| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance PVNN ROAD PO DIST COOCH BEHAR PIN 736101 | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | +2.98% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 CrAdmitted-Finance P O PETLA P S DINHATA DIST COOCHBEHAR | DINHATA | COOCHBEHAR | WEST BENGAL | +6.99% | ₹1.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.4 CrAdmitted-Finance HAZRAPARA NUTAN BAZAR DIST COOCH BEHAR PIN 736101 | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | +10.00% | ₹1.4 Cr | L3 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
28 Jan 2026, 3:00 pmClosed
SE NBHC
SE NBHC SAKTIGARH SILIGURI
Construction of 01 (One) no. triple cell of size 4 m X 4 m RCC Box culvert at ch. 6.344 km of Tufanganj Balabhut Road under Cooch Behar Highway Division in the district of Cooch Behar.
2026_SH_982505_1
WBPWD/PW(R)/SE/NBHC/NIeT No. 37 OF 2025-26
Open Tender
CIVIL WORKS
120 days
COOCH BEAHR
Please refer Tender documents.
4 documents required · 4 mandatory
₹2.5 L
Yes
OFFICE OF SE NBHC
6 Mar 2026
2 Jan 2026
30 Jan 2026
3 Jan 2026
28 Jan 2026
8 Jan 2026
8 Jan 2026
CROSS DRAINAGE WORKS Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. upto 3 m depth With pumping out water including shoring as required.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. Where staging is not required.
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
Supplying & Labour for weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I wire. (With 100mm x 100mm mesh.)ࠂ牐癯摩湩湡慬楹杮䐠獥杩楍⁸潣据敲整映牯瀠慬湩⼠爠楥普牯散潣据敲整眠牯湩愠祮瀠牡⁴景戠楲杤攨捸畬楤杮戠瑯潴汰杵楧杮 楷桴挠慯獲条牧来瑡獥漠灡牰灯楲瑡潮業慮楳敺愠摮朠慲楤杮楦敮愠杧敲慧整⠠慳摮 潣普牯業杮琠牰灯牥朠慲楤杮稠湯ⱥ戠瑯景愠灰潲敶畱污瑩⁹湡散敭瑮獡渠捥獥慳祲湩汣摵湩慬潢牵潣瑳愠摮挠牡楲条景愠汬洠瑡牥慩獬愠摮椠据畬楤杮瀠敲慰慲楴湯漠敤楳湧洠硩灡牰癯污漠桴慳敭戠⁹桴湅楧敮牥椭桃牡敧愠摮挠獯⁴潦畱污瑩⁹潣瑮潲ⱬ猠浡汰湩Ⱨ琠獥楴杮攠捴污潣灭敬整戠瑵攠捸畬楤杮挠獯⁴景氠扡畯湡慭整楲污潦潦浲潷歲☠爠楥普牯散敭瑮眠牯獫䴊ㄭ‵片摡ⱥ唠楳杮挠湯牣瑥業數ਠ獕湩䅐啋⁒慶楲瑥⁹瑳湯档灩ɋʻĈ倀慬湩⼠删楥普牯散敃敭瑮䌠湯牣瑥湩匠
Bituminous Macadam using Mobile Hot Mix Plant (Light Duty) Providing and laying bituminous macadam with Mobile Hot Mix Plant (Light Duty) using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature by means of approved and suitable arrangements to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Specifications for Road & Bridge Works of MoRT&H (5th Revision) For Grading 2 (19 mm nominal size, 50-75 mm thick.) 50 mm thickness Using PAKUR variety stone chips VG - 30 (Packed) bitumen
Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with reinforced cement concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer-in-Charge, all as specified.
DIVERSION WORKS Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works) Extra for carriage of all kinds of earth by Mechanical Transport: Carriage up to total lead of 4.0 km., (with initial lead upto 1 KM) Land arrranged by the Contractor with Royalty & Cess
Supplying & Labour for weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I wire. (With 100mm x 100mm mesh.)ࠂ牐癯摩湩湡慬楹杮䐠獥杩楍⁸潣据敲整映牯瀠慬湩⼠爠楥普牯散潣据敲整眠牯湩愠祮瀠牡⁴景戠楲杤攨捸畬楤杮戠瑯潴汰杵楧杮 楷桴挠慯獲条牧来瑡獥漠灡牰灯楲瑡潮業慮楳敺愠摮朠慲楤杮楦敮愠杧敲慧整⠠慳摮 潣普牯業杮琠牰灯牥朠慲楤杮稠湯ⱥ戠瑯景愠灰潲敶畱污瑩⁹湡散敭瑮獡渠捥獥慳祲湩汣摵湩慬潢牵潣瑳愠摮挠牡楲条景愠汬洠瑡牥慩獬愠摮椠据畬楤杮瀠敲慰慲楴湯漠敤楳湧洠硩灡牰癯污漠桴慳敭戠⁹桴湅楧敮牥椭桃牡敧愠摮挠獯⁴潦畱污瑩⁹潣瑮潲ⱬ猠浡汰湩Ⱨ琠獥楴杮攠捴污潣灭敬整戠瑵攠捸畬楤杮挠獯⁴景氠扡畯湡慭整楲污潦潦浲潷歲☠爠楥普牯散敭瑮眠牯獫䴊ㄭ‵片摡ⱥ唠楳杮挠湯牣瑥業數ਠ獕湩䅐啋⁒慶楲瑥⁹瑳湯档灩ɋʻĈ倀慬湩⼠删楥普牯散敃敭瑮䌠湯牣瑥湩匠
Construction of Sub Base using Local Materials: Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For Construction of Sub Base by compacting river bed materials. (with stacking) Using NB variety materials RBM @ 1.28 m3 / m3
Supplying empty Cement bags in good condition and filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. Fine Sand
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_2396607.pdf
techsummary_2396607.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_2396607.xls
BOQ • 0.34 MB
2911new.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid