Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
2 Nov 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Block Development Officer
Union office,Rajapalayam
Construction of Bus Shelter at Puthur Village and Panchayat in Rajapalayam Block in MLACDS 2026-27
2026_RDTN_713964_2
A2/2754/2026 Dt 09.10.2026
Open Tender
Civil Works
Item Rate
120 days
Rajapalayam
Refer to Tender Document
5 documents required · 5 mandatory
₹0
₹7,000
Union office,Rajapalayam
14 Oct 2026
14 Oct 2026
2 Nov 2026
14 Oct 2026
2 Nov 2026
14 Oct 2026
22 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Bus Shelter at Puthur Village and Panchayat in Rajapalayam Block in MLACDS 2026-27 | |||||
| 1.01 | Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock requiring blasting, etc., complete as per standard specification. | 11.59 | m3 | - | - |
| 1.02 | Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification. | 5.8 | m3 | - | - |
| 1.03 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 7.37 | m3 | - | - |
| 1.04 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 8.4 | m3 | - | - |
| 1.05 | Reinforced Cement concrete 1:1 1/2:3 mix using 20 mm ISS HBG metal excluding cost of steel but including cost of centering charges. | 10.16 | m3 | - | - |
| 1.06 | Brick work in CM 1:5 using country bricks including all cost and conveyance of materials, labour charges such as curing, etc., complete as per standard specification. | 7.03 | m3 | - | - |
| 1.07 | Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification. | 18.2 | m2 | - | - |
| 1.08 | Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification. | 18.77 | m2 | - | - |
| 1.09 | Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification. | 54.1 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
2_Techbid_Puthur.pdf
Tender Documents • 1.51 MB
BOQ_857723.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .