Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹48.4 LAccepted-AOC 1ST FLOOR FLAT NO A 104 ANANT EMEGINE PURANA BUS STAND KORBA CHHATTISGARH | KORBA | KORBA | CHHATTISGARH | 495678 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | L-2₹41.3 L+₹31,300 (0.76%)Rejected-Finance MISSION HOSPITAL CHOWK KEDARPUR AMBIKAPUR DIST SURGUJA CG 497001 | AMBIKAPUR | SURGUJA | CHHATTISGARH | 497001 | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status | |
| 3 | L-3₹45.7 L+₹4.7 L (11.4%)Rejected-Finance 15 402 ASHOKA RATANA VIDHAN SABHA ROAD SHANKAR NAGAR RAIPUR 492007 | RAIPUR | RAIPUR | CHHATTISGARH | 492007 | L-3 | Rejected-Finance Rejected as the bidder attains L-3 status | |
| 4 | L-4₹50.5 L+₹9.5 L (23.2%)Rejected-Finance 12 NANDGAON PO NIGAHI DISTT SINGRAULI MP 486884 | SINGRAULI | MADHYA PRADESH | 486884 | L-4 | Rejected-Finance Rejected as the bidder attains L-4 status |
Tender Value
₹1.1 Cr
EMD Value
₹1.4 L
Closing Date
30 Apr 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Assistance in the day-to-day work of diversion, shifting and extension of lighting infrastructure of Quarry, subsequent to opening of departmental mining patches at Suwabhondi and deployment of several contractual mining patches at DEP.
2024_SECL_306500_1
SECL/GM/DA/SO(EnM)/ e-tender/24-25/04 dtd-11/04/24
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
6 documents required · 6 mandatory
₹1.4 L
26 Aug 2024
12 Apr 2024
2 May 2024
12 Apr 2024
30 Apr 2024
13 Apr 2024
12 Apr 2024 - 23 Apr 2024
Amount
Transportation of poles loading onto departmental truck from stock yard, unloading from truck and shifting from road side to pole pit
Shifting of materials other than poles from stockyard to pole pit
Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting with OB stone boulder without cement, sand and stone aggregate etc., as required.
Erection of stay set complete : Supply of GI stay set along with all accessories and fixing of stay set with stay insulator including excavation for stay pit and grouting with OB, boulder and cement.
Supply of Brown glazed porcelain LT shackle insulator alongwith shackle straps and nut-bolt and erection of the same on overhead line poles as required.
Dismantling of 9/10/11 mtr poles with bracket etc.
Dismantling of overhead line (2/3/4 wire) comprising of ACSR RABBIT conductor, GI Wire, cross arms, insulators etc as required.
Stringing of one circuit Km of RABBIT conductor (2 wire- 4 wire), including un-coiling from drum, transporting to site, laying of conductor along route, stringing and binding on insulators and jumpering.
Laying & Stringing of 1 Km of earth wire including supply of 8 SWG/4 mm G.I wire.
Erection of cradle guarding including supply of 8 SWG/4 mm G.I wire, fabrication of the cradle guard and fixing onto guarding channels.
Supply and erection of Guy insulators, for providing leakage protection of stay wire.
Supplying and fixing of MS nut bolt of different size as required.
Fabrication of MS Channel/Angle/Flat for bracket or clamp as per requirement.
Supplying and fixing of light fixing brackets made of 32 mm dia X 2.00 m long G.I pipe for mounting of street light fittings on poles, including bending the pipe to the required shape, 2 nos. 40 mm X 3 mm flat iron clamps with nuts, bolts and washers, painting the flat iron with primer and finish paint etc. as required.
Removing and fitting of LED lights
Note: The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 08 nos.
Total impact of GST for the purpose of CTC
MS R.P. JAISWAL
R.R. ENGINEERS AND SURVEYORS
DUCK CONSTRUCTION COMPANY
techsummary_317609.pdf
PDF • 1.51 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_317609.pdf
PDF • 1.94 MB
LOA04.pdf
PDF • 1.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .