| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹34.8 LAccepted-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L-1 | Accepted-Finance LOWEST TENDERER | |
| 2 | L-2₹35.7 L+₹91,108 (2.62%)Rejected-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | L-2 | Rejected-Finance GREATER THAN L1 | |
| 3 | L-3₹36.0 L+₹1.2 L (3.35%)Rejected-Finance | L-3 | Rejected-Finance GREATER THAN L1 | |
| 4 | L-4₹36.5 L+₹1.7 L (4.93%)Rejected-Finance WZ 109 PLOT NO 327 CHAND NAGAR NEW DELHI | L-4 | Rejected-Finance GREATER THAN L1 |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
10 Sept 2020, 6:00 pmClosed
Maj Komal Parihar
GE (I) (NAVY), INS SHIVAJI - POST, LONAVLA -410402
ANNUAL MAINTENANCE OPERATION AMC AND REPAIRS/REPLACEMENT OF CENTRALIZED WATER SUPPLY SYSTEM AND CENTRALISED WATER SUPPLY PUMPING AND DISTRIBUTION SYSTEM SCADA SYSTEM UNDER GE I N LONAVLA
2020_MES_371205_1
GE/LONAVLA/8915/E8
Open Tender
Civil Works
Item Rate
330 days
GE (I) (NAVY) LONAVLA
As per NIT /Tender documents
4 documents required · 4 mandatory
₹500
Yes
GEINDEPNAVYLONAVLA
₹70,000
Yes
15 Sept 2020
21 Aug 2020
12 Sept 2020
21 Aug 2020
10 Sept 2020
28 Aug 2020
22 Aug 2020 - 27 Aug 2020
Amount
AMC / Outsourcing the resources for Monitoring, Management, and Operation of power distribution system. It includes providing the following manpower (1). 1 trained technician ITI qualified at SCADA Room for attending/monitoring the breakdown and preventive maintenance in general shift (up to 330 days) and (2). 1 company trained technician once in a month (OEM of PLC Panels) for successful working of the system under GE(I) Navy Lonavla complete all as specified and directed. (i) Automation Panel at VCB Room (x) Automation Panel at Nausenabad (ii) Automation Panel at Rajendra Nagar (xi) Automation Panel at Airforce (iii) Automation Panel at Pratap Nagar (xii) Automation Panel at Beas Block (iv) Automation Panel at CCEL (xiii) Automation Panel at KV School (v) Automation Panel at CAC (xiv) Automation Panel at CSDR (vi) Automation Panel at ITW (xv) Automation Panel at Ward Room (vii) Automation Panel at Substation-1 (xvi) Automation Panel at Clear Water (viii) Automation Panel at Betwa (xvii) Automation Panel at DEW (ix) Automation Panel at EPCT School
Comprehensive maintenance shall include the following: (a) Servicing and maintenance /repair and replacement of defective components /spare parts with new one of PLC based control panels including all accessories modem etc. installed at various substation and Master control station. (b) Repair/maintenance by disconnecting, cleaning, greasing for wear and tear, complete servicing, refixing, lathing, installing and commissioning as directed by Engineer-in-Charge of all Level and Temprature Sensors. (c) Any changes to the Programmable Logic Controller (PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of items covered under this AMC). (d) Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of items covered under this AMC). (e) Mailing of SCADA reports related to all the systems to AGE/JE every week. (f) Attending break down maintenance and replacement of unserviceable spare parts with new ones as required at site complete all as specified and directed by Engineer-in-charge.
Notes: - (1) All components/spare parts replaced covered under "SPARES" shall be of the same make as specified in Particular Specifications and model / cat as per the existing and shall be measured and paid seperatly under relevant items of this BOQ and fixing charges shall be deemed to be included in this item. Nothing extra shall be admissible on this account.The additional parts required for smooth and efficient operation/replacement etc for system other than the spares in the BOQ shall be replaced with new ones without any extra cost. (2) The quoted rate shall also be inclusive of all the charges for the communications, i.e. 01 Nos broad band connection with static IP at SCADA Room related to this scope of work (3) Servicing of PLC based control Panels, communication Panels, Mimic Panels shall be carried out by authorized representative of M/s Universal Switch Gear Control. The technician shall submit a letter from the manufacturer as proof of his being a authorized representative of the manufacturer. The technician shall also submit a signed report on original letterhead of the manufacturer that servicing has been carried out by him.
(5) Any changes to the Programmable Logic Controller (PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of M/s Universal Switch Gear Control. The programmer shall submit a letter from the manufacturer as proof of his being an authorized representative of the manufacturer. The programmer shall also submit a signed report on original letterhead of the manufacturer that servicing has been carried out by him. (6) Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of M/s Universal Switch Gear Control.. The technician shall submit a letter from the manufacturer as proof of his being a authorized representative of the manufacturer. (7) Repairs to LT Panel, Transformer etc are not in the scope of work. Un-serviceabililty of the same shall be intimated to the concerned JE/ Engineer-In-Charge E/M for repairs.
All the notes given vide 1.02, 1.03 above shall also be read in conjunction with the following: (A) The repair and maintenance of SCADA system should be done through OEM (M/s Universal Switch Gear Control). (B) Within 15 days of acceptance of tender, the successful bidder shall submit a Memorandum of Understanding (MoU) from OEM in a non-judicial stamp paper of Rs 100.00 duly notorised with an undertaking stating that execution of all SCADA related items of work shall be carried out under technical support and guidance of OEM.
Supply of 5A Current Transformer of suitable rating for the existing load on the LT Feeder Pillar panel complete all as specified and directed. Make: L&T / AE / Trinity
Supply of Temprature Sensor with thermocouple for transformer oil and transformer winding suitable for mounting on existing transformer complete all as specified and directed. Make: Pepperl fuch / Banner / Universal / Ratix
Supply of Oil level sensor and transmitter complete all as specified and directed. Make: Pepperl fuch / Banner / Universal / Ratix
Supply of single phase Preventor complete all as specified and directed. Make : Minilec / Schneider / Siemens
Supply of Relay Card 4 C/O, 24 V DC all as specified and directed. Make : Omron / Schneider / Siemens
Supply of Relay with base 4 C/O, 240 V AC all as specified and directed. Make : Omron / Schneider / Siemens
Supply of 22 mm LED Indicator Colour Red, Yellow, Green complete all as speicifed and directected. Make : ESBEE / Schneider / Siemens
Supply of 10 mm LED Indicator Colour Red, Yellow, Green complete all as speicifed and directected.
Supply of PLC (Programmable Logic Controller) complete all as specified and directed. Make : ABB / Schneider / Siemens
Supply only I/O module Level sensing Card for Programmable Logic Controller complete all as specified and directed Make : ABB / Schneider / Siemens
Supply of Push button with LED Indicator - 220 V A.C. Colour/Red/yellow/Green. Make : ESBEE / Schneider / Siemens
Supply of SMPS input 230 V/AC, Output 24V DC complete all as specified and directed. Make : Omron / Schneider / Siemens
Supply of Capacitors and Resistor for UPS of 1KVA complete all as specified and directed.
Supply only power contactor 9A 3P complete all as specified and directed Make : L&T / Schneider / Siemens
Supply only 4 Core 1.5sq.mm. PVC sheathed PVC insulated copper armoured cable. Make: Havells/Polycab/Gloster
Supply only 6 Core 1.5sq.mm. PVC sheathed PVC insulated copper armoured cable. Make: Havells/Polycab/Gloster
AMC / Outsourcing the resources for Monitoring, Management, and Operation of water supply management system. It includes every week visit of (1). 1 trained technician ITI qualified at SCADA Room for attending/monitoring the breakdown and preventive maintenance in general shift (up to 330 days) and (2). 1 company trained technician once in a month (OEM of PLC Panels and Motorized Valves) for successful working of the system under GE(I) Navy Lonavla complete all as specified and directed. (i) Raw Water Pump House (ii) MID Pump House (iii) Clear Water Pump House (iv) Fire Fight OHT (v) Victualing OHT (vi) Rajendra Nagar OHT (vii) Pratap Nagar OHT (viii) Barrack OHT (ix) New & Old Kasturi OHT
Comprehensive maintenance shall include the following: (a) Servicing and maintenance /repair and replacement of defective components /spare parts with new one of PLC based control panels including all accessories modem, antenna etc. installed at various pump houses, OHTs and Master control station. (b) Repair/maintenance by disconnecting, cleaning, greasing for wear and tear, complete servicing, refixing, lathing, installing and commissioning as directed by Engineer-in-Charge of all motorised and solenoid valves, Pressure Transmitters, Ultrasonic and magnetic Level sensors. (c) Any changes to the Programmable Logic Controller (PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of items covered under this AMC) (d) Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of items covered under this AMC) (e) Mailing of SCADA reports related to all the systems to AGE/JE every week (f) Attending break down maintenance (within 4 hours of reporting time) and replacement of unserviceable spare parts with new ones as required at site complete all as specified and directed by Engineer-in-charge
Notes: - (1) All components/spare parts replaced covered under "SPARES" shall be of the same make as specified in Particular Specifications and model / cat as per the existing and shall be measured and paid seperatly under relevant items of this BOQ and fixing charges shall be deemed to be included in this item. Nothing extra shall be admissible on this account.The additional parts required for smooth and efficient operation/replacement etc for system other than the spares in the BOQ shall be replaced with new ones without any extra cost. (2) The quoted rate shall also be inclusive of all the charges for the communications, i.e. 01 Nos broad band connection with static IP at SCADA Room related to this scope of work. Monitoring services & monitoring communication system is the responsibility of contractor. (3) Servicing of Motorised valve, PLC base control Panels, communication Panels, Mimic Panels shall be carried out by authorized representative of OEM. The technician shall submit a letter from the manufacturer as proof of his being a authorized representative of the manufacturer. The technician shall also submit a signed report on original letterhead of the manufacturer that servicing has been carried out by him.
(5) Any changes to the Programmable Logic Controller (PLC), e.g. Changes in ladder logic of programme, changes in operational timing, etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of OEM. The programmer shall submit a letter from the manufacturer as proof of his being an authorized representative of the manufacturer. The programmer shall also submit a signed report on original letterhead of the manufacturer that servicing has been carried out by him. (6) Any changes to the SCADA software, e.g. Changes in report format, changes in operational screens, creation of soft keys etc. (limited to the scope of work covered under this AMC) shall be carried out by authorized representative of OEM. The technician shall submit a letter from the manufacturer as proof of his being a authorized representative of the manufacturer. (7) Repairs to pump sets, starters, controls, valves etc are not in the scope of work. Un-serviceabililty of the same shall be intimated to the concerned JE/ Engineer-In-Charge for repairs. In such situation the breakdwon period before the pumpsets put into working condition will not be considered as default of the contractor. (8) The complaints regarading SCADA system should be attended within 8 hrs, any major problem which requires more than 24 hrs should be intimated / reported to EIC and panelty of Rs 1000/- per complaint should be imposed on contractor if complaint is not rectified within 72 hrs.
All the notes given vide 1.02, 1.03 above shall also be read in conjunction with the following: (A) The repair and maintenance of SCADA system should be done through OEM or through the authorised service provider of the OEM. (B) Within 15 days of acceptance of tender, the successful bidder shall submit a Memorandum of Understanding (MoU) from OEM in a non-judicial stamp paper of Rs 100.00 duly notorised with an undertaking stating that execution of all SCADA related items of work shall be carried out under technical support and guidance of OEM.
Supply of Flow Switch along with all necessary installation accessories like GI barrel piece, double nipple etc with following specification :- Type:- Pedal Designed Line Pressure:- 150 PSIG Make: Switzer / Siemens / Rapid Control
Supply of Pressure Transmitter with proper wiring including necessary power pack for supply of DC :- Power supply: 10-36 V DC Enclosure: whether proof IP 65 Process temperature: -30 to 120 Celsius Accuracy: 0.25 % Make: Danfoss Cat No. RT-200 or equivalent in Indfos/ Endress+Hauser
Supply of Solenoid Valve 12 mm dia 230 V AC, Brass or stainless steel body, direct acting / diaphragm type, pilot operated Solenoid Valve for air release with manual bypass arrangement along with all necessary installation accessories like gate valve, barrel piece, double nipple, elbows/bends etc with following specification:- (a) Size:- 12mm (b) Designed line pressure:- 6 kg/sqcm (c) Body Material:- Stainless Steel / Brass (d) Coil Power:- 20W Make : Rotex Cat No. 24101-12 or equivalent in Indfos/ Endress+Hauser
Supply of Solenoid Valve 20 mm dia 230 V AC, Brass or stainless steel body, direct acting / diaphragm type, pilot operated Solenoid Valve for Priming with manual bypass arrangement along with all necessary installation accessories like gate valve, barrel piece, double nipple, elbows/bends etc with following specification:- a) Size:- 20mm b)Designed Line Pressure : 10 kg/sqcm (c) Body Material:- Stainless Steel (d) Coil Power:- 40W Make : Rotex Cat No. 24129-20 or equivalent in Indfos/ Endress+Hauser
Supply of HMI (Human Machine Interface) complete all as specified and directed. Make : ABB / Schneider / Siemens
Supply and fix in replacement Electric motor suitable for actuator 100mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make Cat No. UNIVERSAL (U-80/16/220VAC) or equivalent in ROTORK, EMERSON
Supply and fix in replacement Electric motor suitable for actuator 150mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make Cat No. UNIVERSAL (U-150/16/220VAC) or equivalent in ROTORK, EMERSON
Supply and fix in replacement Electric motor suitable for actuator 200mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make Cat No. UNIVERSAL (U-200/16/220VAC) or equivalent in ROTORK, EMERSON
Supply and fix in replacement Electric motor suitable for actuator 250mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make Cat No. UNIVERSAL (U-250/16/220VAC) or equivalent in ROTORK, EMERSON
Supply and fix in replacement Printed Circuit Board (PCB) for Motorized Butterfly valve of size 100, 150 mm complete all as specified and as directed. Make: - UNIVERSAL, ROTORK, EMERSON
Supply and fix in replacement Printed Circuit Board (PCB) for Motorized Butterfly valve of size 200, 250 mm complete all as specified and as directed. Make: - UNIVERSAL, ROTORK, EMERSON
Supply and fix in replacement Gear Box suitable for actuator 100mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make Cat No. UNIVERSAL (U-80/16/220VAC) or equivalent in ROTORK, EMERSON
Supply and fix in replacement Gear Box suitable for actuator 150mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make Cat No. UNIVERSAL (U-150/16/220VAC) or equivalent in ROTORK, EMERSON
Supply and fix in replacement Gear Box suitable for actuator 200mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make Cat No. UNIVERSAL (U-200/16/220VAC) or equivalent in ROTORK, EMERSON
Supply and fix in replacement Gear Box suitable for actuator 250mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make Cat No. UNIVERSAL (U-250/16/220VAC) or equivalent in ROTORK, EMERSON
Supply and fix in replacement Hand Wheel suitable for actuator 100, 150, 200, 250mm dia. Motorized Butterfly valve (20 Kg/N to 30 Kg/N) complete all as specified and as directed. Make : UNIVERSAL / ROTORK /EMERSON
Supply of Ultrasonic Level Transmitter at Sump and overhead tank for measurement of level with following specification:- Range : 0-5 meters Accuracy : 0.5 % minimum Supply Voltage : 24V DC Output : 4-20 mA , 0-10V DC Make: Pepperl+ Fuchs / Nivelco / Siemens
Supply of Actuator Top Cover for 150, 200, 250MM Motorized Butterfly valve complete all as specified and directed Make : Universal / BCH/ Adlec
Supply only Limit Switch for Actuator of size 100, 150, 200, 250 mm Valves complete all as specified and directed.
Supply and fix in replacement of complete set 600VA UPS Make: APC / Emerson / Numeric
M&L for Cable Jointing with Cable Jointing Kit for 2 / 4 / 6 Core 1.5 sqmm cable complete all as specified and as directed.
cooltech engineering services
Universal Switch Gear Control
Suman Uni Controllers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .