Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.6 LAccepted-Finance | ₹94.6 L | L1 | Accepted-Finance QUALIFIED |
| 2 | L2₹96.5 LRejected-Finance | ₹96.5 L | L2 | Rejected-Finance DISQUALIFIED |
| 3 | L3₹97.6 LRejected-Finance | ₹97.6 L | L3 | Rejected-Finance DISQUALIFIED |
| 4 | L4₹98.7 LRejected-Finance G 3 SUNDER APARTMENT SUBHASH NAGAR UJJAIN | UJJAIN | UJJAIN | MADHYA PRADESH | ₹98.7 L | L4 | Rejected-Finance DISQUALIFIED |
| 5 | L5₹1.0 CrRejected-Finance | ₹1.0 Cr | L5 | Rejected-Finance DISQUALIFIED |
Tender Value
₹1.1 Cr
EMD Value
₹54,300
Closing Date
8 May 2026, 5:30 pmClosed
COMMISSIONER OF UJJAIN MUNICIPAL CORPORATION
Chhatrapati Shivaji Bhavan Aagar Road Ujjain, UMC
CONSTRUCTION OF LIBRARY WORK AT PANWASA NEAR SANJIVANI CLINIC IN W-40
2026_UAD_498617_1
314/Zone 5/E-tender/2026
Open Tender
Civil Works - Buildings
180 days
NEAR SANJIVANI CLINIC W40
As Per Tender Document
4 documents required · 4 mandatory
₹12,500
₹54,300
12 Jun 2026
8 Apr 2026
11 May 2026
8 Apr 2026
8 May 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for foundation, trenches for pipes / cables or drains etc. by mechanical means / manual means (exceeding 30cm in depth.) including ramming of bottom, dressing of sides, disposal of excavated earth including of all lift and lead upto 50m. Disposed earthto be levelled and neatly dressed.
All kinds of soil | - | M3 | - | - |
| 2 | Extra for every additional lift of 1.5 m or part thereof in. | 1 | M3 | - | - |
| 3 | Supplying and filling in plinth under floors including,
watering, ramming consolidating and dressing completeCrusher Stone Dust | 1 | M3 | - | - |
| 4 | Cement concrete grade M-10 (Nominal Mix) with 40 mm maximum
size of stone aggregate | - | M3 | - | - |
| 5 | Reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding upto floor level including cost
of binding wire, wastage and over laps upto 12mm horizontal/ inclined
position of reinforcement bars in slab and beams, plinth, chajjas,
lintels, upto 4.5m vertical length of reinforcement in wall columns (over
laps shall be provided as per requirement of IS : 13920; IS 456 & SP :
34) etc. complete.Thermo-Mechanically Treated bars. (Fe 500 D or more) | 0.8 | KG | - | - |
| 6 | Centering and shuttering including strutting, propping stretching etc.
complete for and removal of form work by sheet plate or ply wood
shuttering for : 19.1.1 Foundations, footings, bases of columns, etc. For mass concrete | 1 | M2 | - | - |
| 7 | Providing and laying in position specified grade of reinforced
cement concrete excluding the cost of centering, shuttering,
finishing and reinforcement - All work up to plinth level :
5.1.1 Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum size
of stone aggregate | 1 | M3 | - | - |
| 8 | Centering and shuttering including strutting, propping stretching etc.
complete for and removal of form work by sheet plate or ply wood
shuttering foColumns, Pillars, Piers, Abutments, Posts and Strut | - | M2 | - | - |
| 9 | Providing and laying in position specified grade of reinforced
cement concrete excluding the cost of centering, shuttering,
finishing and reinforcement - All work up to plinth level :
5.1.1 Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum size
of stone aggregate | - | M3 | - | - |
| 10 | Filling by available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not
exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift
upto 1.5 m | 0.2 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
tenderdocument.pdf
Tender Documents • 1.62 MB
BOQ_599810.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid