Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.1 LAccepted-Finance | ₹75.1 L | L1 | Accepted-Finance Ist Lowest |
| 2 | L2₹81.0 LAccepted-Finance | ₹81.0 L | L2 | Accepted-Finance IInd Lowest |
| 3 | L3₹84.0 LAccepted-Finance | ₹84.0 L | L3 | Accepted-Finance IIIrd Lowest |
| 4 | Not Admitted-Fee/PreQual/Technical B 708 NEO HIGHTS DR LOHIA MARG CIVIL LINES PRAYAGRAJ PRAYAGRAJ PRAYAGRAJ UTTAR PRADESH 211001 UDYAM UP 03 0077658 | PRAYAGRAJ | UTTAR PRADESH | 211001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ASHUTOSH ENTERPRISES L2 | Jagad Electrical & Fabricators L3 | Shaurya shakti enterprises pvt ltd L1 |
|---|---|---|---|---|---|---|
| 1.00Revetment of tower foundation of tower no. 07(DD+6) OF 400 KV Obra B/C-Jaunpur Transmission line as per drawing and specification. The job inclides the following works. | ||||||
| 1.01 | Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth. | 1,186 | Cum | 310 ₹3.7 L | 300 ₹3.6 L | 250 ₹3.0 L |
| 1.02 | Lean Concrete with cement, sand and stone(40 mm stone bllast) in 1:2:4 ratio in foundation including the cost of all material/labour and T&P etc required for proper completion of work satisfactorily. | 12.61 | Cum | 7,000 ₹88,270 | 6,500 ₹81,965 | 5,600 ₹70,616 |
| 1.03 | Ist class stone block masonry work for the constructionj of retaining wall in 1:5 ration cement and sand including the cost of all materials/labours and T&P etc. required for proper completion of work satisfactorily | 783.97 | Cum | 7,600 ₹59.6 L | 8,100 ₹63.5 L | 7,300 ₹57.2 L |
| 1.04 | Concrete in plinth with 20mm stone ballast coarse sand and cement mortar in ration 1:1.5:3 including the cost of all material labour & T&P etc required for proper completion of job satisfactorily. | 48.49 | Cum | 9,400 ₹4.6 L | 9,300 ₹4.5 L | 9,000 ₹4.4 L |
| 1.05 | CC top cover on wall in the ratio of 1:2:4 with 20mm stone ballast, coarse sand and cement mortar. | 2.7 | Cum | 9,000 ₹24,300 | 9,200 ₹24,840 | 8,500 ₹22,950 |
| 1.06 | Soil flling in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete including the cost of earth rayalty, taxes, freight etc. and cost of all material labour and T&P required for proper completion of work satisfactorily | 864 | Cum | 270 ₹2.3 L | 300 ₹2.6 L | 210 ₹1.8 L |
| 1.07 | Soiling of Ist class brick on edge floor including preparation of base to proper slope including cost of all material, labour and T&P etc. required for proper completion of job satisfactorily | 484 | M2 | 2,000 ₹9.7 L | 1,800 ₹8.7 L | 1,600 ₹7.7 L |
| 1.08 | Cost of pipe for weep hole as per requied. | 1 | LS | 2,500 ₹2,500 | 3,000 ₹3,000 | 2,200 ₹2,200 |
Tender Value
₹78.4 L
EMD Value
₹80,000
Closing Date
12 Feb 2026, 4:00 pmClosed
CE(TSE)
CHIEF ENGINEER (TSE) U. P. POWER TRANSMISSION CORPORATION LIMITED 57-GEORGE TOWN PRAYAGRAJ
Work of revetment at tower no. 07(DD 6) OF 400 KV Obra BC-Jaunpur LINE under Transmission Zone South-East Prayagraj
2025_UPTCL_1089988_2
33CE(TSE)/2025-26
Open Tender
Miscellaneous Services
90 days
prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE ETC-I Prayagraj
₹80,000
23 Mar 2026
2 Feb 2026
13 Feb 2026
2 Feb 2026
12 Feb 2026
2 Feb 2026
Revetment of tower foundation of tower no. 07(DD+6) OF 400 KV Obra B/C-Jaunpur Transmission line as per drawing and specification. The job inclides the following works.
Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth.
Lean Concrete with cement, sand and stone(40 mm stone bllast) in 1:2:4 ratio in foundation including the cost of all material/labour and T&P etc required for proper completion of work satisfactorily.
Ist class stone block masonry work for the constructionj of retaining wall in 1:5 ration cement and sand including the cost of all materials/labours and T&P etc. required for proper completion of work satisfactorily
Concrete in plinth with 20mm stone ballast coarse sand and cement mortar in ration 1:1.5:3 including the cost of all material labour & T&P etc required for proper completion of job satisfactorily.
CC top cover on wall in the ratio of 1:2:4 with 20mm stone ballast, coarse sand and cement mortar.
Soil flling in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete including the cost of earth rayalty, taxes, freight etc. and cost of all material labour and T&P required for proper completion of work satisfactorily
Soiling of Ist class brick on edge floor including preparation of base to proper slope including cost of all material, labour and T&P etc. required for proper completion of job satisfactorily
Cost of pipe for weep hole as per requied.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TD.pdf
Tender Documents • 0.74 MB
BOQ_2052791.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid