| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 CrAdmitted-Finance OPP AIR FORCE STATION VPO SORANA DISTT SAHARANPUR UP PIN 247 232 | SAHARANPUR | UTTAR PRADESH | 247232 | ₹12.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹16.3 Cr+₹3.4 Cr (26.2%)Admitted-Finance | ₹16.3 Cr+₹3.4 Cr (26.2%) | L2 | Admitted-Finance |
| 3 | L3₹16.8 Cr+₹3.9 Cr (30.2%)Admitted-Finance | ₹16.8 Cr+₹3.9 Cr (30.2%) | L3 | Admitted-Finance |
| 4 | L4₹18.6 Cr+₹5.7 Cr (44.1%)Admitted-Finance | ₹18.6 Cr+₹5.7 Cr (44.1%) | L4 | Admitted-Finance |
| 5 | L5₹18.7 Cr+₹5.8 Cr (45.4%)Admitted-Finance | ₹18.7 Cr+₹5.8 Cr (45.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DES RAJ AND SONS BUILDERS PVT LTD L3 | M/s Innovative Coolings and Constructions L4 | M/s Banwari Lal Suresh Kumar L5 | TRIVENI CONSTRUCTIONS L2 | AKB INFRATECH PVT. LTD. L6 | SUBHASH CHAND CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 5 signifies this fact only. | |||||||||
| 1.01 | Construction of JCO's Married Accn, triple Storey building (G+2) of 05 quarters including scooter parkings, RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 1 | Each Block | 1,14,00,000 ₹1,14,00,000 | 1,22,50,000 ₹1,22,50,000 | 1,20,00,000 ₹1,20,00,000 | 1,40,00,000 ₹1,40,00,000 | 1,40,00,000 ₹1,40,00,000 | 75,00,000 ₹75,00,000 Lowest |
| 1.02 | Construction of OR's Married Accn, triple Storey building (G+2) of 06 quarters including porch parking, RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 3 | Each Block | 96,00,000 ₹2,88,00,000 | 1,05,00,000 ₹3,15,00,000 | 1,13,00,000 ₹3,39,00,000 | 90,00,000 ₹2,70,00,000 | 1,40,00,000 ₹4,20,00,000 | 77,00,000 ₹2,31,00,000 Lowest |
| 1.03 | Construction of OR's Married Accn, triple Storey building (G+2) of 08 quarters (X-1 Block) including scooter parking, RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 2 | Each Block | 1,40,00,000 ₹2,80,00,000 | 1,70,00,000 ₹3,40,00,000 | 1,51,00,000 ₹3,02,00,000 | 1,20,00,000 ₹2,40,00,000 | 1,85,00,000 ₹3,70,00,000 | 1,09,00,000 ₹2,18,00,000 Lowest |
| 1.04 | Construction of OR's Married Accn, triple Storey building (G+2) of 06 quarters (X-2 Block), RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 2 | Each Block | 95,00,000 ₹1,90,00,000 | 1,05,00,000 ₹2,10,00,000 | 1,13,00,000 ₹2,26,00,000 | 90,00,000 ₹1,80,00,000 | 1,20,00,000 ₹2,40,00,000 | 68,00,000 ₹1,36,00,000 Lowest |
| 1.05 | Construction of OR's Married Accn, triple Storey building (G+2) of 12 quarters including scooter parking, RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 2 | Each Block | 1,94,00,000 ₹3,88,00,000 | 2,25,00,000 ₹4,50,00,000 | 2,28,48,000 ₹4,56,96,000 | 1,80,00,000 ₹3,60,00,000 | 2,30,00,000 ₹4,60,00,000 | 1,42,00,000 ₹2,84,00,000 Lowest |
| 2.00NOTE: Schedule ‘A’ Part - II to Part -X under Ser No 2.01 to 2.09 are Prepriced by MES. | |||||||||
| 2.01 | Lump sum price worked out by the Contractor for “ SITE CLEARANCE, EXCAVATION AND EARTH WORK ” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 29,39,715.77 ₹29,39,715.77 Lowest | 37,21,159.2 ₹37,21,159.2 | 33,00,000 ₹33,00,000 | 37,21,159.2 ₹37,21,159.2 | 38,00,000 ₹38,00,000 | 33,20,000 ₹33,20,000 |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS) ” as listed in Schedule ‘A’ Part III | 1 | Lump sum | 82,82,093.3 ₹82,82,093.3 Lowest | 96,30,341.05 ₹96,30,341.05 | 96,30,341 ₹96,30,341 | 96,30,341.05 ₹96,30,341.05 | 1,19,64,249 ₹1,19,64,249 | 86,00,000 ₹86,00,000 |
| 2.03 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 31,83,015.53 ₹31,83,015.53 | 24,80,271.84 ₹24,80,271.84 | 32,00,000 ₹32,00,000 | 37,50,000 ₹37,50,000 | 30,00,000 ₹30,00,000 | 18,50,000 ₹18,50,000 Lowest |
Tender Value
₹14.3 Cr
EMD Value
₹10.4 L
Closing Date
17 Aug 2026, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-10
WORK SERVICES FOR DEFICIENT MD ACCN FOR DSC PERSONNEL AT AF STN CHANDIGARH
2026_MES_773195_1
CEWAC/CHD/T-12/2026-27
Open Tender
Civil Works
Lump-sum
540 days
GE (AF) CHANDIGARH
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,000
GE (AF) CHANDIGARH
₹10.4 L
Yes
1 Sept 2026
30 Jun 2026
19 Aug 2026
30 Jun 2026
17 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 5 signifies this fact only. | |||||
| - | Construction of JCO's Married Accn triple Storey building (G+2) of 05 quarters including parking with RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 1 | Each Block | - | - |
| 1.02 | Construction of OR's Married Accn triple Storey building (G+2) of 06 quarters including parking with RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 3 | Each Block | - | - |
| - | Construction of OR's Married Accn triple Storey building (G+2) of 08 quarters (X-1) and 06 quarters (X-2) including parking with RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 2 | Each Block | - | - |
| - | Construction of OR's Married Accn triple Storey building (G+2) of 12 quarters including parking with RCC framed structure with permanent specifications complete all as specified and as shown on drawings. | 2 | Each Block | - | - |
| - | Lump sum price worked out by the Contractor for “ SITE CLEARANCE, EXCAVATION AND EARTH WORK ” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 37,21,159.2 | ₹37,21,159.2 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS) ” as listed in Schedule ‘A’ Part III | 1 | Lump sum | 1,05,84,054.17 | ₹1,05,84,054.17 |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 20,66,893.2 | ₹20,66,893.2 |
| - | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL WORKS” as listed in Schedule ‘A’ Part -V | 1 | Lump sum | 17,08,863.92 | ₹17,08,863.92 |
| - | Lump sum price worked out by the Contractor for “ROAD AND PATH WORKS” as listed in Schedule ‘A’ Part- VI | 1 | Lump sum | 40,81,155.5 | ₹40,81,155.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
drawings.pdf
Additional Documents • 31.10 MB
Tender.pdf
Tender Documents • 5.58 MB
BOQ_868340.xls
BOQ • 0.52 MB
doc03647720260812132958.pdf
PDF • 2.19 MB
Corrigendum03.pdf
PDF • 2.81 MB
Corrigendum02.pdf
PDF • 14.98 MB
Coveringletter.pdf
PDF • 0.64 MB
Corrigendum01.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .