Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹5.6 L
Closing Date
7 Jul 2026, 2:00 pm
Similar tender results from the same govt authority in the past 3 years.
Coach Alteration in electrical system in 1000 coaches of 2-Tier LHB against RB LB item no. 546 of 2025-26 (WB item no. 720/2024-25) = 215 Coaches for ER. (PH-21) at C & W Workshop, Eastern RAilway, Liluah.
W_LLH_03_2026-27_R1
W_LLH_03_2026-27_R1
Open
36 Months
Howrah, West Bengal
₹0
₹5.6 L
15 Jun 2026
15 Jun 2026
23 Jun 2026
A-Coach Alteration and Segregation of 110V DC (+ve& -ve) Circuits at all levels and
Supply of Set of Cage Clamp Terminals with Glass fuses (Layout Per as per SKED-938) for 2 tier as per EDML 230, Rev-Nil, Tab-2. Coach Inspection: By RITES/TPI (Inspection cost should be borne by the firm) (S= 26999.44, L= 0.00)
Supply of Polyamide Flexible Conduit NW-17 as per Metre RDSO/PE/SPEC/AC/0138-2009 or latest. Inspection: By RITES/TPI (Inspection cost should be borne by the firm) (S= 42.67, L= 0.00)
Supply of Tube Clamp-PG16 as per RDSO/PE/SPEC/AC/0138-2009 Numbers or latest. (S= 22.42, L= 0.00)
Supply of Cable tray with partition as per scope of work lX50X75- Metre IS737-06. Inspection: By RITES/TPI (Inspection cost should be borne by the firm) (S= 376.58, L= 0.00)
Supply of 20 mm Dia PVC rigid pipe as per scope of work. (S= Metre 26.51, L= 0.00)
Supply of heat shrinkable, polyolefin, high performance cable Set sleeve of size 6.4 mm dia, 2-inch length of required colour as per scope of work. Inspection: By RITES/TPI (Inspection cost should be borne by the firm) (S= 2777.72, L= 0.00)
Supply of 4 Way Socketed couplers as per Drawing no. SKED-947 Numbers and scope of work. (S= 25.25, L= 0.00)
Supply of Cable Jacket, Item-5 as per Spec EDTS-138, Corr-2 or Metre latest. (S= 10.22, L= 0.00)
Supply of Cable Jacket, Item-8 as per spec EDTS-138, Corr-2 or Metre latest. (S= 13.75, L= 0.00)
Supply of Thin Walled flexible elastomeric with copper conductor Metre of size 1.5 SQMM. -colour Grey as per Spec. No. ELRS/SPEC/ELC/0019,'REV'- '3' or latest. Inspection: By RITES/TPI (Inspection cost should be borne by the firm) (S= 31.29, L= 0.00) CW-SHOP-LLH-MECHANICAL/EASTERN RLY
Supply & Provision of printed ferrules for each end Terminal point Set for segregated wires as per scope of work. Inspection: By RITES/TPI (Inspection cost should be borne by the firm) (S= 3156.50, L= 0.00)
Per Labour Work as per scope of work. (S= 0.00, L= 37841.95) Coach Total 24372116.20 Item- 2 Mechanical Work S No. Item Description of Item Unit Qty Rate Amount No
Per Stripping of Cabin Mirrors (QPC-09 nos.) (S= 0.00, L= 35.40) Coach
Per Fitting of Cabin Mirrors (QPC-09 nos.) (S= 0.00, L= 53.10) Coach
Per Stripping of LP Rack (QPC-09 nos.) (S= 0.00, L= 59.00) Coach
Per Fitting of LP rack (QPC-09 nos.) (S= 0.00, L= 88.50) Coach
Stripping of brackets for tranverse upper berths (QPC-35 nos.) Per (S= 0.00, L= 59.00) Coach
Fitting of brackets for tranverse upper berths (QPC-35 nos.) (S= Per 0.00, L= 88.50) Coach
Per Stripping of Coat Hook (QPC-09 nos.) (S= 0.00, L= 17.70) Coach
Per Fitting of Coat Hook (QPC-09 nos.) (S= 0.00, L= 23. 60) Coach
Stripping of Cabin and aisle side above window upper panels Per (QPC-18 nos.) (S= 0.00, L= 590.00) Coach
Fitting of Cabin and aisle side above window upper panels (QPC- Per 18 nos.) (S= 0.00, L= 885.00 ) Coach
Complete Stripping of Cabin and aisle side curved ceiling (QPC- Per 18 nos.) (S= 0.00, L= 590.00) Coach
Complete Fitting of Cabin and aisle side curved ceiling (QPC-18 Per nos.) (S= 0.00, L= 885.00) Coach
Stripping & fitting of partition wall just behind the switch Board Per cabinet. (All sorts of items which are required to strip to expose Coach the electrical wirings underneath will be completely under firm's scope, except seat berth, communication door stripping & fitting) (QPC-01set.) (S= 0.00, L= 13570.00)
Cut out on the FRP panel behind mirror should be length wise Per centrally enlarged from 125 mm to 275 mm (QPC-09 nos.) (S= Coach 0.00, L= 118.00) Total 3668502.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexureV.pdf
ATTACHMENT
BankGuaranteeBondAnnexure-VIA.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
RBA_10_21022018.pdf
ATTACHMENT
RBA__48_09052018.pdf
ATTACHMENT
GCCApril-2022.pdf
ATTACHMENT
CommercialCompliance2022.pdf
ATTACHMENT
GeneralCompliance2022.pdf
ATTACHMENT
Undertaking2022.pdf
ATTACHMENT
TenderForm.pdf
ATTACHMENT
VerificationofContractualStaff.pdf
ATTACHMENT
OnlinePoliceVerification.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018LetterofCredit.pdf
ATTACHMENT
ConservencyCharges07-09-2021.pdf
ATTACHMENT
RBE_20_18.02.2020LabourLaws.pdf
ATTACHMENT
LabourDataShramikKalyanPortal17.10.2018.pdf
ATTACHMENT
InsuranceSuretyBondDated.09.01.2025inGCC.pdf
ATTACHMENT
AdvanceCorrectionSlip1to10toGCCcombined_compressed.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111-compressed.pdf
ATTACHMENT
Scopeofwork2Tier.pdf
ATTACHMENT
checklist.pdf
ATTACHMENT
Download all tender documents and submit your bid