CUM | - | - |
| 2 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. | 23.26 | CUM | - | - |
| 3 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 3.77 | CUM | - | - |
| 4 | Filling with excavated earth including all labour charges as per standard specification. | 95.13 | CUM | - | - |
| 5 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casuarinas props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items | 1 | SQM | - | - |
| 6 | a) Centering for Below ground level | 38.32 | SQM | - | - |
| 7 | b) Centering for column | 56.93 | SQM | - | - |
| 8 | c) Slab Centering | 130.34 | SQM | - | - |
| 9 | Supplying and Fabrication Steel rainforcement including all cost and conveyance etc complete | - | M | - | - |
| 10 | RCC 1:1.5:3 mix using 20mm HBG ISS Metal including all cost and conveyance etc complete | 30.04 | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TechnicalBid.pdf
Tender Documents • 0.83 MB
BOQ_819032.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].