| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Fee/PreQual/Technical/Finance | -34.19% | ₹5.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.1 L+₹88,492.63 (17.0%)Admitted-Fee/PreQual/Technical/Finance | -23.00% | ₹6.1 L+₹88,492.63 (17.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.0 L+₹1.8 L (33.9%)Admitted-Fee/PreQual/Technical/Finance | -11.90% | ₹7.0 L+₹1.8 L (33.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.9 L
EMD Value
₹15,820
Closing Date
12 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Permanent Restoration of Jalindora to Chuntiwari Bridge
2026_PWDJK_319877_1
(RnB) E-NIT No 37 of 2026-27 EE-RnB-Grz-4540-46 E-tendering Dated-06-08-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Executive Engineer RnB Division Gurez
₹15,820
Executive Engineer RnB Division Gurez
17 Aug 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
12 Aug 2026
7 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 15.2.1 1:3:6 or richer mix (i/c equivalent design mix). | 7.8 | Cum | 1,725.2 | ₹13,456.56 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of Soil. | 98.28 | Cum | 256.85 | ₹25,243.22 |
| 3 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 141.81 | Cum | 3,093.3 | ₹4,38,660.87 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto floor v- level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size).Nallah incl.carriage complete job. | 38.53 | Cum | 6,300 | ₹2,42,764.2 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 112.4 | Sqm | 628.95 | ₹70,693.98 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1061069.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .