Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance | -34.01% | ₹3.6 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 L+₹3,304.38 (0.91%)Admitted-Finance | -33.41% | ₹3.7 L+₹3,304.38 (0.91%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 L+₹6,608.76 (1.82%)Admitted-Finance | -32.81% | ₹3.7 L+₹6,608.76 (1.82%) | L3 | Admitted-Finance |
| 4 | L4₹4.1 L+₹46,867.15 (12.9%)Admitted-Finance | -25.50% | ₹4.1 L+₹46,867.15 (12.9%) | L4 | Admitted-Finance |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
11 Aug 2026, 6:00 pmClosed
DFO REASI
DFO REASI HQ REASI
Construction of Check Dam Compt. 89/K at Oli Mata Deva Mai road in Katra Range in Reasi Forest Division under Fencing and Plantation of Religious Places UT CAPEX FY 2026-27
2026_FD_319139_1
e-NIT No. 14 of 2026-27 dated 03-08-2026
Open Tender
Civil Works
Percentage
30 days
KATRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
DFO REASI
₹11,000
14 Aug 2026
3 Aug 2026
12 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
3 Aug 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil | 24.78 | Cum | 479.3 | ₹11,877.05 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | 2.02 | Cum | 4,826.5 | ₹9,749.53 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 0.51 | Cum | 5,733.6 | ₹2,924.14 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 42.48 | Cum | 7,104.35 | ₹3,01,792.79 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level @30 per cum of concrete | 1,274.28 | Kg | 123.2 | ₹1,56,991.3 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 74.35 | Sqm | 286.35 | ₹21,290.12 |
| 7 | 12mm Cement plaster of mix:
1 : 6 ( 1 cement : 6 fine sand) | 55.76 | Sqm | 266.2 | ₹14,843.31 |
| 8 | carriage of material Sand 30km | 20.03 | cum | 520.34 | ₹10,422.41 |
| 9 | carriage of material bajri 30km | 40.05 | cum | 520.34 | ₹20,839.62 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1055789.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .