Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-Finance | ₹15.3 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹16.8 LRejected-Finance | ₹16.8 L | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹20.7 LRejected-Finance HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD PIN 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | ₹20.7 L | L3 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | Top Mind Industries Pvt Limited L1 | Top Mind Industries Pvt Limited L1 | national engineering L3 | Hitech Engineers L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Disconnecting, servicing and cleaning electrically operated FCUs of capacity 3000/ 4500 /6000 Kcal/hr from thermic fluid line complete and keeping aside for decarbonising , cleaning with chemical in all respect with suitable solution / solvent , checking all pipes leakage (inlet and outlet of FCUs) and brazing the punchered pipe where required, cleaning of Y-strainer and reassembling and testing of the same complete all as specified and directed by Engineer-in-Charge. | 130 | Each Job | 1,350 ₹1,75,500 | 1,350 ₹1,75,500 | 1,000 ₹1,30,000 | 800 ₹1,04,000 Lowest |
| 2.00 | S&F in replacement of FCU blower motor, along with DIDW blower for 6000KCal/Hr complete all as specified and directed by engineer-in-charge. | 2 | Each | 1,500 ₹3,000 Lowest | 1,500 ₹3,000 Lowest | 3,000 ₹6,000 | 4,800 ₹9,600 |
| 3.00 | S&F in replacement of FCU blower motor, along with DIDW blower for 3000/4500KCal/Hr complete all as specified and directed by engineer-in-charge. | 12 | Each | 1,500 ₹18,000 Lowest | 1,500 ₹18,000 Lowest | 2,800 ₹33,600 | 4,800 ₹57,600 |
| 4.00 | S&F in replacement of 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter for 6000KCal/Hr complete all as specified and directed by engineer-in-charge. | 2 | Each | 5,000 ₹10,000 | 5,000 ₹10,000 | 3,000 ₹6,000 Lowest | 4,800 ₹9,600 |
| 5.00 | S&F in replacement of 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter for 3000/4500KCal/Hr complete all as specified and directed by engineer-in-charge. | 12 | Each | 5,000 ₹60,000 | 5,000 ₹60,000 | 2,500 ₹30,000 Lowest | 6,400 ₹76,800 |
| 6.00 | S&F in replacement of PCB Card for FCUs upto 6000KCal/hr, complete with paired remote all as specified and directed by engineer-in-charge. | 6 | Each | 500 ₹3,000 Lowest | 500 ₹3,000 Lowest | 3,500 ₹21,000 | 2,800 ₹16,800 |
| 7.00 | S&F in replacement of Fan coil unit of cap 6000 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor including complete all as specified and directed by Engineer-in-charge. | 2 | Each | 11,000 ₹22,000 Lowest | 11,000 ₹22,000 Lowest | 24,000 ₹48,000 | 21,500 ₹43,000 |
| 8.00 | S&F in replacement of Fan coil unit of cap 3000/4500 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor complete all as specified and directed by engineer-in-charge. | 16 | Each | 11,000 ₹1,76,000 Lowest | 11,000 ₹1,76,000 Lowest | 20,000 ₹3,20,000 | 17,500 ₹2,80,000 |
| 9.00 | Taking out air space heater of capacity 60000 K Cal/Hr, disconnecting electrically, repair of air space heater by replacement of under mentioned spare parts and cleaning of burner chamber form inside, including servicing of burners of any make/any type complete if required all as specified and directed by Engr in charge.
Note :i) Spares parts will be measured and paid under Sch Item No. 10.01 to 10.09
ii) Rate for labour and T&P required for supply only items are deemed to be included in above quoted rate. | 4 | Each Job | 10,000 ₹40,000 | 10,000 ₹40,000 | 10,000 ₹40,000 | 800 ₹3,200 Lowest |
| 9.01 | Supply only Solenoid valve of suitable size, 220 V AC | 4 | Each | 50 ₹200 Lowest | 50 ₹200 Lowest | 2,000 ₹8,000 | 850 ₹3,400 |
Tender Value
₹22 L
EMD Value
₹44,000
Closing Date
10 Jun 2026, 6:00 pmClosed
HQ CWE AF Leh
HQ CWE AF Leh
REPAIR/MAINT OF FCUS/ACS, SUMMER AND HEATING APPLIANCES, SOLAR WATER HEATERS, SOLAR SPACE HEATER AND CONEECTED WORKS AT 21 WING AF STN LEH
2026_MES_765433_1
81240/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE(AF)Leh
As per NIT
9 documents required · 9 mandatory
₹500
GE(AF) Leh
₹44,000
Yes
11 Aug 2026
14 May 2026
12 Jun 2026
14 May 2026
10 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting, servicing and cleaning electrically operated FCUs of capacity 3000/ 4500 /6000 Kcal/hr from thermic fluid line complete and keeping aside for decarbonising , cleaning with chemical in all respect with suitable solution / solvent , checking all pipes leakage (inlet and outlet of FCUs) and brazing the punchered pipe where required, cleaning of Y-strainer and reassembling and testing of the same complete all as specified and directed by Engineer-in-Charge. | 130 | Each Job | - | - |
| 2 | S&F in replacement of FCU blower motor, along with DIDW blower for 6000KCal/Hr complete all as specified and directed by engineer-in-charge. | 2 | Each | - | - |
| 3 | S&F in replacement of FCU blower motor, along with DIDW blower for 3000/4500KCal/Hr complete all as specified and directed by engineer-in-charge. | 12 | Each | - | - |
| 4 | S&F in replacement of 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter for 6000KCal/Hr complete all as specified and directed by engineer-in-charge. | 2 | Each | - | - |
| 5 | S&F in replacement of 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter for 3000/4500KCal/Hr complete all as specified and directed by engineer-in-charge. | 12 | Each | - | - |
| 6 | S&F in replacement of PCB Card for FCUs upto 6000KCal/hr, complete with paired remote all as specified and directed by engineer-in-charge. | 6 | Each | - | - |
| 7 | S&F in replacement of Fan coil unit of cap 6000 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor including complete all as specified and directed by Engineer-in-charge. | 2 | Each | - | - |
| 8 | S&F in replacement of Fan coil unit of cap 3000/4500 KCal/Hr, PCB controlled with 3 Rows Deep copper coil in 3/8" construction including 12 mm thick pre - filter, DIDW Centrifugal blower with single phase direct driven motor complete all as specified and directed by engineer-in-charge. | 16 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tenderdocuments1.pdf
Tender Documents • 1.21 MB
BOQ_857272.xls
BOQ • 0.59 MB
CorrectioninBOQ.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].