Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Fee/PreQual/Technical/Finance | -35.70% | ₹9.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.6 L+₹5,494.50 (0.58%)Admitted-Fee/PreQual/Technical/Finance | -35.33% | ₹9.6 L+₹5,494.50 (0.58%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹9.7 L+₹14,850 (1.56%)Admitted-Fee/PreQual/Technical/Finance | -34.70% | ₹9.7 L+₹14,850 (1.56%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.0 L+₹44,995.50 (4.71%)Admitted-Fee/PreQual/Technical/Finance | -32.67% | ₹10.0 L+₹44,995.50 (4.71%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹10.0 L+₹46,020.15 (4.82%)Admitted-Fee/PreQual/Technical/Finance | -32.60% | ₹10.0 L+₹46,020.15 (4.82%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.8 L
EMD Value
₹44,550
Closing Date
24 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
TRUSS WORK AND ALLIED WORKS OF BHQ FRISAL 1316
2026_RDPR_319815_8
e- NIT No. 55 OF REWK/PRI/2026-27 Dated 06-08-2026
Open Tender
Civil Works
Percentage
60 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
EX ENGINEER REW KULGAM
₹44,550
4 Sept 2026
6 Aug 2026
25 Aug 2026
6 Aug 2026
24 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete.
Welded | 8,399 | kgs | 1 | ₹8,390.6 |
| 2 | Providing and Fixing High Rib G. S. sheet roofing including vertical/curved surface
fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with
bitumen and G.I limpet washers or with G.I. limpet washers filled with
white lead, including a coat of approved steel primer and two coats of
approved paint on overlapping of sheets complete (upto any pitch in
horizontal/vertical or curved surface)excluding the cost of purlins, rafters
and trusses and including cutting to size and shape wherever required.
0.50 mm thick with zinc coating not less than 275 gram/m2.Approved Quality | 262.42 | sqm | - | - |
| 3 | P/F precoated galvanised steel sheet roofing accessories .50mm (+0.50%) total coated thickness Zinc coated 120 grams per sqm or as directed.Ridge plain (450mm) | 25 | Rm | - | - |
| 4 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats)@3.84 kg/sqm | 240 | sqm | - | - |
| 5 | photograph /signboard charges(1.6mm sheets)size OR as directed | 1 | job | 0.2 | ₹0.2 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1060676.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .