| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 CrAdmitted-Finance | ₹26.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹26.7 Cr+₹27.4 L (1.04%)Admitted-Finance SIRSA | ₹26.7 Cr+₹27.4 L (1.04%) | L2 | Admitted-Finance |
| 3 | L3₹26.9 Cr+₹44.9 L (1.70%)Admitted-Finance | ₹26.9 Cr+₹44.9 L (1.70%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non responsive |
| Sl No | Description | Qty | Unit | M/s. Shivji Singla and Sons L2 | M/S Shree Karni traders L3 | RAJINDER SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Uprooting Juli Flora /sarkanda
prooting Juli Flora /sarkanda, pahari kikar or arrows upto 0.50m. depth below ground level. | 2,13,320 | Sqm | 1.75 ₹3,73,310 Lowest | 2 ₹4,26,640 | 5 ₹10,66,600 |
| 2.00 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m
30 Cm. to below 60 Cm. Girth | 705 | Each | 200 ₹1,41,000 | 150 ₹1,05,750 Lowest | 200 ₹1,41,000 |
| 3.00 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 60 Cm. to below 120 Cm. Girth | 480 | Each | 905 ₹4,34,400 | 700 ₹3,36,000 Lowest | 905 ₹4,34,400 |
| 4.00 | Silt Clearance/ Removal of blown sand/ Berm Unloading undressed with combined lead upto 50 m. for lined canal section.For FSD more than 2 m. | 2,992.3 | Cum | 40 ₹1,19,692 | 20 ₹59,846 Lowest | 61 ₹1,82,530.3 |
| 5.00 | S & F in position precast R.C.C. stone (M-15 mix) of standard IRC design including finishing in cement sand mortar 1:3, painting with enamel paint, printing letters and numerals etc. complete (MoRTH specifications clause : 800) Guide stones | 151 | Each | 300 ₹45,300 Lowest | 300 ₹45,300 Lowest | 611 ₹92,261 |
| 6.00 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs and above; Earthwork undressed with combined lead upto 50m. | 69,565.6 | Cum | 30 ₹20,86,968 Lowest | 30 ₹20,86,968 Lowest | 55 ₹38,26,108 |
| 7.00 | Earth work excavation in ordinary soil for distributaries and minors having discharge less than 10 cumecs; Kassi work undressed. | 55,834.3 | Cum | 11 ₹6,14,177.3 Lowest | 15 ₹8,37,514.5 | 42 ₹23,45,040.6 |
| 8.00 | Add extra for earth taken from private land, land to be arranged by the contractor through private negotiations. Item applicable on certification by Ex. En. that no earth is available within canal boundary.
for uncommand area | 59,402.6 | Cum | 7 ₹4,15,818.2 | 1 ₹59,402.6 Lowest | 8.03 ₹4,77,002.88 |
| 9.00 | Extra on earthwork for laying in 15 to 25 cms layers including Dressing and Watering as per specifications (Water to be made available by the department at one place of work site). | 37,516.9 | Cum | 8 ₹3,00,135.2 | 5 ₹1,87,584.5 Lowest | 10.29 ₹3,86,048.9 |
| 10.00 | Compaction of earthwork by mechanically operated Vibro-Compactor/ any other mechanical means to attain a density 95% of Maximum Dry Density. | 37,516.9 | Cum | 30 ₹11,25,507 Lowest | 30 ₹11,25,507 Lowest | 32 ₹12,00,540.8 |
Tender Value
₹27.5 Cr
EMD Value
₹55.0 L
Closing Date
17 Jul 2024, 6:00 pmClosed
Chief Engineer
Office of the Chief Engineer Water Resources(North) Hanumangarh
Rehabilitation of different reaches of various canals of Nohar Irrigation Project Part-I sub-project, District Hanumangarh
2024_WRDAS_394001_5
CE_NIB_01_2024-25
Open Tender
Civil Works
Item Rate
1095 days
Nohar
As per bid documents
3 documents required · 3 mandatory
₹10,000
Executive Engineer, Water Resources Division
₹55.0 L
Hanumangarh
17 Sept 2024
13 Jun 2024
18 Jul 2024
13 Jun 2024
17 Jul 2024
13 Jun 2024
24 Jun 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Juli Flora /sarkanda
prooting Juli Flora /sarkanda, pahari kikar or arrows upto 0.50m. depth below ground level. | 2,13,320 | Sqm | - | - |
| 2 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m
30 Cm. to below 60 Cm. Girth | 705 | Each | - | - |
| 3 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 60 Cm. to below 120 Cm. Girth | 480 | Each | - | - |
| 4 | Silt Clearance/ Removal of blown sand/ Berm Unloading undressed with combined lead upto 50 m. for lined canal section.For FSD more than 2 m. | 2,992.3 | Cum | - | - |
| 5 | S & F in position precast R.C.C. stone (M-15 mix) of standard IRC design including finishing in cement sand mortar 1:3, painting with enamel paint, printing letters and numerals etc. complete (MoRTH specifications clause : 800) Guide stones | 151 | Each | - | - |
| 6 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs and above; Earthwork undressed with combined lead upto 50m. | 69,565.6 | Cum | - | - |
| 7 | Earth work excavation in ordinary soil for distributaries and minors having discharge less than 10 cumecs; Kassi work undressed. | 55,834.3 | Cum | - | - |
| 8 | Add extra for earth taken from private land, land to be arranged by the contractor through private negotiations. Item applicable on certification by Ex. En. that no earth is available within canal boundary.
for uncommand area | 59,402.6 | Cum | - | - |
| 9 | Extra on earthwork for laying in 15 to 25 cms layers including Dressing and Watering as per specifications (Water to be made available by the department at one place of work site). | 37,516.9 | Cum | - | - |
| 10 | Compaction of earthwork by mechanically operated Vibro-Compactor/ any other mechanical means to attain a density 95% of Maximum Dry Density. | 37,516.9 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BiD_DoC_B_SiD.pdf
Tender Documents • 3.80 MB
BOQ_706269.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .