Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹82,011.89 | ₹82,011.89 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
15 May 2026, 2:15 pmClosed
UNDER FRAME (LWLRRM PP)
02261285
02261285
Open - Indigenous
Chennai, Unknown (Unspecified Location)
₹0
₹1.8 L
30 Jun 2026
24 Apr 2026
Description :UNDERFRAME COMPLETE FOR LWLRRM AMRIT BHARAT COACHES TO DRG. NO.LP11103, ALT d, ANX 9 WITHOUT ITEM 30 TO DRG. NO.1.11012.0.03.095.001 WITH ADDITIONAL BRACKETS TO DRG NO 53811115, Alt 'a'. THE MANUFACTURING FACILITY AS PER ICF/MD/SPEC-147, ISSUE STATUS-0 1, REV-02 WITH AMENDMENT No.'02'. Special Condition : THE UNDERFRAME SHOULD BE SUPPLIED AS NORMAL SIDE UP AND SIDE BEARER SIDE DOWN. PACKING CONDITION AS PER DRG NO. ICF/J&T/MISC- 2487, Alt 'b'. STAGE INSPECTION DETAILS. (a) Raw Material Stage # Ensure the raw material used usin g portable spectrometer (b) Jig stage # Assembly of front part with sole bar. # Assembly of modular fr ame arrangement. # Weld parameters to be checked & recorded (c) Trestle stage # Marking, Drilling & Tapping of holes wherever necessary. # Marking & placing of detail items. # Complete welding whe rever necessary. # Weld parameters to be checked & recorded # Assembly & Welding of trough sheet s. # Dimensional & Visual checks. # Punching of Serial No & ensuring proper traceability. (d) Surface p reparation and painting stage. # Short/Sand blast to the requirements. # Painting process as per the s pecification. # Visual inspection. # Final product Inspection. Note: Application of Aluminium welding co at to RCF spec MDTS-28272 latest revision on top surface of cross members shall be ensured before w elding the trough floor with cross members to avoid bi-metallic corrossion.[SAFETY ITEM] [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] Consignee LHB DEPOT/ICF,Chennai, ICF Tamil Nadu 7.00 Numbers UVAM Item ref. ( Item Id :- 2400018 - Under Frame Complete for LHB Coaches , Sub Item Id:-2400018001 - Under Frame Complete for LHB Coaches ) Product Inspection:Stage 1: Raw Material Stage (Ref: Desc) (100% of PO Qty ), Stage Inspection 2: Jig stage (Ref: Desc) (100% of PO Qty ), Stage 3: Trestle stage (Ref: Desc) (100% of PO Details Qty ), Stage 4: Surface preparation and painting stage (Ref: Desc) (100% of PO Qty )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5732306.pdf
ATTACHMENT
5732308.pdf
ATTACHMENT
5731738.pdf
ATTACHMENT
5732974.pdf
ATTACHMENT
5732976.pdf
ATTACHMENT
5732989.pdf
ATTACHMENT
5732980.pdf
ATTACHMENT
5732981.pdf
ATTACHMENT
5732983.pdf
ATTACHMENT
5732985.pdf
ATTACHMENT
5732978.pdf
ATTACHMENT
Download all tender documents and submit your bid