Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
6 Nov 2023, 3:00 pmClosed
SE EDC-II RAEBARELI
SE EDC-II GORABAZAR RAEBARELI
INCREASING CAPACITY OF DIFFERNCE TYPE POWER TRANSFORMERS
2023_MVVNL_857980_1
RE TENDER 102/EDCR-II/2023-24
Open Tender
Electrical Works
Item Wise
30 days
EEEDD SALON RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/C NO-081205500344,IFSC-ICIC0000812
₹12,000
Yes
17 Nov 2023
31 Oct 2023
7 Nov 2023
31 Oct 2023
6 Nov 2023
31 Oct 2023
Amount
INSTALLATION OF NEW TRANSFORMER 25 KVA (04 NOS) AT VILLAGE RAJEEV NAGAR, BIRNAWA MOD, MEHANDI GANJ NEAR PETROL PUMP, NAI DUNIYA, NEW 63 KVA T/F (01 NO.) AT VILLAGE BHAINAPUR AND NEW 100 T/F (01 NO.) AT VILLAGE LALA KI BAZAR NASIRABAD AND INCREASING CAPACITY OF T/F FROM 63 KVA TO 100 KVA 3Ø (16 NOS) AT VILLAGE SANDA SAIDAN, GADDIPUR, RAGHUPUR, ASRAFGANJ, RATASHO, KANJIHAR, AUNANISH, ATA NAGAR, MOHAMADABAD, RAJAPUR CHAK BIBI, MADHAUPUR PATHAK, MADHAUPUR NINAIYA, ATAGANJ USARI, AERI DEEH AND INCREASING CAPACITY OF TRANSFORMER FROM 100 KVA TO 250 KVA (05 NOS) AT VILLAGE GAUSHALA PARSHADEPUR, LALAPUR SALON, ALI HASAN KA PURWA, ATA GANJ, KARAHIYA BAZAR, AND INCREASING CAPACITY OF TRANSFORMER FROM 250 KVA TO 400 KVA ( 01 no.) AT BANK OF BARODA PARSHADEPUR UNDER EXTRA BUSINESS PLAN 2023-24 IN GEOGRAPHICAL AREA OF EXECUTIVE ENGINEER, ELCTRICITY DISTRIBUTION DIVISION-LALGANJ IN JURIDICTION OF EXECUTIVE ENGINEER, ELCTRICITY DISTRIBUTION DIVISION-SALON, RAEBARELI. ( TOTAL 28 NOS. )
Safe Loading & Carriage including Loading-unloading and proper Stacking at a place of work site of following store material from ESC-Tripula to site of work
25 KVA Transformers
63 KVA Transformers
100 KVA Transformes
250 KVA Transformes
400 KVA Transformes
PCC Pole 8.5 Mtr long
Top Channel
T Off Channel
Dropper Channel
Pin Insulator with Pin
S/S Base angle
Disc Insulator with Fitting
Earthing Set Complete
Stay Set complete
LT PVC Cable AL.(1X240 sqmm)
ACSR Weasal Conductor
Labour and Errection charges
Work for Dismanteling of Existing 250 KVA T/F along with all acceseries with loading-uploading as per estimate.
Work for Dismanteling of Existing 100 KVA T/F along with all acceseries with loading-uploading as per estimate.
Work for Dismanteling of Existing 63 KVA T/F along with all acceseries with loading-uploading as per estimate.
Digging of Pits of PCC Pole 8.5 Mtr Long from Dump Site to pit Site then errection of PCC poles with including all related accesories as per resspo norms. As per Estimate.
Digging of Pits of PCC Pole 8.5 Mtr Long then making/grouting of double pole structure by pcc pole with grouting materals and fitting of all required accesories for mounting of T/F on D/pole as per resspo norms. As per Estimate.
Work for Mounting of 25 KVA T/F on new making of D/pole along with fitting of all accesories as per resspo norms. As per Estimate.
Work for Mounting of 63 KVA T/F on new D/pole along with fitting of all accesories as per resspo norms. As per Estimate.
Work for Mounting of 100 KVA T/F on existing D/pole along with fitting of all accesories as per resspo norms. As per Estimate.
The work for Earth excavation of new Plinth size 2.00X2.00X1.50 & size for making outer wall of Plinth by 1st class brick work in Cement mortar of ratio1:6 of filling earth in Plinth and providing Ston ballast and fixing 02 No.90 Iballs Rail pieces (6.9 Mtr) of proper distance and then plastering the top and all side of plinth wall with cement Corse and sand in ratio 1:4 and then proper spraying of water alongwith All materials & Labour for Mounting of 250/400 KVA T/Fs on Plinth. NOTE:- ALL REQUIRED MATERIALS WILL BE PROVIDED BY CONTRACTOR TO OWN RESOURCES.
Work for Mounting of 250 KVA Transformers on New Plinth alongwith fitting of all acessories, As per RESPO norms. at the VillageJagatpur Chauraha, Gadaganj, Gaura Bazar. Dharai Chauraha, Ashikabad, Dharai gaon, Ashika bad, Paksarawa and Village Dhamauli under EDD Unchahar, Raebareli.
Work for Mounting of 400 KVA Transformers on New Plinth alongwith fitting of all acessories, As per RESPO norms. at the VillageJagatpur Chauraha, Gadaganj, Gaura Bazar. Dharai Chauraha, Ashikabad, Dharai gaon, Ashika bad, Paksarawa and Village Dhamauli under EDD Unchahar, Raebareli.
Earthing of 250 T/F 11/0.4 KV and 400 KVA Power T/F completed for 60 ft. Borwell Type Pit( 1.5 " Dimeter) to install 60Ft. Long M.S. Pipe (60 fit Long) with 1.5 Diameter, work followed by Contractor of M.S. Strip 50X6 mm size for suitable lenth to G.I. Pipe through Proper building (Aluminium paint covering of welded Joint) with Tightening of nuts & Bolt and filling of spaces by homogeneous mixture of coke & sault against medium PowerTransformer body & Neutral earthing thes included connection of M.S. Strip to sapret common pit as there will be one pit of each earthing. NOTE:- ALL REQUIRED MATERIALS WILL BE PROVIDED BY CONTRACTOR TO OWN RESOURCES.
Making/Errection/Installation/painting/gouting/welding/febrication/earthig work of Wirmesh Fancing of Jali alongwith Angle isn size of 35X35X5X2500 mm with Nut & Bolts, Washer, Earthing Rod & G.I. wire. Making of 01 No. Gate by M.S. Angle in size of 35X35X5X1000 mm with Nut & Bolts Washer, Earthing Rod & G.I. wire. One No. Gate of M/S Angle in size of 25X5 mm with wiremesh and each of the same. Grouting of M.S. Angle and other required Angles with Grouting materials as per RESPO Norms, under BUSINESS PLAN 2023-24. All required material will be provided by contractor.
Earthing of 25 KVA T/F body and Neutral of T/F Complete work as per resspo norms.
Earthing of 63 KVA T/F body and Neutral of T/F Complete work as per resspo norms.
Earthing of 100 KVA T/F body and Neutral of T/F Complete work as per resspo norms.
Digging of Pits fixing and grouting of stay Rods as per resspo norms. Including with grouting materials there after fixing and freezing of Stay wire.
Earthing of PCC pole as per resspo norms as Required.
Stringing, laying, sagging of 11 KV line by ACSR Weasel Conductor as per resspo norms.
Febrication of line materials like Top channel, Dropper Channel, Pin Insulator with Pin S/S Base Angle and Disc Insulator with Fitting and other misc. Works as per required.
Recd back of old 63 KVA T/F from work site to ESC-Tripula Raebareli along with loading-unloading.
Recd back of old 100 KVA T/F from work site to ESC-Tripula Raebareli along with loading-unloading.
Recd back of old 250 KVA T/F from work site to ESC-Tripula Raebareli along with loading-unloading.
Recd back of other scrat material from work site to ESC-Tripula raebareli after dismanteling of T/F & Lines along with loading-unloading.
Work for Installation/fixing of LT PVC Cable AL.(1X240 sqmm)
M/S Shiv Traders
NATIONAL ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .