Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BAMNA HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 2 | Admitted-Finance NAGLA SADAK HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
20 Sept 2023, 12:00 pmClosed
se
edc hathras
Semi TurnKey
2023_DVVNL_837569_1
EDCH-70/2023-24
Open Tender
Electrical Works
Item Rate
180 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
DVVNL WEBSITE
₹15,000
10 Oct 2023
13 Sept 2023
20 Sept 2023
13 Sept 2023
20 Sept 2023
13 Sept 2023
Amount
Supply of Following Matarial as per relevent ISS
11 Kv Fuse Set
MS Channel 125*65*1300 MM
Stone pad
Tee Off Channal
Painting Number Mark with paint
Top Channal
Holding clamp Top Channel, TPMO etc
T/F Base Angle 75*75*6*2028 mm with clamp nut & Bolt
Pearcing Connector
Suspension clamp with I Hook Complete
Dead end Clamp
Dropper Channal
Guarding Angle Complete
Scope of work
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
8.5 Mtr. long PCC Poles.
9/11 Mtr Long STP Poles.
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
Incoming VCB 600/300/5 AMP 350 MVA
Outgoing VCB 200/100/5 AMP 350 MVA
Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
25/63/100 KVA T/F
Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
PCC poles 8.5/9 Mtr.
9/11 Mtr Long STP Poles.
Double pole complet fitting
Fixing/ Errection of new 11 KV switch gears with Grouting as per respoo manual all cost of labor, material and T&P which required for completion of work
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Weasal conductor
ACSR DOG Conductor
Resagging of Existing line by stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Weasal conductor
ACSR DOG Conductor
AB Cable 50/95/120 sqmm
Fixing of Following Accessirious
11 KV TPMO
11 Kv Fuse Set
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
25/63/100 KVA T/F
Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
Re Guarding / Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Safe Dismenteling of old 5 MVA T/F from Foundation with opening of all HT Jumpers, opening of radiators, draining of oil all works which required for dismentling of power T/F and carriage it from switch yard to out side boundary all cost of labour and T&P which required for completion of work
Making of all HT Jumpers of new 10 MVA T/F after completion of work all cost of labour and T&P
Back Cartage of Following Matarial
Acsr weasal Conductor scrap
Scrap old Incoming VCB
Scrap old Outgoing VCB
LT PVC Cable Scrap
R.N. ELECTRICAL WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .